January 1 ,2018
OPNOTICETOSHIPPINGNo.N-1-2018
To: Shipping Agents,Owners and Operators
Subject:Vessel Requirements
1. Effective Date and Cancel lation
This Notice is effective on the date of issue and cancels OP Notice to Shipping No.N-1-2017. A revised Notice wi l l be issued in January of each year or when otherwiserequired.This revision includes the fol lowing changes:
(1) Section 4(Communications Channels), Item h was modified on p.5.
(2) Vessel Requirements, Section 2 (Size and Draft Limitations of Vessels),Subsection c(OtherDraft Considerations), Item 3 was modified on p. 14
(3) Vessel Requirements, Section 4 (Navigation Bridge Features Required ofTransiting Vessels),Subsection e (Panama Canal Minimum Visibility Requirements), Item
(1)(a)was modified on p.25.
(4) Vessel Requirements, Section 4 (Navigation Bridge Features Required ofTransiting Vessels),Subsection e (Panama Canal Minimum Visibility Requirements), Item
(2)was modified on p.26.
(5) Vessel Requirements, Section 8 (Construction,Number and Location of Chockand Bitts),Subsection b(Neopanamax and Panamas Plus Vessels), Item(4)was modifiedon p.44.
(6) Vessel Requirements, Sections 12 (Admeasurement System for Full ContainerVessels) to 18 (Pre-arrival Cargo Declaration, Security Inspection and Escort)weremodified from p.51 to 62.
(7) Vessel Requirements, Section 19 (Hot Work Performed on Board Vessels)wasupdated on p.63.
PANAMA CANAL AUTHORITY(ACP)
Operations Department
Bldg 729,Balboa-Ancon
Panama,Panamawww pancanal com
OPNoticetoShippingN-1-2018 VesselRequirements
(8) Vessel Requirements, Section 23 (Air Conditioning Systems on TransitingVessels)was added on p.66.
(9) Vessel Requirements,Section 27(Discharging of Vessel Wastes,Oily Bilge Waterand Ballast Water), Item 5 was added on p.68.
(10)Vessel Requirements,Section 30 (Maneuvering Fuel)was modified from p. 69 to
71 .
2. Purpose andScope
The purpose of this document is to inform the shipping community of the proceduresand ampl ifications necessary to implement the Maritime Regulations for the Operation ofthe Panama Canal (MROPC). Please be advised that non-compliance with PanamaCanal rules and regulations may subject vessels to unnecessary delays or denial oftransit. The Panama Canal Authority (ACP)may order deviations from these rules ifspecial circumstances so warrant. Please refer to the Table of Contents on pages 9through 1 1 .
3. Organization and Responsibi l ity
The Executive Vice Presidency for Operations (272-4500, fax: 272-3892), under theExecutive Vice President for Operations, is the organizational department of the PanamaCanal Authority responsible for the control of maritime traffic through the Canal and itsterminal ports, and through which al l ACP services to shipping are handled. Fol lowing is asummary of the Executive Vice Presidency for Operations’ units which, due to theirfunctions,often require contact with agents,operators and owners:a. The Transit Operations Division (272-4218), headed by the Transit OperationsDivision executive manager, is responsible for the immediate direction of dai ly maritimeoperations, emergency response and recovery, supervision and enforcement of rules andregulations governing the navigation of the Canal ,approval of new construction compl iancewith chocks and bitts, boarding faci l ities, wheelhouse design features and visibi l ityrequirements, and for ensuring that vessels arriving for transit are properly equipped.Additional ly, the unit is responsible for matters involving the safety aspects of vessel trafficflow and control , vessel material conditions and inspections, hazardous cargo, Canalphysical conditions, and emergency response for fires or oi l/chemical spi l ls. Theresponsibi l ities of the Transit Operations Division executive manager are exercised throughthe Canal port captain on duty.b. The Marine Traffic Control Unit (272-4201 , fax: 272-3976, ETA@pancanal .com),headed by the Traffic Management Unit manager, is responsible for processing ETAinformation, preparation of the dai ly transit schedule,monitoring and coordinating al l vesselmovements within Canal operating areas, and administering the Panama Canal TransitBooking System.
3
OPNoticetoShippingN-1-2018 VesselRequirements
c. The Admeasurement and Bi l l ing Unit (272 4567, fax: 272 5514, OPTC-A@Pancanal .com), headed by the Admeasurement Unit manager, is responsible forascertaining the correct Panama Canal tonnage of vessels transiting the Canal ,ascertaining and auditing the Total TEU Al lowance (TTA) on ful l container vessels andNumber of TEUs Transported (NTT) on other vessels with on-deck carrying capacity,maximum number of berth on passenger vessels and the maximum displacement onwarships, dredges and floating dry-docks; boarding and clearing of vessels for medicalsurvei l lance, general ship inspections, gathering information for the Ship Data Bank, andgenerating bi l l ing invoices for transits and related services.d. The Board of Inspectors (272-3403, fax: 272-3548), headed by the Board ofInspectors chairman, is responsible for the official inquiry and examination into thecircumstances surrounding marine accidents which occur in Canal waters involvingAuthority personnel and/or equipment. In addition, this office is responsible for thecertification of marine credentials of Authority employees.
Final ly, vessel transits are a joint effort. In addition to the responsibi l ities of the unitsoutl ined above, vessel owners, operators, agents, officers and crews are responsible forcompl iance with Canal rules and regulations. Cooperation of al l concerned parties isnecessary to ensure a safe and efficient transit.
4. CommunicationChannels
Direct communication with the Executive Vice Presidency for Operations’ units may beestabl ished bythe fol lowing means:a. MAIL: AUTORIDAD DEL CANAL DE PANAMA(ACP)
(Name,position and title)
ACP-OP
P.O.Box 526725
MiamiFL33152-6725b. FACSIMILE: (Name of Unit)
(Fax numbers l isted on the previous page.)c. TELEPHONE: (Telephone numbers l isted on the previous page.)d. INTERNATIONAL COUNTRY CODE–Forfax and telephone: 507e. TRAFFIC MANAGEMENT UNIT–Via e-mai l :ETA@pancanal .comf. RADIO PRATIQUE MESSAGES–Via e-mai l :optc-arp@pancanal .comg. DRAWING SUBMITALS–Via e-mai l :opts-an@pancanal .com or in compactdisk or printed form directly to:
Courier mai l : AUTORIDAD DEL CANAL DE PANAMA
División de Operaciones de Tránsito(OPTS)
Edificio 910,La Boca
Balboa,Panama
Republ icof Panama
4
OPNoticetoShippingN-1-2018 VesselRequirements
(Telephones:272-4191/4296)
Regularmai l : AUTORIDAD DEL CANAL DE PANAMA
División de Operaciones de Tránsito(OPTS)
Balboa,Panama
Republ icof Panama
The drawings submitted via e-mai l or disk should be saved preferably in PDF orTIFF fi le format, or in a fi le format compatible with AUTOCAD.Al l drawing and letter fi lesmay be compressed together into one zip/7z/rar fi le. Fi les exceeding 10MB must not beincluded within compressed fi les, instead they must be sent in theiroriginal formath. For admeasurement purposes the drawings shal l be submitted to:ACPShipplans@pancanal .com at least 96 hours prior to arrival at Panama Canal Waters inPDF orAUTOCAD formats only, in one single plan (not in parts that have to be pieced backtogether.)
ORIGINALSIGNED
Esteban G.Sáenz
Executive Vice President for Operations
5
OPNoticetoShippingN-1-2018 VesselRequirements
VESSELREQUIREMENTS
TABLE OF CONTENTS
1 . Definitions 9
2. SizeandDraftLimitationsofVessels 1 1a. Vessels Transiting the Panamax Locks. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1 1b. Vessels Transiting the Neopanamax Locks. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .12c. Other Draft Considerations. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .14d. Maximum Width. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .16e. Protrusions. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .16f. Maximum Height. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .17g. Release from Liabi l ity. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .17h. Approval of Plans. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .18i . Required Documentation for Initial Transit in Electronic Format. . . . . . . . . . . . . . . . . . . . . .19j. Denial of Transit. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .20k. Vessel Should Be Able to Relay at the Locks. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .21
3. Requirement for Pi lot Platforms and Shelters on Certain Vessels 21
4. Navigation Bridge Features Required of Transiting Vessels 23a. Authority. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .23b.Wheelhouse……. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .23c. BridgeWings. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .24d. Normal Conning Positions. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .24e. Panama Canal Minimum Visibi l ity Requirements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .25f. I ndicators. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .28g. Very High Frequency(VHF)Radio. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .29h.Whistle Controls. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .30i . Steering Light. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .30j. Bow/Stern Thrusters. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .30k. Compass. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .30l . Course Recorders. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .31m.Bridge Wing Spotl ights. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .31n. Radar. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .31o. Main Propulsion Systems. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .31p. Use of Automatic Identification System(AIS). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .32q. Steering gear. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .34
5. RequirementsforNon-Self-Propel ledVessels 356 VesselsRequiringTowingServices 36
7. DeckLoadCargo 378 Construction,Numberand Location of Chocksand Bitts 38a. Vessels Transiting the Panamax Locks. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .38
6
OPNoticetoShippingN-1-2018 VesselRequirements
b. Neopanamax and Panamax Plus Vessels. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .43
9. MooringLines,AnchorsandDeckMachinery 45
10. Boarding Faci l ities 45
1 1 . Definitive Phase-out of Single Hul l Oi l Tankers____________________51
12. Admeasurement System for Ful l ContainerVessels____________________51
13. Deck-Loaded Containers on Ships not Bui ltforContainerCarriage 53a. G e n e ra l. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .53b. Approval for Transits. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .53c. Advance Notice and Inspection. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .54
14. Unauthorized Modification to the ACP/TOLL BASIS Certificate 54
15. Calculation of PC/UMS NetTonnageon PassengerVessels 55
16. DangerousCargoRequirements 55a. G e n e ra l. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .55b. Test of Equipment on Board. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .55c. Holding Dueto Non-Compl iance. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .56d. Reporting Dangerous Cargo in Bulk. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .56e. Tankers Claiming Cargo Tanks as“Gas Free”or “Inert”. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .56f. Reporting Shipments of Direct Reduced Iron. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .57g. Precautionary Measures Due to Dangerous Cargo. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .57h. Reporting Shipments of Hazardous Wastes………………………………. . . . . . . . . . .59i . Reporting Radioactive Cargo. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .58j. Coverage Requirements for Transiting Vessels Carrying
Radioactive Cargo.…. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .59k. Advance Notification of Shipments of Fissionable Materials. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .60l . Tanker Inspection Program. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .60
17. CargoRegulatedUnderAnnexI Iof MARPOL 61
18. Pre-Arrival Cargo Declarations,Security Inspection and Escort 61
19. HotWorkPerformedOnBoardVessels 63
20. ManningRequirements 65
21 . AdditionalPi lotsDuetoVesselDeficiencies 65
22 Pi lotAccommodationsOnBoardTransitingVessels 66
23. AirConditioningSystemsonTransitingVessels 66
24. MainSourceof ElectricalPower 67
25. EmergencySourceof Electrical Power 67
7
OPNoticetoShippingN-1-2018 VesselRequirements
26. SanitaryFaci l itiesandSewageHandl ing 67
27. Discharging of Vessel Wastes,Oi ly Bi lge Waterand Bal lastWater 68
28. EmergencyEscapeBreathing Devices 69
29. SmokingProhibitioninCanalWaters 69
30. ManeuveringFuel 69
31 . ProperDisplayofthePanamanianFlag 71ANNEX 1–PanamaxLocksComposite Maximum Clearances 73ANNEX 2–Neopanamax Locks(Cocol i) 74ANNEX 3–Neopanamax Locks(Agua Clara) 75ANNEX4–NeopanamaxLocksClearances Diagram 76
8
OPNoticetoShippingN-1-2018 VesselRequirements
VESSELREQUIREMENTS
1. Definitionsa. Barge: A flat-bottomed vessel of ful l body and heavy construction without instal ledmeans of propulsion.b. Commercial Vessel: A self-propel led vessel other than a naval ,mi l itary or other publ icvessel .c. Dangerous Cargo: Any material which is explosive, flammable, radioactive or toxic tohumans orthe environment.d. Full Container Vessel:Vessel specifical ly designed or converted to transport containersabove the upperdeckand that has cel lularguides permanentlyaffixed in its holds.e. Integrated Tug-Barge Combination: A pushing vessel and a non-tank barge pushedahead rigidly connected to each other to form a composite unit.A composite unit means apushing vessel rigidly connected by"mechanical means" to a barge being pushed, so theyreact to the sea and swel l as one vessel , and, as such, considered a single power-drivenvessel . "Mechanical means" does not include l ines, hawsers,wires or chains. To beconsidered an ITB at the Panama Canal , such vessels must meet al l current ACPregulations and requirements for transitand be able to operate in al l conditions underwhicha ship of equivalentsize can operate.f. Maximum Allowable Response Time: The maximum al lowable amount of time that ittakes the main propulsion to respond from stop to ahead or from stop to astern, after atelegraph order is received,which must be tested before the transit begins.g.Maximum Authorized Draft: Lesser of the maximum authorized transit draft or themaximum tropical freshwater draft by Load Line Certificate.h.Maximum Authorized Transit Draft: Deepest point of immersion in TFW of a particularvessel permitted at any time,Gatun Lake level and Canal restrictions permitting.i . Maximum Beam: The maximum breadth (width) of the hul l between the outsidesurfaces of the shel l plating.j. Maximum Length: The distance between the forward and after extremities of a vessel ,including the bulbous bow and protrusions(also length overal l -LOA)k.Maximum Width: The extreme width of a vessel , including protrusions, at its widestpoint.l . Minimum Full Ahead Speed: The ACP has determined that the minimum full aheadspeed required in order to complete transit in standard times is 8 knots.m.Neopanamax:Al l vessels with dimensions greater than Panamax that comply with thesize and draft l imitations of the new locks; namely, 366 meters (1200.48 feet) in length by49 meters(160.72 feet) in beam by 15.2 meters(49.87 feet),TFW draft.
9
官方网站:点击访问星梦云活动官网活动方案:机房CPU内存硬盘带宽IP防护流量原价活动价开通方式成都电信优化线路4vCPU4G40G+50G10Mbps1个100G不限流量210元/月 99元/月点击自助购买成都电信优化线路8vCPU8G40G+100G15Mbps1个100G不限流量370元/月 160元/月点击自助购买成都电信优化线路16vCPU16G40G+100G20Mb...
Ceraus数据成立于2020年底,基于KVM虚拟架构技术;主营提供香港CN2、美国洛杉矶CN2、日本CN2的相关VPS云主机业务。喜迎国庆香港上新首月五折不限新老用户,cera机房,线路好,机器稳,适合做站五折优惠码:gqceraus 续费七五折官方网站:https://www.ceraus.com香港云内存CPU硬盘流量宽带优惠价格购买地址香港云2G2核40G不限5Mbps24元/月点击购买...
profitserver怎么样?profitserver是一家成立于2003的主机商家,是ITC控股的一个部门,主要经营的产品域名、SSL证书、虚拟主机、VPS和独立服务器,机房有俄罗斯、新加坡、荷兰、美国、保加利亚,VPS采用的是KVM虚拟架构,硬盘采用纯SSD,而且最大的优势是不限制流量,大公司运营,机器比较稳定,数据中心众多。此次ProfitServer正在对德国VPS(法兰克福)、西班牙v...