高层建筑施工中沉降观测技术的应用- Powered By BBSxp Theapplication of subsidence observation technology in high-riseconstruction is Powered By BBSxp

Application of settlement observation technology in high-risebuilding construction - Powered By BBSxp community bankCommunity prison

Community gang

Community partners

Community store > |0 welcome you, riwangyi | online | personalservice | control panel | BBS status | , | , | , | , | , || help has been stopped for 35 minutes

Gley technology BBS [front page], construction technologydiscussion area, construction technology BBS, the applicationof settlement observation technology in high-rise buildingconstruction

You are the 22nd reader of this post

Theme: application of settlement observation technology inhigh-rise building constructionchnf cgreen

Level: community district chief

By the test value: 1681

Community gold coin: 690

Total number: 825

Registration time: 2005-4-10

Body force value:

Online status:

No. 1

With the constant progress of the society, materialcivilization greatly enhance and architectural design andconstruction technology of mature gradually perfect, at thesame time, also because of diminishing land resources and theincreasingly prominent contradiction between populationgrowth, tall and super-tall building, more and more. In orderto ensure the normal service life of buildings/structures andbuilding, safety, and provide reliable data for the followingconstruction survey and design and the correspondingsettlement parameter, construction, the necessity andimportance of settlement observation are becoming ever moreobvious.

The existingnorms also stipulate that the high-risebuildings,high-rise buildings, important ancient buildings andcontinuous production facilities, power equipment bases and

landslide monitoring should be observed.

Especially in high-rise buildings settlement observationstrengthening process monitoring in the construction process,and guide the reasonable construction process, to preventappear uneven settlement in the process of construction, timelyfeedback information for survey and design and constructiondepartments to provide detailed information, to avoid the mainstructure of the building damage caused by the subsidence oraffect the use function of crack structure, cause huge economiclosses.

Based on the application of subsidence observation in theconstruction of high-rise buildings, this paper discusses theobservation of settlement observation in the construction ofhigh-rise buildings.

The basic requirements of settlement observation

1. Requirements for equipment and personnel quality

According to the characteristics of the settlement observationaccuracy high, in order to accurately reflect the architecturalstructures under constant load for the settlement of cases, thegeneral provisions of measurement error should be less than thedeformation value of 1/10-1/20, therefore should be used forsettlement observation precision level (S1 or S05 level) , thelevel ruler also should use the environment and the temperaturechanging meat small high precision of indium

The alloy level ruler. Use the first ruler as much as possible

using the normal ruler without the alloy level of indium.The requirements of personnel quality must be subject toprofessional learning and skill training.

Familiar with instrument operation procedures, familiar withmeasurement theory can according to different engineeringcharacteristics, specific circumstances in differentobservation methods and observation program, in the process ofimplementing the problem to analyze the reasons and accuratelyby using the theory of error adjustment calculation, do, rapidand accurate for each observation tasks on time

2. Requirements for observation time

The settlement observation of buildings/structures has strictrestrictions to the time, especially for the first timeobservation should be carried out on time, otherwise can notget the original data of settlement measurement, but theobservations can not get the full meaning. The other stagesshall be retested at regular intervals according to theprogress of the project and shall not be missed or retested.Only in this way can the accurate settlement condition or rulebe obtained. Adjacent two time interval is called anobservation period, the general settlement observation ofhigh-rise buildings in a certain time period for theobservation period (such as: time / 30 days) or by loadingsituation every layer of the building (or layers) is anobservation period, no matter what way must be observationcycle on time as stipulated in the measuring scheme.

3. Requirements of observation points

In order to be able to reflect the accurate settlement of theconstructed structures, the settlement observation pointsshould be buried in the position that best reflects thesettlement characteristics and facilitates the observation. Itis generally required that the settlement observation pointson the buildings should be symmetrical and the spacing betweenadjacent points should be 15 to 30 meters, evenly distributedaroundthebuilding. Usually, there is a special on the buildingdesign drawing

The settlement of the door to the observation point layout.Also, embedding the settlement observation point to conform tothe requirements of the observationof each construction stage,especially considering the veneer decoration stage because ofthe wall or column construction and destruction or disguisedobservation point, does not lose observation value continuousobservation.

4. The settlement observation should follow the principle of"five definite"

The so-called "five definite", which is the base point, workbasis point and the settlement observation point of theobserved observation, is stable. Use instruments and equipmentto be stable; The observer should be stable; The environmentalconditions of observation are basically consistent. Theobservation route, mirror position, procedure and methodshould be fixed. The above measures objectively to minimize

ambiguity of observation error and the measured results haveunified tendency, ensure that all survey results consistentwith the observation results are comparable for the first time,make the observation of settlement more real.

5. Test requirements

The operation method and the observation procedure of theinstrument and equipment should be familiar and correct. Theindexes of the instruments used shall be checkedand calibratedbefore the first observation, and the measurement units shallbe certified as necessary. Continuously use 3 -- 6 months tore-check the equipment and equipment.

During the observation, the operators should cooperate witheach other, coordinate their work, carefully and carefully.

6. Requirements for settlement observation accuracy

According to the characteristics of the building and theconstruction of the design unit, the settlement observationprecision is selected. In the absence of any particularrequirement,

In the process of construction of ordinary high-rise structures,the observation method of second-class level measurement canmeet the requirements of settlement observation. In theconstruction process of hebei traffic training center, we adoptthe second-class water measurement method.

The observations are as follows:

(1) round-trip, echo or loop closure: delta h= sigma a- sigmab is less than or equal to l square root of n-, indicating thenumber of stations. (or delta h equals sigma a minus sigma bis less than or equal to 1.0 square root of L -- and L meansthe distance from the observation path)

(2) front and rear view distance: not equal to 30m

(3) front and back distance: less than 1.0 m

(4) the cumulative difference between front and back is equalto 3.0 m

(5) the height difference of the settlement observation pointrelative to the rear view point is less than 1.0 mm

(6) the accuracy of the level is not lower than the N2 level

7. Settlement observation results and calculationrequirementsThe original data should be true and reliable, and the recordsand calculations should conform to the requirements of theconstruction measurement specifications, according to thecorrect, rigorous and orderly, step by step verification, theresults of the effective principle of the results collationandcalculation.

2. Specific application procedures and procedures

1. Establish leveling control network

Accordingto the characteristics of the engineering layout, thescene of the environmental conditions for measurement formeasuring scheme, the construction units to provide the levelof control point precision traverse points (or city) accordingto the engineering measure for measuring scheme and theprinciples of net demand level control network is established.Requirements:

(1) the general high-rise buildings should be surrounded bythree levels of above, and the spacing of the standard pointsshould be no more than 100 meters.

(2) at least two level points are erected in any place in thepresent area, and close graphics are formed at each level inthe field to close the inspection.

(3) the level points should be located outside the excavationof buildings, ground settlement and vibration zones, and thelevel of depth should meet the requirements of second-classlevel measurement (more than 1. 5 meters) .

According to the characteristics of the project, a reasonablelevel control network is established, and the elevation of eachlevel is calculated with the reference point. 2. Establishfixed observation route

The position of the settlement observation point is determinedby the site level control network and the settlementobservation point diagram of the settlement observation point.A fixed observation route is established between the control

point and the settlement observation point, and the markingpile is made at the point of erection of the instrument siteand the turning point to ensure that all observations followthe uniform route.

3. Settlement observation

The first observation should be carried out in time after theobservation point is stable, according to the proposed projectand the determined observation period. General high-risebuildings have one or several layers of underground structure,should first observation since foundation, on the basis ofvertical and horizontal axis based bureau (edge) according tothe designed position embedding settlement observation point(temporary) , such as temporary observation point establishedgood, for the first time.

The observation of the altitude of the first observation is thebasis of the comparison of the observations, and the accuracyof the observation is very high, and the accuracy of theobservation is either N2 or N3 precision level.

It is alsorequired that the first elevation of each observationpoint should be determined after two observations in the sameperiod.

As each layer of the structure rises, the temporary observationpoints are moved up and observed until 10 0.00 and then thepermanent observationpoint is buried (for the observation thatthe permanent observable point is set to the 10500mm) . Then eachlayer of constructionwill be retested once, until completion.

优林云(53元)哈尔滨电信2核2G

优林怎么样?优林好不好?优林 是一家国人VPS主机商,成立于2016年,主营国内外服务器产品。云服务器基于hyper-v和kvm虚拟架构,国内速度还不错。今天优林给我们带来促销的是国内东北地区哈尔滨云服务器!全部是独享带宽!首月5折 续费5折续费!地区CPU内存硬盘带宽价格购买哈尔滨电信2核2G50G1M53元直达链接哈尔滨电信4核4G50G1M83元直达链接哈尔滨电信8核8G50G1M131元直...

Vultr再次发布充值多少送多少活动

昨天我们很多小伙伴们应该都有看到,包括有隔壁的一些博主们都有发布Vultr商家新的新用户注册福利活动。以前是有赠送100美元有效期30天的,这次改成有效期14天。早年才开始的时候有效期是60天的,这个是商家行为,主要还是吸引到我们后续的充值使用,毕竟他们的体验金赠送,在同类商家中算是比较大方的。昨天活动内容:重新调整Vultr新注册用户赠送100美元奖励金有效期14天今天早上群里的朋友告诉我,两年...

两款半月湾 HMBcloud 春节88折日本和美国CN2 VPS主机套餐

春节期间我们很多朋友都在忙着吃好喝好,当然有时候也会偶然的上网看看。对于我们站长用户来说,基本上需要等到初八之后才会开工,现在有空就看看是否有商家的促销。这里看到来自HMBcloud半月湾服务商有提供两款春节机房方案的VPS主机88折促销活动,分别是来自洛杉矶CN2 GIA和日本CN2的方案。八八折优惠码:CNY-GIA第一、洛杉矶CN2 GIA美国原生IP地址、72小时退款保障、三网回程CN2 ...

bbsxp为你推荐
文件夹删不掉文件夹删除不了是什么原因?weipin唯品会的唯品币是干什么用的?yy频道中心yy语音怎么进频道中心暴风影音怎么截图暴风影音怎么截屏啊?51自学网站推荐一个好一点的自学网站,关于网站建设的。spgnuxps = getCon().prepareStatement(sql);啥意思,求注释,要是不嫌麻烦帮我把下面的也给注释了arm开发板arm开发板是干什么用的,是用在什么领域方面的显卡温度多少正常显卡温度多少算正常?镜像文件是什么镜像文件是什么意思?迅雷云点播账号求个迅雷VIP 是VIP就可以 只用来看云点播 改密码是孙子。 谢了 ! 362135668@qq.com
汉邦高科域名申请 企业域名备案 淘宝二级域名 t楼 bandwagonhost sockscap debian6 2017年万圣节 警告本网站 个人空间申请 中国电信测速112 e蜗 hinet 超级服务器 架设邮件服务器 论坛主机 广州虚拟主机 免费asp空间申请 华为云建站 免费稳定空间 更多