设计毕业设计计算书-环江至大沙坡二级公路no14合同段

沙喷子  时间:2021-03-07  阅读:()

广西科技大学筹

毕业设计论文

环江至大沙坡二级公路NO. 14合同段

广西*柳州

2012年4月12日

精品目 录可编辑

摘 要„„„„„„„„„„„„„„„„„„„„„„„„„„„„„„„3

第一部分 绪论„„„„„„„„„„„„„„„„„„„„„„„„„„„4

一、课题背景„„„„„„„„„„„„„„„„„„„„„„„„„„„„„4

二、课题意义„„„„„„„„„„„„„„„„„„„„„„„„„„„„„4

三、课题研究主要内容„„„„„„„„„„„„„„„„„„„„„„„„„4

第二部分设计资料„„„„„„„„„„„„„„„„„„„„„„„„„„5

一、地形、地貌„„„„„„„„„„„„„„„„„„„„„„„„„„„„5

二、河流及水系„„„„„„„„„„„„„„„„„„„„„„„„„„„„5

三、气象„„„„„„„„„„„„„„„„„„„„„„„„„„„„„„„5

四、地震„„„„„„„„„„„„„„„„„„„„„„„„„„„„„„„5

五、设计标准„„„„„„„„„„„„„„„„„„„„„„„„„„„„„6

六、筑路材料„„„„„„„„„„„„„„„„„„„„„„„„„„„„„6

第三部分平、纵、横三维断面设计„„„„„„„„„„„„„„„„„„„8

一、选线„„„„„„„„„„„„„„„„„„„„„„„„„„„„„„„8

二、平面线形设计的基本要求„„„„„„„„„„„„„„„„„„„„„„8

1.平曲线线形设计一般原则„„„„„„„„„„„„„„„„„„„„„8

2.平纵横综合设计„„„„„„„„„„„„„„„„„„„„„„„„„8

三、设计方案甲„„„„„„„„„„„„„„„„„„„„„„„„„„„„9

1.平面线形设计„„„„„„„„„„„„„„„„„„„„„„„„„„9

2.纵断面设计„„„„„„„„„„„„„„„„„„„„„„„„„„13

四、设计方案乙„„„„„„„„„„„„„„„„„„„„„„„„„„„15

1.平面线形设计„„„„„„„„„„„„„„„„„„„„„„„„„15

2.纵断面设计„„„„„„„„„„„„„„„„„„„„„„„„„„17

五、路线方案比选和论证„„„„„„„„„„„„„„„„„„„„„„„18

六、道路等级的确定„„„„„„„„„„„„„„„„„„„„„„„„„18

七、纵断面设计„„„„„„„„„„„„„„„„„„„„„„„„„„„19

1.线形设计„„„„„„„„„„„„„„„„„„„„„„„„„„„19

2.纵坡设计纵坡设计的一般要求„„„„„„„„„„„„„„„„„„19

3.纵坡设计的方法和步骤„„„„„„„„„„„„„„„„„„„„„19

4.竖曲线设计要求„„„„„„„„„„„„„„„„„„„„„„„„20

5.纵断面设计步骤„„„„„„„„„„„„„„„„„„„„„„„„21

八、竖曲线计算„„„„„„„„„„„„„„„„„„„„„„„„„„„22

九、横断面设计„„„„„„„„„„„„„„„„„„„„„„„„„„„23

1.查规范得各项技术指标„„„„„„„„„„„„„„„„„„„„24

2.横断面设计步骤„„„„„„„„„„„„„„„„„„„„„„„„25

3.超高加宽计算„„„„„„„„„„„„„„„„„„„„„„„„„25

十、土石方的计算和调配„„„„„„„„„„„„„„„„„„„„„„„26

第四部分路基设计„„„„„„„„„„„„„„„„„„„„„„„„„„27

一、路基设计„„„„„„„„„„„„„„„„„„„„„„„„„„„„27

1.路基横断面布置„„„„„„„„„„„„„„„„„„„„„„„„„27

2.路基最小填土高度„„„„„„„„„„„„„„„„„„„„„„„„28

3.路基边坡„„„„„„„„„„„„„„„„„„„„„„„„„„„„28

4.路基压实标准及压实度„„„„„„„„„„„„„„„„„„„„„28

5.公路用地宽度„„„„„„„„„„„„„„„„„„„„„„„„„28

6.路基填料„„„„„„„„„„„„„„„„„„„„„„„„„„„„29

7.路基处理„„„„„„„„„„„„„„„„„„„„„„„„„„„„29

8.路基防护„„„„„„„„„„„„„„„„„„„„„„„„„„„„30

9.路基施工的一般规定„„„„„„„„„„„„„„„„„„„„„„„31

10.填方路基的施工„„„„„„„„„„„„„„„„„„„„„„„„32

11.边沟的施工„„„„„„„„„„„„„„„„„„„„„„„„„„32

二、路基路面排水系统设计„„„„„„„„„„„„„„„„„„„„„„33

1.路基排水设计„„„„„„„„„„„„„„„„„„„„„„„„„„33

2.路面排水设计„„„„„„„„„„„„„„„„„„„„„„„„„„33

第五部分 挡土墙设计„„„„„„„„„„„„„„„„„„„„„„„„34

一、仰斜A式挡土墙设计„„„„„„„„„„„„„„„„„„„„„„„35

二、重力式挡土墙设计„„„„„„„„„„„„„„„„„„„„„„„„37

第六部分 涵洞设计„„„„„„„„„„„„„„„„„„„„„„„„„38

一、盖板涵设计„„„„„„„„„„„„„„„„„„„„„„„„„„„38

二、盖板涵涵台计算„„„„„„„„„„„„„„„„„„„„„„„„„„41

三、圆管涵设计„„„„„„„„„„„„„„„„„„„„„„„„„„„43

第七部分 公路路面结构设计计算„„„„„„„„„„„„„„„„„„„„44

一、水泥混凝土路面设计„„„„„„„„„„„„„„„„„„„„„„„44

二、沥青路面设计„„„„„„„„„„„„„„„„„„„„„„„„„„51

三、水泥混凝土与沥青路面方案的最终选择„„„„„„„„„„„„„„„60

结束语„„„„„„„„„„„„„„„„„„„„„„„„„„„„„„61

致 谢„„„„„„„„„„„„„„„„„„„„„„„„„„„„„„„62

参考文献„„„„„„„„„„„„„„„„„„„„„„„„„„„„„„„63

中文摘要

[摘要] 本次设计的任务是环江至大沙坡二级公路NO. 14合同段桩号为K39+000K41+304.675。沿线地质构造较复杂岩性种类多主要以石灰岩为主全长2304.675m,设计时速为60km/h.路基宽10.0米行车道宽7.0米路面两侧硬路肩宽分别为0.75米和土路肩宽分别为0.75米。面层采用水泥混凝土基层为水泥稳定粒料底基层为15cm级配碎石材料。主要完成的设计包括确定公路等级、选择路线的线形、平曲线要素计算、绘制路线纵断面图、竖曲线要素计算、绘制路线典型横断面图、土石方调配、路线超高计算、设计路面结构、路面防护工程设计、路基排水设计、工程预算和施工组织设计 同时设计涵洞共6座其中暗板涵3座 圆管涵3座。

[关键字]  平曲线竖曲线排水路基水泥混凝土路面涵洞

Chinese Abstract

[Abstract]  This design task is Huanjiang to Da ShaPo secondary roads NO. 14contract section,pile no. in the K39 + 000 ~ K41 + 304.675. Along the routeof geological structure is more complex, more kinds lithology, mainly inlimestoneprimarily, the length is 2304.675m, designspeed is 60km/h.Thewidthof the roadbed is 10.0 meters , the width of the running lane is 7.0 m , thewidth of the the road on both sides of the hard road shoulder is 0.75 metersrespectivelyandthewidthof thedirtroadshoulder is0.75 metersrespectively.The roads has portland cement concrete surface course and cement stabilizedbase, subbase layer is 15 cm graded gravel materials. The design of the maincompleted including: sure the highway grade, choose the route alignment ofhighway, flat curve elements calculation, draw route map, vertical curveelements within profile calculated, draw line cross-sectional figure, typicalconditions deployment, high calculation, design route pavement structure, roadsurface protection engineering design, roadbed drainage design, project budgetand the construction organization design, and at the same time,design sixculverts, which contains three dark board culverts, three circular tubeculverts.

[Keywords] : Plane curve, vertical curve, drainage, roadbed, cement concretepavement, culverts.

第一部分 绪论

一、课题背景

环江毛南族自治县位于广西西北部地处桂西北云贵高原东南麓东邻融水、罗城县南接宜州、河池市西隔打狗河与南丹县相望,北与贵州荔波、从江两县毗连。环江至大沙坡二级公路是西南出海大通道的便捷支线也是自治区人民政府为加快交通基础设施建设向社会公开承诺的县县通二级公路的重要路网建设项目之

一。该路线起于环江县思恩镇经古宾、都川终于大沙坡与贵州省荔波至大沙坡公路相接。环江至大沙坡二级公路的建成对促进河池路网及至广西公路的合理布局。进一步改善路网结构改善黔桂两省区沿线人民的生产、生活和投资环境促进两地资源的开发利用加快脱贫致富步伐推动经济进一步发展具有重要意义。

二、课题意义

通过本题目使我在进行公路施工图设计方面进行一次全面的系统的训练使我们能综合运用大学所学课程,系统地巩固基本理论和专业知识培养分析问题和解决问题的独立工作能力;提高计算、绘图、查阅文献、使用规范手册和编写技术文件及计算机辅助设计计算等基本技能,掌握公路设计原则、设计方法、步骤。同时树立正确的设计思想及严谨负责、实事求是、刻苦钻研、勇于创新的作风,具体解决各种级别公路的设计。为今后工作打下良好的基础并能提高我的综合运用知识的能力同时也有助于以后在工作岗位能很快的适应工作环境。

三、课题研究主要内容

1路线方案的拟定与比选

2平面设计

3纵断面设计

4路基横断面设计

5路基超高、加宽设计

6路基排水系统设计、路基路面结构及材料组成设计

7工程施工组织与工程概预算编制

第二部分 设计资料

一、地形、地貌

公路沿线经过黔中高原南部边缘的斜坡地带总地势为北高南低四周山岭绵延中部偏南为丘陵地质构造较复杂岩性种类多主要以石灰岩为主。

二、河流及水系

公路沿线水系发育小河溪流众多地下水为孔隙水受大气降水及地表水水体补给 以孔隙水为主。

三、气象

路线测区地处低纬度地带属亚热带季风气候夏长多雨冬短无严寒热量充足多年平均气温约22° C最热月为7月平均气温约29° C最冷月为1月平均气温约12° C。多年平均降雨量约1510 mm,其中4-9月份为雨季降雨量约1200 mm,全年总蒸发量约1430 mm.风向在冬春季93月东南风占主导夏秋季48月东风占主导风速随季节变化一般冬季风速大于夏季风速瞬时极大风速约29m/s。

四、地震

地震基本烈度属Ⅵ度。

五、设计标准

表2-1主要技术指标表

六、筑路材料

本工程项目所使用的筑路材料主要是碎石、片石、砂等。

1、石料场沿线石料主要是花岗岩、石灰岩等岩石裸露无土覆盖层质地坚硬强度较高耐磨能力强可开采为碎片石。加工后的石料适用于桥梁、涵洞、路面、防护工程等。各石料强度较好储存量丰富 均有现成的机耕道或二级公路通往料场。

2、砂料场环江河砂含泥量大产量不足经实验不满足路面规范要求采用陆川砂交通便利其它工程可采用机制砂。

3、全线水泥拟采用金城水泥厂水泥在使用前应对该厂的水泥进行物理和化学试验符合标准规定后并附带有该水泥合格证书才能使用 以免影响工程质量。

4、施工时碎片石、砂等材料必须取样试验符合标准规定后才能使用。沥青、钢材等外购材料必须符合质量标准并附有合格证书。

阿里云金秋上云季,云服务器秒杀2C2G5M年付60元起

阿里云(aliyun)在这个月又推出了一个金秋上云季活动,到9月30日前,每天两场秒杀活动,包括轻量应用服务器、云服务器、云数据库、短信包、存储包、CDN流量包等等产品,其中Aliyun轻量云服务器最低60元/年起,还可以99元续费3次!活动针对新用户和没有购买过他们的产品的老用户均可参与,每人限购1件。关于阿里云不用多说了,国内首屈一指的云服务器商家,无论建站还是学习都是相当靠谱的。活动地址:h...

香港云服务器 1核 256M 19.9元/月 Mineserver Ltd

Mineserver(ASN142586|UK CompanyNumber 1351696),已经成立一年半。主营香港日本机房的VPS、物理服务器业务。Telegram群组: @mineserver1 | Discord群组: https://discord.gg/MTB8ww9GEA7折循环优惠:JP30(JPCN2宣布产品可以使用)8折循环优惠:CMI20(仅1024M以上套餐可以使用)9折循...

印象云七夕促销,所有机器7折销售,美国CERA低至18元/月 年付217元!

印象云,成立于2019年3月的商家,公司注册于中国香港,国人运行。目前主要从事美国CERA机房高防VPS以及香港三网CN2直连VPS和美国洛杉矶GIA三网线路服务器销售。印象云香港三网CN2机房,主要是CN2直连大陆,超低延迟!对于美国CERA机房应该不陌生,主要是做高防服务器产品的,并且此机房对中国大陆支持比较友好,印象云美国高防VPS服务器去程是163直连、三网回程CN2优化,单IP默认给20...

沙喷子为你推荐
12306崩溃iphone 12306网络错误地陷裂口造成地陷都有哪些原因?www.jjwxc.net有那个网站可以看书?陈嘉垣大家觉得陈嘉桓漂亮还是钟嘉欣漂亮?百花百游“百花竟放贺阳春 万物从今尽转新 末数莫言穷运至 不知否极泰来临”是什么意思啊?haole018.comse.haole004.com为什么手机不能放?8090lu.com《8090》节目有不有高清的在线观看网站啊?yinrentangweichentang万艾可正品的作用真的不错吗www.k8k8.com谁能给我几个街污网站我去自己学关键词分析怎么样分析关键词?
厦门域名注册 cn域名个人注册 淘宝抢红包攻略 hostmaster rackspace 香港托管 表单样式 网通代理服务器 网通ip 促正网秒杀 jsp空间 me空间社区 国外免费asp空间 免费网页空间 常州联通宽带 web应用服务器 美国盐湖城 东莞服务器托管 中国电信测速网站 百度云空间 更多