续建联通宽带提速

联通宽带提速  时间:2021-05-20  阅读:()
"2",,,"6月份鹿城区重点项目建设总表",,,,,,,,,,"单位:万元",,,,"序号","项目名称","责任单位","2014年计划","6月止上报即时投资数","上报完成率","6月止统计投资数","统计完成率",,,,"建设单位上报即时投资完成率","统计投资完成率""1","藤桥建设项目","藤桥镇","58200","27211","0.
467542955326461","24159","0.
415103092783505",,,"藤桥","0.
467542955326461","0.
415103092783505""2","仰义建设项目","仰义街道","80300","25636","0.
319252801992528","22722","0.
282963885429639",,,"仰义","0.
319252801992528","0.
282963885429639""3","双屿建设项目","双屿街道","90000","40647","0.
451633333333333","15621","0.
173566666666667",,,"双屿","0.
451633333333333","0.
173566666666667""4","松台建设项目","松台街道","7000","666","0.
0951428571428571","0","0",,,"松台","0.
0951428571428571","0""5","五马建设项目","五马街道(江滨路指挥部)","15500","6477","0.
417870967741935","18051","1.
16458064516129",,,"五马","0.
417870967741935","1.
16458064516129""6","南汇建设项目","南汇街道","102300","40907.
02","0.
39987311827957","48869","0.
477702834799609",,,"南汇","0.
39987311827957","0.
477702834799609""7","滨江建设项目","滨江街道","40000","9682","0.
24205","21191","0.
529775",,,"滨江","0.
24205","0.
529775""8","七都建设项目","七都街道","55500","22771","0.
410288288288288","11971","0.
215693693693694",,,"七都","0.
410288288288288","0.
215693693693694""9","塘河建设项目","区温瑞塘河保护管理委员会","38000","19227.
6","0.
50598947368421","11241","0.
295815789473684",,,"塘河","0.
50598947368421","0.
295815789473684""10","交通建设项目","区交通运输局","52100","27024","0.
518694817658349","44133","0.
847082533589251",,,"交通","0.
518694817658349","0.
847082533589251""11","水利建设项目","区农林水利局","57100","23589","0.
413117338003503","20126","0.
352469352014011",,,"水利","0.
413117338003503","0.
352469352014011""12","教育建设项目","区教育局","3000","2040","0.
68","502","0.
167333333333333",,,"教育","0.
68","0.
167333333333333""13","卫生建设项目","区卫生局","10500","3617.
8","0.
344552380952381","6607","0.
629238095238095",,,"卫生","0.
344552380952381","0.
629238095238095""14","住建建设项目","区住建局","20000","11105","0.
55525","13105","0.
65525",,,"住建","0.
55525","0.
65525""15","人防建设项目","区人防办","2200","1320","0.
6","1320","0.
6",,,"人防","0.
6","0.
6""16","电网建设项目","鹿城供电分局","41000","23811","0.
580756097560976","17011","0.
41490243902439",,,"电网","0.
580756097560976","0.
41490243902439""17","移动4G建设项目","移动鹿城分公司","22000","12299.
64","0.
559074545454545","0","0",,,"移动","0.
559074545454545","0""18","电信C网建设项目","电信鹿城分局","3200","2830","0.
884375","2280","0.
7125",,,"电信","0.
884375","0.
7125""19","联通网络建设项目","联通鹿城分公司","7100","5500","0.
774647887323944","0","0",,,"联通","0.
774647887323944","0",,,"705000","306361.
06","0.
434554695035461","278909","0.
395615602836879""0.
467542955326461","0.
415103092783505""0.
319252801992528","0.
282963885429639""0.
451633333333333","0.
173566666666667""0.
0951428571428571","0""0.
417870967741935","1.
16458064516129""0.
39987311827957","0.
477702834799609""0.
24205","0.
529775""0.
410288288288288","0.
215693693693694""0.
50598947368421","0.
295815789473684""0.
518694817658349","0.
847082533589251""0.
413117338003503","0.
352469352014011""0.
68","0.
167333333333333""0.
344552380952381","0.
629238095238095""0.
55525","0.
65525""0.
6","0.
6""0.
580756097560976","0.
41490243902439""0.
559074545454545","0""0.
884375","0.
7125""0.
774647887323944","0""3""6月份鹿城区重点项目建设明细",,"单位:万元""序号","项目名称","建设性质","建设内容和规模","总投资","主体中标价","主体合同工期","2014年计划",,"5月完成投资","即时投资数","即时完成率","统计投资数","统计完成率","6月进展情况","分管责任人(配合单位)","区分管、挂钩领导",,,,,,,"全年形象进度计划","计划数""1","藤桥建设项目",,,,,,"小计:","58200","6256","27211","0.
467542955326461","24159","0.
415103092783505",,,"责任人:",,"郑乐斌、肖达统、周驰",,"责任单位:",,,"藤桥镇人民政府""1","藤桥镇新社区工程(藤园景苑)","续建","总用地面积39125平方米,其中净用地面积31526平方米.
总建筑面积116900平方米.
","52095","29618","2011.
6-2014.
12,1100天","12月竣工","5000","700","3958","0.
7916","3958","0.
7916","1、外墙腻子:3#、4#楼1道已完成、5#-8#楼全部完成;2、门窗安装;1#、2#楼窗已完成,门未装,3#-5#楼全部完成,6#、7#楼完成1/2,8#楼全部完成;3、楼地面:4#楼全部完成,5#楼完成1/2,6#-8#楼全部完成;4、外墙涂料:5#楼全部完成,6#完成1/2,7#楼完成2/3,8#楼全部完成;5、电梯安装:4#、6#-8#楼全部完成.
","杨建勇","杨德听""2","藤桥镇新家园工程(青藤家园)","续建","总用地面积43677平方米,其中净用地面积30642平方米.
总建筑面积99263平方米.
","46451","23781.
62","2011.
6-2014.
12,1100天","12月竣工","6000","600","3350","0.
558333333333333","3350","0.
558333333333333","5#楼主体结构已完成22层梁板,4#楼主体结构已完成20层梁板,5#楼填充墙已完成15层梁板,4#楼填充墙已完成13层梁板,1#、2#、3#、6#外墙涂料拉毛已完成,面漆已完成50%,","杨建勇","杨德听""3","横山村农房集聚建设工程","续建","总用地面积24179平方米(折合36.
27亩),总建筑面积73127平方米,计入容积率建筑面积55300平方米,其中住宅52206平方米","35424(工程25593)","18000","2013.
10-2016.
8,1000天","3月份开始地下室开挖,9月份完成地下室,12月份部分主体结顶.
","5000","480","2010","0.
402","4351","0.
8702","9#楼基础及地梁钢筋都已扎好,正在扎板筋,5#楼平土基本完成,正在砌砖胎膜,8#楼正在砌砖胎膜,1#楼基础已浇筑完成","杨建勇","杨德听""4","上戍坎上西都锦园","续建","总用地面积10780平方米,建筑占地面积2708平方米,总建筑面积31114平方米.
","23900","12065.
494","2011.
6-2014.
12,800天","8月竣工","1000","40","784","0.
784","784","0.
784","附属工程","杨建勇","杨德听""5","双潮新社区(西都景秀居)","续建","一期总用地面积10780平方米,建筑占地面积2708平方米,总建筑面积31114平方米二期总用地面积3055平方米(折合约4.
58亩),地上总建筑面积5499平方米,绿地率30%,容积率1.
8.
总户数275户.
","15845(工程11798)","6834","2011.
10-2014.
6,769天","10月竣工","2000","70","660","0.
33","660","0.
33","7#楼完成至屋面梁板砼浇筑,2,3层填充墙砌筑已完成,窗台、反梁等已浇筑至6层,1#楼屋面斜坡油毡瓦施工已完成,2#楼油毡瓦基本已完成,1-3#楼水管道安装已完成,1#楼内墙粉刷9层已完成,4-6#楼外墙保温和抗裂砂浆已完成.
","杨建勇","杨德听""6","临江驿头农房改造建设工程","续建","总用地面积8397.
3平方米,折合约12.
6亩,其中规划建设用地面积5232.
3平方米.
项目总建筑面积为8821平方米,计入容积率建筑面积7887平方米","3444(工程2150)","1650","2013.
10-2014.
12,330天","12月竣工","1000","210","550","0.
55","550","0.
55","1#、2#、3#楼6层柱7层梁全部己究成,约7月10曰全部结顶.
","杨建勇","杨德听王丽丽""7","藤桥镇昌源路道路整治工程","续建","道路全长约956米,按城市支路标准建设,设计时速30千米/小时,路面结构为沥青混凝土路面,设置简支单跨桥梁1座.
","2586","800","2013年-2014年初","5月完工","600","80","500","0.
833333333333333","1105","1.
84166666666667","k0+780-k0+955路基完成,道路累计完成80%,0号承台,台身完成,桥梁累计完成70%,挡墙完成25%,人行道,路灯计划6月25日开始施工,","杨建勇","林世南""8","临江沙头园区企业厂房","续建","总用地面积34078平方米.
建筑面积85419平方米",,,,"华生源、润新三期、达安仪表设备、大风车实业等企业厂房建设.
","6000","1736","2555","0.
425833333333333",,"0","主体建设","南鹏程","胡明亮""9","下岸鞋革、五金园","新开工","110亩鞋革五金产业小微园","15000",,,"做好第一期30亩厂房的改建工作","5000","0","0","0",,"0","项目前期","林一俭","徐强胡明亮""10","岭下门前物流园","新开工","170亩农业、交通物流小微园",,,,"1-6月完成征地政策处理,场地平整.
7月完成土地出让.
","500","500","845","1.
69",,"0","征地政策处理","邵小林","伍挺""11","戍浦江上沈河整治工程","续建","河道全长2427米,设计河宽16-25米,设计河底高程1.
5~2.
0米.
主要建筑物级别为4级","7921(其中工程4303)","800(其中一段)","2012~2014","10月已施工段完工","300","45","122","0.
406666666666667","122","0.
406666666666667","完成20根钻孔灌注桩,100根预制桩制作,部分河道内土方开挖","蔡金榜","杨德听""12","戍浦江综合治理工程拆迁安置房(二期)","续建","二期建设用地面积3938平方米(折合约5.
9亩).
计入容积率地上建筑面积为7208平方米.
容积率为1.
8,绿地率为30.
01%,建筑密度为31.
13%.
","4326(工程3520)","2636","2013.
5-2014.
5","4月完成地下室,9月房屋结顶,12月竣工","1900","227","1162","0.
611578947368421","1187","0.
624736842105263","1#楼主体封顶,砖块砌筑完成80%;2#楼一层至三层完成,完成部分坡屋面钢筋绑扎;智能化预埋,开始附属工程.
","蔡金榜","杨德听""13","轻工园区企业厂房","续建","入园企业62家,工业用地1870公顷.
","150000",,,"南方游乐二期、跳跳鱼服饰等企业建设","5000","500","3991","0.
7982","1213","0.
2426","洪港机械有限公司等企业项目投资","蔡金榜南鹏程","胡明亮""14","科技创新大厦建设工程","新开工","总用地面积约11975平方米(折合约17.
96亩),总建筑面积为38925平方米,计入容积率地上建筑面积为35925平方米,其中一期工程18000平方米,二期工程17925平方米.
另地下建筑面积为3000平方米(一期1500平方米、二期1500平方米).
容积率为3.
0,绿地率为35%,建筑密度为21%.
","14795",,,"5月开工,年底完成地下室.
完成总工程量30%","4000","10","50","0.
0125","142","0.
0355","工程公开招标公示期,7月4日招标.
办理人防审查和工程规划许可证.
","蔡金榜(区科技局)","黄专途胡明亮""15","纵八路道路与桥梁工程","新开工","道路全长约729米,红线宽度为36米.
纵八路戍浦江桥梁工程道路长为150米,宽24米,城市二级干道,含水、电、光缆等设施.
横四路桥梁长40米,宽24米","9987",,"2012.
01-2014.
12","12月完工","7400","550","2624","0.
354594594594595","2651","0.
358243243243243","1)完成部分路基矿渣回填,完成沉井及管线,完成搅拌桩施工,开始顶管施工.
2)场地清理,施工变安装,红线内建筑物清理,泥浆池搭建,桥板预制,项目部建设","蔡金榜","胡明亮""16","纵五路及桥梁工程","新开工","道路设计总长度约916米,红线宽度40米.
按城市主干道Ⅰ级标准,设计车速为40千米/小时,采用沥青混凝土路面.
","6000",,,"1月开工,12月完工","6000","318","3830","0.
638333333333333","3866","0.
644333333333333","水泥搅拌桩完成5953根,钻孔灌注桩施工,土方外运及场地平整,桥板预制.
","蔡金榜","胡明亮""17","中央大道下坦河桥工程","新开工","桥梁总宽为50.
5米,长52米.
","2283",,,"1月开工,完成80%","1500","190","220","0.
146666666666667","220","0.
146666666666667","已经开工.
","蔡金榜","胡明亮""2","仰义建设项目",,,,,,"小计:","80300","11157","25636","0.
319252801992528","22722","0.
282963885429639",,,"责任人:",,"金浙瓯",,"责任单位:",,,"仰义街道""1","洞桥片区改造B-9地块安置房一期工程","续建","总用地面积32299平方米(折合约48.
45亩).
总建筑面积为124000平方米.
容积率为2.
99,绿地率为30.
0%,建筑密度为28.
0%","82298(其中工程50826)","38000","2012-2017,910天","8月完成地下室,年底主体完成8层结构.
","12900","3500","7885","0.
611240310077519","14039","1.
08829457364341","6#、2#楼十一层浇筑完毕,9#楼十层浇筑完毕,3#、4#、7#、8#、10#楼及周边地库底板完成浇筑","何素丰","项伟胜肖石龙""2","仰义集聚区项目(仰义锦园)一期工程","续建","位于仰义新街北侧(仰义垟山村),由13幢17-18层组成,总用地面积31248平方米,总建筑面积99978平方米.
地上总建筑面积77547平方米.
","44765","25630","2011-2014,1100天","主体工程完成,并开展绿化景观附属工程.
","2000","2000","4210","2.
105","600","0.
3","进行内外墙粉刷及门窗安装","何素丰","杨德听""3","地质灾害点移民及万户避险安置房项目","续建","总用地面积5330平方米(折合约7.
995亩).
总建筑面积为10144平方米,计入容积率地上建筑面积为10091平方米.
容积率为1.
89,绿地率为30%,建筑密度为24.
89%.
","4765(工程3341)","2198","2012-2014,450天","5月主体工程结顶,12月竣工.
","1000","800","1260","1.
26","1260","1.
26","开展外墙粉刷及屋面防水,完成门窗框安装","何素丰","杨德听""4","沿江工业区拆迁安置房一号地块二期(2号、4号楼)工程","续建","总建设净用地面积4418平方米,其中一期2024平方米,二期2394.
02平方米.
二期建筑总占地面积801平方米,地上总建筑面积5247平方米.
","2237(工程1502)","1166","2012-2014,350天","11月竣工.
","400","57","445","1.
1125","203","0.
5075","1、2#楼砖砌体施工;2、4#楼砖砌体施工及门窗框安装.
","何素丰","郑晓东""5","仰义集聚区项目(仰义锦园)二期工程","新开工","总用地面积45623平方米(折合约68.
4345亩),总建筑面积173900平方米,绿地率30.
03%,容积率2.
995,建筑密度20.
94%.
","86311",,"2013-2017","3月开工,基础工程完成50%","19000","3000","7116","0.
374526315789474","6620","0.
348421052631579","桩基工程","何素丰","杨德听""6","林宋组团林里片区山上安置房工程B-05地块","新开工","项目建设用地面积41112平方米(折合约61.
67亩).
总建筑面积约106090平方米,计入容积率建筑面积约82206平方米,容积率为1.
999,绿地率为30%,建筑密度20.
15%.
","50534",,,"10月份进场施工.
","8000","0","0","0",,"0",,"林慧","项伟胜""7","岩门制革基地B-18地块建设工程","新开工","总用地面积31063平方米,根据控规,容积率为2.
5,建筑密度30%.
","约40000",,,"施工图设计及审查(双屿街道完成征地后才能正常建设)","5000","800","1650","0.
33",,"0","项目建议书、可研、方案设计修改","何素丰(双屿街道)","项伟胜""8","洞桥片区改造B-5地块建设工程","新开工","总用地30.
21亩,总建筑面积88399平方米,地上建筑面积约63607平方米.
","57122","32000",,"8月完成施工图设计,12月完成地下室.
(需解决出让金问题,才可办理供地手续,建设手续办齐以后施工.
)","10000","1000","2470","0.
247",,"0","方案设计修改","何素丰","项伟胜肖石龙""9","渔渡创业园","新开工","规划用地约763亩,主要为园区厂房、配套设施建设.
","约20000",,,"完成小微园一期43亩,12月启动二期工程建设.
","5000","0","600","0.
12",,"0","启动二期对企业调整摸底","李一平","胡明亮""10","林里片区低丘缓坡利用项目","征收","规划范围约7.
76平方千米,建设用地面积6225亩,总建筑面积约245万平方米.
","约1110000",,"2011-2015","完成16.
8万平方房屋拆除,993户正式协议签订.
","2000","0","0","0",,"0","1、上半年出让地块530亩,完成省政府农转用审批;2、外钟山地块林地占用上报省林业厅审批;3、林里片区一期控规完成修改成果,并上报市政府审批;4、安置仰义锦园一期250户套型认选公示.
","林慧","项伟胜""11","林瞿路","征收","项目为林里片区内以林瞿路为主的道路网工程,总计13条道路.
项目总用地面积约301632平方米(折合约452.
4亩),其中陆域面积约299666平方米,水域面积约1964平方米.
道路总长12002米,道路建设面积约161648平方米(折合约242.
5亩).
","84478",,,"争取省级用地指标,办理农转用手续.
","10000","0","0","0",,"0","按11月份开工倒排进度,结合2014年新控规开展前期变更设计,做好道路用地村民征地款发放.
","林慧","项伟胜""12","林里河整治工程","征收","整治河段总长度约9953米,其中林里河主河道整治长度3704米,林里河13条支流整治长度6249米,总用地面积约16.
777公顷","15714",,,"争取省级用地指标,完成土地报征.
","5000","0","0","0",,"0","按10月份开工计划倒排时间,结合2014年新控规重新调整河道线位,组织编制施工图.
","林慧","项伟胜""3","双屿建设项目",,,,,,"小计:","90000","10075","40647","0.
451633333333333","15621","0.
173566666666667",,,"责任人:",,"章胤、刘玉东",,"责任单位:",,,"双屿街道""1","西中央涂A-2安置房","续建","总用地面积33677平方米,总建筑面积221581平方米.
其中:住宅130126平方米,商业34533平方米,其他配套用房3291平方米.
底层架空530平方米,设备转换层2024平方米,商业外走廊3353平方米,地下室面积47724平方米(含人防建筑面积22666平方米).
总户数937户.
","106734(工程78304)","76000","2010-2015;5年","9月份完成地下室,年底施工至主体20层.
","25000","1795","7268","0.
29072","4951","0.
19804","6号楼底板混凝土浇筑,5号楼南侧车库垫层,4号楼土方开挖至底板,7号楼土方开挖至底板.
","郭炳长","项伟胜""2","园区路","续建","工程全长约3041米,道路红线宽度为28米.
其中利用既有道路(江滨A线~康强路)长1840米,新建道路(康强路~隧道北峒口)长475米,新建隧道折合单线长约1520米.
","42812(其中隧道部分28407,瓯海出资50%)",,"2013.
6~2014","洞身开挖及支护施工.
","5000","95","263","0.
0526",,"0","完成初步设计批复、施工图设计送审稿、地质勘探、选址意见书、建设用地规划许可证、环评批复、水保批复.
","戴志光","林瑞荣林世南""3","西进城口2号地块(鹿城区公共卫生大楼)","续建","总用地面积约11184平方米(折合约16.
78亩),总建筑面积为60693平方米.
","31947","24318","910天","7月份完成地下室,年底施工至主体20层.
","8000","510","1223","0.
152875","997","0.
124625","地下室土方开挖60%,第一道支撑梁已完成,第二道支撑梁完成10%.
","郭炳长","伍挺""4","鞋都一期牛岭安置房11-13号楼(动车桥西侧)","续建","建筑面积40317平方米(不含地下室建筑面积为32623平方米);鞋都一期牛岭村.
","12714","6592","2010.
8起,600天","5月份竣工","500","281","1114","2.
228","1069","2.
138","已进行竣工联合验收.
","郭炳长","胡明亮""5","鞋都三期安置房","续建","建筑面积46048平方米,鞋都三期上伊村.
","9998","6057","2007.
11起,720天","6月份竣工","800","160","418","0.
5225","367","0.
45875","水电安装、附属施工","郭炳长","郑锦春胡明亮""6","鞋都三期出入口立交桥工程","续建","地点:鞋都三期.
","9297","6939","400天","5月份通车","2000","1428","2000","1","862","0.
431","完成沥青铺设,实现通车","戴志光","郑锦春胡明亮""7","鞋都三期纬七路Ⅰ标段","续建","工程总用地面积约35819平方米(折合约52.
7835亩),道路全长1342米,河道处红线宽度为26米,一般路段红线宽度分别为24米和31米.
","7445(工程3059)","1183(一标段)","540天(一标段)","一标段6月份完工.
二标段12月份开工.
","1200","562","1200","1","2605","2.
17083333333333","经五路至立交桥段已施工完成通车.
","戴志光","胡明亮""8","总部二期F-2地块公租房(人才公寓)项目","续建","用地面积6.
585亩,建筑面积10536平方米,为1幢12层小高层建筑,共有公寓宿舍194套.
二期F-2地块.
","6472(工程4655)","3227.
008","2011-2013年,540天","5月份竣工","1500","283","1019","0.
679333333333333","919","0.
612666666666667","电梯安装完成,附属管道施工.
","郭炳长","胡明亮""9","鞋都小学","续建","规划建设用地17295平方米,建筑12087平方米;鞋都三期铁路沿线西侧11号地块.
","6004","1857","2012.
3起,350天","4月份竣工","700","81","683","0.
975714285714286","1528","2.
18285714285714","已竣工.
","郭炳长","胡明亮""10","铁路沿线西侧纬四、纬五、纬六路","续建","纬四路长457米宽16米,纬五路长455米宽16米,纬六路宽24米长620米;鞋都三期铁路沿线.
","4804",,,"纬四路、纬五路6月份开工.
纬六路6月份完工.
","1400","100","220","0.
157142857142857",,"0","南半幅排污、排水管道完成,路基施工.
","戴志光","胡明亮""11","铁路沿线西侧经七路","续建","道路长1509米,红线宽16米,为城市支路,建设用地41亩","3591","1181","200天","5月份完工","500","210","480","0.
96","372","0.
744","路面已完成,人行道施工、路灯施工.
","戴志光","胡明亮""12","沿河北路和戴宅南路","续建","沿河北路全长729米,施工长度659米,红线宽度为16米;戴宅南路全长314米,施工长度281米,红线宽度为8米.
道路设计标准:按城市支路标准设计,设计车速为20千米/小时.
","3164(沿河北路2740,戴宅路425.
其中工程2030)","1697","270天","5月份完工","1300","453","1080","0.
830769230769231","836","0.
643076923076923","沿河北路1、0+667-0+160段路面施工完成;2、挡土墙身完成.
3、0+0-0+160段路面矿渣铺设完成.
戴宅南路底线管线施工.
","戴志光","胡明亮""13","铁路沿线西侧纬二路和河道整治工程","续建","纬二路长454米宽16米;上伊河和正岙河下游河道总长1133.
4米.
鞋都三期铁路沿线.
","2760","2121","360天","11月份完工","2000","347","1060","0.
53",,"0","正岙河驳坎板浇筑和浆砌石挡墙100米;土方开挖约2000立方.
上伊河驳坎底板浇筑,土方外运1000方","戴志光","胡明亮""14","郑桥广场建设工程(进城口三角地营业房)","续建","项目总用地约16743平方米(折合约25.
11亩).
地上计入容积率建筑面积3519平方米.
","2843",,,"8月份竣工","1000","25","188","0.
188","929","0.
929","完成外墙粉刷,水电安装.
","郭炳长","伍挺""15","市、区各指挥部在鞋都企业","续建","铁路沿线甬台温铁路指挥部拆迁安置企业、市城投集团拆迁安置企业建设,岩门农投地块建设.
",,,,"铁路沿线甬台温铁路指挥部拆迁安置企业、市城投集团拆迁安置企业建设,岩门农投地块建设.
","13500","3305","9456","0.
700444444444444",,"0","岩门农投地块41亩进场开工;甬台温铁路安置鞋都企业4家主体结顶、2家施工至主体施工;西排指挥部6家安置鞋都企业前期手续办理中.
","邵新城","胡明亮""16","垟田城中村改造C-02-C地块","新开工","总用地面积约52985平方米(折合约79.
48亩),总建筑面积为257400平方米,计入容积率地上建筑面积为185400平方米,另地下建筑面积为72000平方米.
容积率为3.
499,绿地率为30%,建筑密度为35%.
","131036",,,"11月份开工","6000","0","1229","0.
204833333333333",,"0","完成初步设计批复(模拟),完成建设用地规划许可证,正在施工图设计.
确定拆迁红线.
","陈龙","伍挺""17","宁波路二期拆迁安置房","新开工","位于仰双片区双岙单元C-03地块二期,用地约16亩,建筑面积25000平方米","15000","5058","693天","10月份开工.
","600","10","20","0.
0333333333333333",,"0","出具初步设计方案","邵新城","林世南胡海峰""18","铁路沿线经六路一标段、二标段和潘岙路","新开工","经六路一标段长948米,宽24米;经六路二标段长388米宽16米;潘岙路长307米宽16米;鞋都铁路沿线.
","5000",,,"经六路一标段6月份开工;经六路二标段和潘岙路6月份完工.
","1500","80","285","0.
19","186","0.
124","经六路一标段完成施工图,经六路二标和潘岙路面矿渣和排水管道施工.
","戴志光","胡明亮""19","岩门规划道路建设工程","新开工","占地约245亩,道路长约810米,宽16米、12米.
","2500",,,"完成项目前期,10月份开工.
","400","15","50","0.
125",,"0","完成土地预审、可研.
正在立项报批中.
","邵新城","胡明亮""20","鞋都三期上庄河和上叶河河道工程","新开工","上庄河工程,长681米,宽6米,造价1745万;上叶河工程,河道长150米,宽8米,造价300万.
","2045",,,"10月份开工","500","10","32","0.
064",,"0","完成标底设计.
","戴志光","胡明亮""21","山后路(嵇师新街)拓宽整治工程","新开工","山后路局部拓宽整治,民生项目,交通治堵.
该处承担鞋都二期70%以上交通量,是最主要对外出口,现场堵车严重,报纸多次报道,民生反映强烈.
计划拆违整治为主,拓宽改造为辅,进行交通治堵.
",,,,"进行局部拓宽改造.
拆违整治为主,拓宽改造为辅,进行交通治堵.
","200","0","0","0",,"0","研究建设方案","戴志光","胡明亮""22","石降坑园区","征收","总用地面积约130亩,可建筑面积约22万平方米,总投资约12亿元.
","120000",,,"土地利用规划调整;土地报征;控规批复","1000","0","50","0.
05",,"0","1#区块控规已联审,21#控规已完成公示.
","陈龙","胡明亮""23","马坑路","征收","道路长1290米,宽16米.
道路征地面积27913平方米,房屋征收面积51751平方米.
","23016(征收14604)",,,"马坑路一标段(双岙东路至宁波路段328米)12月份开工.
","500","10","39","0.
078",,"0","完成设计招标,正在选址公示、立项报批阶段.
","邵新城","伍挺""24","康强路","征收","道路长1108米,宽28米.
道路征地57.
88亩,房屋征收面积9011平方米.
","15673(征收4408)",,,"康强路二标段(双岙西路至宁波路段900米)12月份开工.
","600","10","49","0.
0816666666666667",,"0","正在选址公示、立项报批、设计招投标","邵新城","伍挺""25","瓯南路北段市政道路工程","征收","项目总用地约11106平方米(折合约16.
660亩).
道路全长约360米,红线宽度为28米.
瓯南路北段市政道路工程总投资16040万元,其中工程费用1353万元,其他费用13923万元(含征地拆迁费用13417万元)","16039",,,"拆迁","2000","35","1775","0.
8875",,"0","总83户,已腾空70户.
","蔡海波","项伟胜""26","昆仑路东段市政道路工程","征收","项目总用地约2563平方米(折合约3.
844亩).
道路全长约206米,红线宽度为12米.
昆仑路东段市政道路工程总投资4244万元,其中工程费用292万元,其他费用3750万元(含征地拆迁费用3579万元)","4244",,,"拆迁","800","25","785","0.
98125",,"0","总26户,已腾空24户.
","蔡海波","项伟胜""27","牛岭路","征收","道路长530米,宽40米,局部渠化宽50米","6600",,,"完成房屋征收.
","1600","15","30","0.
01875",,"0","完成土地预审、可研报批稿;完成入户丈量.
","陈龙","林瑞荣林世南""28","中央涂A-1地块","征收","地块面积137亩,征收旧房建筑面积100000余平方米.
",,,,"完成地块房屋拆除.
完成地块挂牌出让.
","7900","230","8631","1.
09253164556962",,"0","签订临时协议378户,腾空协议335户.
已拆除108户.
","林建永","项伟胜""29","中央涂A-3地块","征收","地块面积25.
4亩,征收旧房面积约2万余平方米.
",,,,"完成房屋征收.
","2000","0","0","0",,"0","拆迁调查","蔡海波","项伟胜""4","松台街道项目",,,,,,"小计:","7000","110","666","0.
0951428571428571","0","0",,,"责任人:",,"陈翔俊、董晓来",,"责任单位:",,,"松台街道""1","双桥村(下桥自然村)","新开工","松台街道双桥村,占地273亩,面积26.
8万平方米.
一期启动下桥自然村地块,建筑面积94000平方米","163800",,,"E-30、E-33地块8月进场施工,桩基施工,地下室施工","3000","100","596","0.
198666666666667",,"0","已签订协议208户,腾空185户,拆除182户,拆除面积3.
8万平方米","潘小雷蔡洋","张敏林世南""2","九山一号地块","新开工","松台街道九山村,占地22.
9亩,面积25000平方米.
","15000",,,"3月施工进场,桩基施工,地下室施工","4000","10","70","0.
0175",,"0","已签订协议119户,腾空105户,拆除82户,拆除面积1.
5万平方米","占志清","陈洁林世南""5","五马建设项目",,,,,,"小计:","15500","1150.
1","6477","0.
417870967741935","18051","1.
16458064516129",,,"责任人:",,"胡俊武、南胜国",,"责任单位:",,,"五马街道""1","永川路地块安置房","续建","总用地面积35981平方米(折合53.
97亩).
总建筑面积为151491平方米,计入容积率建筑面积为127253平方米.
(一期开工建设的为3、4、5、6号楼,建筑面积65567平方米.
)","107659(工程47166)","17580(1期中标价)","2011.
11-2016.
12,1140天","6月份地下室完工,12月份3、4、5、6号楼房屋主体建设.
","6100","440","2530","0.
414754098360656","13753","2.
25459016393443","地下室土方开挖、砖胎模砌筑、底板浇筑.
","夏阵雨","陈志坚林世南""2","18、19#地块10、13、14幢安置房","续建","东江锦园18、19地块1-14幢安置房,总建筑面积99026平方米,安置住宅72541平方米.
其中东江锦园10、13、14幢建筑面积32652平方米.
","72994","7300(剩余工程量)","2006.
12-2015.
12","12月份,东江锦园13、14幢安装工程完成.
东江锦园10幢中间验收.
","3000","300","2030","0.
676666666666667","2327","0.
775666666666667","东江锦园10幢主体至十二层,13,14幢主体完成,已结顶,现进行墙体砌筑工程.
","夏阵雨","陈志坚林世南""3","吴桥单元丰收村B-1地块建设工程","续建","总用地面积8229平方米(折合约12.
34亩).
总建筑面积为31811平方米,计入容积率地上建筑面积为24687平方米(其中住宅21789平方米、商业2631平方米、配套用房267平方米),另地下室6783平方米,架空层341平方米.
容积率为3.
0,绿地率为30%,建筑密度为24.
1%.
","15368(工程11480)","约11000","688天","第一季度:2月份地下室结顶,主体结构施工30%;第二季度:主体结构施工100%,二次结构、机电安装30%,6月底房屋结顶;第三季度:二次结构施工80%,安装、装修工程80%;第四季度:二次结构和安装、装修工程100%,12月进行竣工验收.
","5700","407","1761","0.
308947368421053","1971","0.
345789473684211","1.
地下室顶板浇筑全部完成;2.
1#楼主体二层施工,2#楼主体二层施工,3#楼主体三层施工","刘益铭","林世南""4","永楠小学地块","新开工","用地面积约12.
274亩.
建筑面积约12000平方米.
","7200",,,"年内完成剩余房屋征收工作,争取开工.
","500","3.
10000244140625","111","0.
222",,"0","设计方案在优化,土地预审已完成,土地移交协议市城乡投资公司在走审签程序.
","夏阵雨","林世南""5","永川路二期地块","征收",,,,,"年内完成剩余9户的房屋征收工作,争取地块出让,安置房开工","200","0","45","0.
225",,"0","6月20日依法拆除周阿旺,王岩灶,王爱华、岑志友3户,目前剩余6户还未签订协议","左亮","林世南陈国琴""6","南汇街道项目",,,,,,"小计:","102300","9105.
45","40907.
02","0.
39987311827957","48869","0.
477702834799609",,,"责任人:",,"林仕德、安建光",,"责任单位:",,,"南汇街道""1","葡萄居住区13-1地块安置房","续建","总用地面积25255平方米(折合约37.
88亩).
总建筑面积为121895平方米,计入容积率地上建筑面积为88391平方米.
容积率为3.
5,绿地率为30%,建筑密度为30%.
","89559(工程48870)","估计35000","2013年11月20日工期910天","10月完成地下室施工.
","11000","982.
33","2824.
0225","0.
256729090909091","4612","0.
419272727272727","已办理用地规划许可证、土地证、工程规划许可证.
工程:基坑东北和东南两角已出土完毕,正进行二层支撑梁垫层施工;其他位置出二层土;基坑检测单位已经进场监测.
","吴旭东","林世南""2","葡萄居住区9-1地块安置房","续建","总用地面积25338平方米(折合约38亩).
总建筑面积为124702平方米,计入容积率地上建筑面积为88682平方米.
容积率为3.
5,绿地率为30%,建筑密度为30%.
","89488(工程48461)","48046","2013年6月20日工期1180天","总7幢,9月完成地下室,年底完成10层以下主体结构.
","18000","1642.
5","8683.
53","0.
482418333333333","8004","0.
444666666666667","四证已办理齐全;工程:1-2#楼主体21-22层施工,3-4#楼、7#楼主体1-2层施工,5-6#楼地下室顶板施工.
","吴旭东","林世南""3","葡萄居住区6-3地块安置房","续建","总用地面积25521平方米(折合约38.
28亩).
总建筑面积为126681平方米,计入容积率地上建筑面积为89322平方米.
容积率为3.
5,绿地率为30%,建筑密度为30%.
","87844(工程47780)","估计34400","2013年11月20日工期910天","10月完成地下室施工.
","10000","1017.
52","3493.
7625","0.
349376","2543","0.
2543","已办理用地规划许可证、土地证(一期);工程规划许可证(一期)办理中.
工程:第一道支撑梁已浇筑完成,西南与西北第二层土出土完毕,正在浇筑第二道支撑的混凝土垫层","吴旭东","林世南""4","葡萄居住区10-1地块安置房","续建","总用地面积12134平方米(折合约18.
20.
亩).
总建筑面积为59470平方米,计入容积率地上建筑面积为42468平方米.
容积率为3.
5,绿地率为30%,建筑密度为30%.
","42064(工程23345)","估计16800","2013年11月20日工期910天","10月完成地下室施工.
","7000","666.
84","1543.
60125","0.
220514285714286","2571","0.
367285714285714","已办理用地规划许可证、土地证、工程规划许可证.
工程:表层土开挖,第二道冠梁垫层浇筑.
","吴旭东","林世南""5","横渎河西A18-1地块建设工程","续建","总用地面积26032平方米(折合约39亩).
总建筑面积为112040平方米,计入容积率地上建筑面积为78095平方米,容积率为2.
99,绿地率为35.
0%,建筑密度为29%.
","79045(工程45279)",,"2013.
10工期910天","10月完成地下室施工.
","9000","130.
06","1312.
21125","0.
145801111111111","10458","1.
162","已办理用地规划许可证;供地手续资料已提交区国土局窗口.
工程:抗压桩727根、三轴搅拌桩2760幅、塔吊桩20根均已完成;抗拔桩368根,完成94.
3%;围护桩561根,完成96.
8%;支撑桩133根,完成91%;高压旋喷753根,完成31.
6%;需补桩32根,完成81.
25%.
","吴旭东","章月影林世南""6","A-37a-1地块项目","续建","总用地面积24296平方米(折合36.
4亩).
总建筑面积为109405平方米,计入容积率地上建筑面积为77741平方米","64188(工程42155)","29600","2012年10月起,970天","完成1-6#楼的主体结构,开始砌体施工.
11月房屋结顶.
","10000","1068","5327","0.
5327","5634","0.
5634","四证已办理齐全;工程:1-3#楼屋面层结构施工,18-19层砌体施工;4-6#楼14-15层主体施工;两层地下室砌体砌筑.
","吴旭东","洪文滨林世南""7","东屿村地段C-7-1地块建设工程","续建","总用地面积18646平方米(折合约27.
96亩).
总建筑面积为72932平方米,计入容积率地上建筑面积为52208平方米.
容积率为2.
8,绿地率为30%,建筑密度为25%.
","46870(工程28622)","东屿一标段:50918","2013年7月18日工期1310天","7月完成地下室施工.
","7700","712.
5","3825","0.
496753246753247","3565","0.
462987012987013","四证已办理齐全;工程:8#楼西侧地下室顶板浇筑完成;9#-10#楼主体3-4层施工;11#-14#楼地下室底板及负二层墙柱施工.
","吴旭东","林世南""8","东屿村地段C-8-2地块建设工程","续建","总用地面积8650平方米(折合12.
97亩).
总建筑面积为27216平方米,计入容积率地上建筑面积为19029平方米.
容积率为2.
2,绿地率为30%,建筑密度为25%","17917(工程11173)",,"2013年4月25日工期1020天","10月主体结构结顶.
","4900","502.
5","2196","0.
448163265306122","2626","0.
535918367346939","四证已办理齐全;工程:15-16#楼主体5-6层施工;17#楼主体13-14层施工.
","吴旭东","林世南""9","东屿村地段C-12-1地块建设工程","续建","总用地面积9543平方米(折合约14.
31亩).
总建筑面积为36002平方米,计入容积率地上建筑面积为25765平方米.
容积率为2.
7,绿地率为30%,建筑密度为35%.
","23275(工程14294)",,"2013年4月25日工期1210天","11月房屋主体结顶.
","5700","562.
5","2440","0.
428070175438596","2325","0.
407894736842105","四证已办理齐全;工程:18-19#楼主体13-14层施工;20-21#楼主体4-5层施工.
","吴旭东","林世南""10","东屿村地段C-2-5地块建设工程","续建","总用地面积9551平方米(折合约14.
32亩).
总建筑面积为36390平方米,计入容积率地上建筑面积为25787平方米.
容积率为2.
7,绿地率为30%,建筑密度为30%","23382(工程14354)","东屿二标段:24805","2013年11月20日工期1110天","12月地下室施工.
","4000","427.
5","2676","0.
669","1720","0.
43","四证已办理齐全;工程:工程桩、围护桩、水泥搅拌桩全部完成;5-6#楼第一道支撑梁施工.
","吴旭东","林世南""11","东屿村地段C-1-6地块建设工程","新开工","总用地面积8161平方米(折合约12.
24亩).
总建筑面积为30410平方米,计入容积率地上建筑面积为22035平方米.
容积率为2.
7,绿地率为30%,建筑密度为25%.
","20009(工程12076)",,"2014年12月20日工期1110天","10月完成施工图设计,12月进场施工.
","2000","112.
5","112.
5","0.
05625",,"0","地质详勘已完成,初步设计中.
","吴旭东","林世南""12","牛山北路(温州大道-德政路)改建工程","续建","北起温州大道,南至瓯海交界.
道路全长1565米,改建后为城市Ⅰ级主干道,道路宽度为50米,局部路口为60米,道路横断面为双向八车道,设计行车速度为50千米/h,其中桥梁两座,长240米.
","28053(工程14830)","10265;(一标4683,二标5582)","2012.
4-2013.
12","6月完成附属工程及竣工验收工作.
","600","0","880","1.
46666666666667","1899","3.
165","需要做出征收决定,对春兰拉链厂进行司法征收.
牛山绿化配套施工、细部工程施工及沥青整改修复.
","吴旭东占鹏程","胡慧雷林世南""13","农房改造德政集聚点(牛桥底佳苑)一期工程","续建","总建设用地面积12208平方米(A02地块2658平方米,A07地块9550平方米).
总建筑面积37500平方米","20369(工程12684)","8912","2012.
6-2014.
7,工期780日","7月工程竣工验收.
","2700","1060.
200625","4114.
5","1.
52388888888889","2191","0.
811481481481481","四证已办理齐全;工程:附属施工.
1-2#楼主体外露管线修补;3-4#楼外墙真石漆喷涂,水电局部返工;裙楼部分石材幕墙施工;地下室风管、喷淋管及桥架已基本安装完成.
","吴旭东","项旭光林世南""14","德政东路(牛山北路—六虹桥路)","续建","北起六虹桥路,南至牛山北路,全长979米,宽度40米,按城市次干路Ⅰ级设计,设计车速拟按40千米/h,双向6车道.
","13179(工程7007)","2796(桥梁工程)1624(道路工程)","2013年10月-2015年12月","进行交通设施工程施工.
","2000","108","352.
7003125","0.
17635","721","0.
3605","0#台台帽浇筑,游步道施工.
","吴旭东","胡慧雷林世南",,"征收",,,,,"对涉及到的葡萄村、里垟村、德政村的旧房进行征收(置换).
","1000","0","717","0.
717",,"0","前期调查和丈量工作正在开展中.
","占鹏程","15","蛟凤北路","续建","北至牛山北路,南至金温铁路以北约45米,全长约315米,规划红线宽度40米,按城市主干路Ⅰ级设计,设计车速拟按50千米/h,双向6车道,建设周期24个月.
","6079(工程3472)",,"2014.
3-","拆征完成的情况下,10月完成桥梁下部结构.
","2000","0","206.
20015625","0.
1031",,"0","完成对蛟凤北路工程范围内的温州市水产供销公司签订协议,并拆除部分旧房.
规划用地许可证已办理.
办理质、安监手续,项目部落实.
规划用地许可证已办理.
办理质、安监手续,项目部落实.
","吴旭东占鹏程","林世南""16","东屿村地段C-2-3a、C-2-3b地块建设工程","新开工","总用地面积约5052平方米(折合约7.
58亩),建筑面积为11300平方米.
(一)C-2-3a地块用地面积约2475平方米(折合约3.
71亩),计入容积率地上建筑面积2227平方米.
容积率为0.
89,绿地率为20%,建筑密度为32.
9%.
(二)C-2-3b地块用地面积约2578平方米(折合约3.
87亩),计入容积率地上建筑面积6445平方米.
容积率为2.
49,绿地率为30%,建筑密度为3.
5%.
","7179(工程5468)",,,"3月完成施工图设计,6月进场施工,年底完成桩基施工.
","2000","112.
5","170","0.
085",,"0","已办理用地规划许可证、C-2-3a土地证;监理招标文件编制中;基坑图纸审查会议后修改中;C-2-3b地块已委托评估地价.
","吴旭东","林世南""17","德政村牛桥底二期","征收","占地87亩,建筑面积8.
7万平方米.
","52200",,,"未经登记建筑初审公示后启动入户调查,制定补偿方案,召开动员大会,签订临时协议及旧房拆除,10月底完成建筑垃圾清运,地质勘查进场施工.
","2700","0","33","0.
0122222222222222",,"0","前期工作红线已划定,规划设计条件通知书已出具;规划红线已划定.
可研报告编制中.
","吴旭东占鹏程","项旭光林世南""7","滨江街道项目",,,,,,"小计:","40000","437.
7","9682","0.
24205","21191","0.
529775",,,"责任人:",,"贾钧钬、金生",,"责任单位:",,,"滨江街道""1","黎二村10号地块(洪殿单元B-36号地块)城中村改造建设工程","续建","总用地面积20000平方米(折合约30亩).
总建筑面积为104148平方米,容积率为3.
99,绿地率为30.
0%,建筑密度为27.
2%.
","65595","46500","2013年8月1日开工,工期998天","1-3月份土方开挖,5月份完成地下室施工,10月份主体结构结顶,11-12月份主体抹灰,外立面工程,门窗安装,地下室装修等","20000","193","7315","0.
36575","10083","0.
50415","土方开挖和围护第二道支撑施工,部分区域土方开挖完成,地下室底板浇筑完成;东北角角撑开始拆除.
","林国华陈旭忠","朱启龙林世南""2","滨江商务区9号地块(同心社3号地块)城中村改造工程","续建","总用地面积18563平方米(折合约27.
84亩).
计入容积率地上建筑面积为69981平方米,容积率为3.
769,绿地率为30.
0%,建筑密度为25.
8%.
地点:高田路","74746","42000","2013年8月15日开工,工期998天","1-2月份桩基施工、井点降水,3-6月份土方开挖,9月份完成地下室施工,10-12月份地上主体结构施工","18000","193.
40015625","2298","0.
127666666666667","11108","0.
617111111111111","目前因场地原因,处于停工状态","黄锦辉陈旭忠","林世南周丰""3","黎二村5号地块(洪殿单元E-04号地块)城中村改造工程","新开工","地点:黎二村筲箕涂、江滨路.
总占地550亩.
5#地块72.
93亩,建筑面积22万平方米.
","128695","61000","工期998天","9月份开工","2000","51.
3000390625","69","0.
0345",,"0","拆迁签约正在进行中","林国华陈旭忠","金国平林世南""8","七都建设项目",,,,,,"小计:","55500","4530","22771","0.
410288288288288","11971","0.
215693693693694",,,"责任人:",,"叶恒坚",,"责任单位:",,,"七都街道""1","七都千亩征地等项目安置房与七都农房集聚区(一期)工程","续建","总用地面积40043平方米(折合约60.
06亩),建筑占地面积6602平方米,总建筑面积95238平方米.
地上总建筑面积72112平方米,其中住宅63788平方米(其中约40000平方米用于安置项目,约23788平方米用于农房集聚项目)","46998","24311","2012.
1~2014.
12,1095日历天","配套附属设施,12月竣工.
","8000","1050","4060","0.
5075","4060","0.
5075","室内外装饰完成至92%,外门窗框安装完成至93%.
","吴照林","郑晓东""2","吟州堤","续建","吟州堤全长1449.
3米.
","34800(东、南、吟州合计)","2255","2011-2013.
12,610天","5月完工.
","500","80","500","1","500","1","吟州堤主体工程完成","吴照林","杨德听庄建中""3","纬一路一期","续建","工程总用地面积约86845平方米,道路建设用地约83173平方米.
道路全长1992米,红线宽度为36米,K0+000-K0+160段,红线宽度为36-40.
5米.
","20138","12997","2012.
10~2014.
12,365日历天","附属配套工程施工,6月竣工.
","3000","1000","3000","0.
870000610351563","3000","1","主体工程已完工,处在工程收尾阶段.
","吴照林","王长青郑晓东""4","经四路一期工程(环岛南路-纬二路)","新开工","工程长度约为1953米,红线宽度24米,用地面积约60656平方米.
按城市次干道Ⅰ级标准,设计车速为40千米/小时.
","20997(其中工程13432)","11267","2013.
1-2014.
12","工程全段的道路路基施工,给排水管线施工完成,电力管线完成施工,一号~六号桥施工完成,一号箱涵~三号箱涵完成施工","6000","400","2111","0.
25","4411","0.
735166666666667","有80米左右路基正在进行堆载预压、三号桥桥桩已完成19根、沿河挡墙Φ800钻孔灌注桩已完成150根、已完成沿河挡墙60米、一号箱涵基础钢筋开始绑扎.
可施工段预应力管桩已全部完成.
2014年5月20日浇注完成第一根桥梁板.
已完成20米梁板12块、16米梁板2块.
","吴照林","郑晓东""5","纬二路一期","新开工","道路全长约1013米,红线宽度为24米.
路面结构为沥青砼路面.
","14284",,"17个月","2014年完成50%工程量(含高压地埋箱涵管道)","6500","0","0","0",,"0","施工图已经审查完毕并已经领取工程规划许可证.
","张崇波","郑晓东""6","经三路一期","新开工","道路全长约937米,红线宽度为30米.
按城市主干道Ⅰ级标准,设计时速50千米/小时,路面结构为沥青砼路面.
","12659",,"18个月","2014年完成50%工程量(含高压地埋箱涵管道)","5000","0","0","0",,"0","施工图已经审查完毕并已经领取工程规划许可证.
","张崇波","郑晓东""7","垃圾转运站","新开工","计入容积率地上建筑面积为5700平方米.
容积率为0.
549,绿地率为25%,建筑密度为22.
4%.
","4078",,"2012.
1-2015.
12","12月竣工","3000","0","0","0",,"0","已经领取工程规划许可证,并完成施工、监理招标等前期工作","张崇波","郑晓东""8","温州中心大厦(预名)","新开工","七都广场(超五星宾馆),占地109亩,其中五星级酒店6万平方,商业面积6万平方,超高层主体建筑高度约280米,容积率不大于4.
5.
建设面积32.
7万平方米","685000",,,"基础施工.
","23500","2000","13100","0.
557446808510638",,"0","现场施工围墙已搭建;基坑支护方案论证完成,近期施工;根据规划新规方案调整.
","张崇波","曾恩伟郑晓东""9","塘河建设项目",,,,,,"小计:","38000","5048","19227.
6","0.
50598947368421","11241","0.
295815789473684",,,"责任人:",,"顾武军",,"责任单位:",,,"区温瑞塘河保护管理委员会""1","纺织路庄头改建地块安置房工程","续建","安置地块建设用地面积41089平方米(61.
63亩),总建筑面积124702平方米(其中地上91755平方米,地下29762平方米,架空层3185平方米),容积率2.
23.
","136908(工程46745,征收66946)","43800","2012.
12-2015.
12","7月完成地下室,12月房屋结顶,年底前完成工程量60%.
","20400","1495","8945","0.
438480392156863","7341","0.
359852941176471","地下室工程完成83%","林喆","杨德听""2","截污纳管工程","续建","1、南汇街道:开展城市中心区、横渎村、鱼鳞浃片区污水整治工程;2、五马街道:龟河片区污水整治工程;3、松台街道:双乐住宅区片区污水整治工程;4、双屿街道:黄龙住宅区西分区、卧旗山、双屿客运中心、鹿城工业区、鞋都一、二、三期片区污水整治工程;5、滨江街道:上陡门住宅区、新城、江滨路北片区、东游路、洪殿新村片区污水整治工程","26794",,,"完工.
","7300","977","4059.
6025","0.
556109589041096","1237","0.
169452054794521","1、南汇街道:开展城市中心区完成35%、鱼鳞浃片区完成10%,东屿河片区完成75%;上田村片区完成95%;2、五马街道:龟河片区完成70%;3、松台街道:双乐住宅区片区68%;4、双屿街道:黄龙住宅区西分区完成65%、卧旗山、双屿客运中心完成40%、鹿城工业区东分区完成28%、西分区完成38%,鞋都一、二、三期南分区进场施工、北分区暂停施工;5、滨江街道:上陡门住宅区完成57%、新城东片区完成25%西片区已进场施工、江滨路北片区完成工程量58%、东游路片区合同备案、洪殿片区完成20%.
","朱海滨(相关街道)","杨德听""3","吴桥路A2地块安置房工程","续建","建设用地面积9267平方米,建筑面积30295平方米,其中住宅19622平方米,商业5204平方米,配套用房419平方米,架空层220平方米,地下室4830平方米.
","11102(工程8194)","7000","2010.
7~2014.
6","6月竣工,下半年交钥匙.
","770","185","800","1.
03896103896104","956","1.
24155844155844","A幢地下室地面、扫尾、分户验收.
","林喆","杨德听""4","吴桥路C地块安置办公楼工程","续建","总用地面积5254平方米,总建筑面积19330平方米,容积率3.
68,另地下室面积3741平方米,地上设备夹层建筑面积877平方米.
","9423(工程6932)","6819","2011.
5~2014.
12,23个月","8月份房屋结顶.
","2680","70","1405","0.
524253731343284","1609","0.
600373134328358","内外墙砌体、粉刷;开始安装门窗.
","林喆","杨德听""5","汇昌河水上公园C段规划道路工程","新开工","1、规划道路长356米,宽7.
5米.
2、规划道路长485米,宽16米.
","9912(工程1394,拆征7679)","224","2013.
7-2014.
12","完成一期2号道路建设,7月通车.
","270","255","197","0.
72962962962963","98","0.
362962962962963","道路基础施工.
","林喆","杨德听""6","吴滨巷地块安置房建设工程","新开工","安置地块建设用地面积9367.
8平方米(14.
05亩),总建筑面积34193平方米(其中地上25584平方米,地下室7789平方米,架空层820平方米),容积率2.
731.
","54133(工程12916,拆征30082)",,,"完成项目前期、10月份进场开工.
","2110","1105","1455","0.
68957345971564",,"0","施工图设计阶段.
","林喆","杨德听""7","核心片区南门单元A-01至A-03地块改建工程(菜篮子5号地块,旧货交易市场)","新开工","总净用地面积1.
83公顷.
根据控规,地上总建筑量约3.
46万平方米,容积率4.
64.
公园绿地8176平方米,广场用地2669平方米.
","30845(工程9235)",,,"完成项目前期、12月份进场开工.
征收扫尾工作.
","2820","911","2181","0.
773404255319149",,"0","前期:同丰收村共同立项等问题协调工作.
征收:民宅(21户)已签订临时协议;温州市海运集团温州分公司(旧货市场搬迁、白小平司法征收程序.
","林喆(五马街道)","杨德听""8","新纺织路建设工程","新开工","改造原纺织路,道路全长610米,路宽16米.
","2648(工程1121、拆征1237)",,,"开工建设.
(属地街道完成征收后4个月)","1650","50","185","0.
112121212121212",,"0","I标段已招标.
","林喆(南汇、五马街道)","杨德听""10","交通建设项目",,,,,,"小计:","52100","4840","27024","0.
518694817658349","44133","0.
847082533589251",,,"责任人:",,"王炯",,"责任单位:",,,"区交通运输局""1","双屿至藤桥公路工程","续建","项目全长7.
16公里,总用地面积约367294平方米(折合551亩),沿线设置分离式隧道6座,总长5662米,其中长隧道(宝昌岭)2座长3494米,中隧道(林里)2座长1500米,短隧道(白虎岩)2座长668米.
","137329(工程71920)","7.
02亿(藤桥段)","2012年-2015年,36个月","一标:2014年2月完成招标,4月份进场施工,计划完成投资额1.
5亿.
其中隧道完成9000万元,桥梁完成3500万元,路基及其他完成2500万元.
二标:计划完成投资额1.
6亿元.
其中隧道完成1.
4亿元,隧道开挖完成70%(如晚上不能爆破,将影响计划进度),路基及其他2000万元,路基及防护基本完成.
","20000","340","7039","0.
35195","14555","0.
72775","4月份由于下际弃渣场处理的进程和方案的变化,造成一标路基和隧道口开挖无法进行,工程处于停工状态.
","中信昊园投资有限公司","吴海燕郑晓东",,"征收",,,,,"1季度:完成中心城区内土地(三期)组件报批;2季度:完成二期土地的分户丈量;双屿街道完成房屋征收工作;3季度:政策处理、迁改工作;4季度:三期土地的供地手续.
","600","200","360","0.
6",,"0","1、与区国土对接城区土地报批问题;2、办理二标项目部驻地临时用地手续;3、办理二期用地供地审批及划拨手续;4、办理林地采伐证.
5、林里段隧道口电力迁改进场施工;6、争取陈村段综合通讯管线进场施工.
","徐宁(双屿街道)",300","220","300","1",,"0",,"徐宁(仰义街道)","2","仰义至双屿段公路改建工程","续建","全长6.
47千米,按一级公路标准结合城市道路功能设计,宽50米或40米,双向6车道,设计速度60千米/小时.
计划2014年通车.
","70135","约3亿","2012年-2015年,36个月","1季度:桥梁桩基和下部结构施工.
洞桥山至标尾左幅道路全线贯通.
2季度:桥梁继续下部结构施工,完成后京桥、前京左线桥的上部结构.
后京村至前京村改河段护岸挡墙全部结束.
3季度:桥梁完成河岙桥右幅和仰义桥辅道桥、岩门2#桥、后江桥梁板架设施工;完成洞桥山至标尾道路右幅路面下面层施工.
4季度:拉通标头至洞桥山半幅.
完成洞桥山至标尾整幅道路沥青上面层施工.
完成岩门1#桥、岩门2#桥、后江桥桥面系及附属工程.
","8000","810","4410","0.
55125","14306","1.
78825","一标:凤凰山山体开挖正在施工中.
二标:左幅新建路段已开放交通,新老路基搭接完成水稳层施工,左幅新建路段辅车道水稳层已返工,岩门山山体开挖还在施工中,,左侧雨水管完成1543米、电力管道完成2000米,通信管线完成1100米,污水管顶管完成300米,污水井2座,自来水管完成500米,岩门1#桥、后江桥、岩门2#桥左幅桩基完成施工,岩门2#桥左幅2号承台完成施工,空心板梁预制完成15片.
1、完成洞桥工业区路口8只水表迁移;2、完成仰义桥周边电力线杆拆除并完成水库DN600供水管迁改;3、仰义桥水务DN600及水库DN400供水管迁改进场;4、前京村民用水管迁改施工;5、河岙桥10KV电力线迁改预算送审;6、仰义段扩征地类、面积、权属核对.
7、完成岩门2#桥右幅村民用供水管迁改及拆除桥边作为变压器新址迁移旧房;8、完成屿头后江桥段10KV电力线迁改并完成屿头北路口店里变压器迁移;9、腾跃路至岩门山段电力10KV土建进场.
","范大军","朱崇敏郑晓东",,"征收",,,,,"1、拆迁政策处理2、安置房前期工作","300","100","240","0.
8",,"0","继续征迁扫尾工作","徐宁(双屿街道)",,,"征收",,,,,,"700","100","560","0.
8",,"0","继续征迁扫尾工作,安置房前期工作","徐宁(仰义街道)","3","甬台温铁路鹿城段(箬笠岙安置房一期)","续建","建筑面积10万平方米(含地下室2万平方米),小高层.
","41488(征地费+工程费)","一期工程造价1.
4194亿元","2011-2015","1季度:工程主体全部结顶,砌体完成70%.
2季度:4月房屋结顶中间验收,装修阶段.
3季度:装修阶段.
4季度:主体装修,水电安装,电梯安装,基本完成.
","4000","670","2520","0.
63","3525","0.
88125","1、5#、9#楼中间验收,1#-5#、9#楼内外装修,水电安装.
","范大军(工程)侯超万(政策)(双屿街道)","郑晓东""4","绕城高速鹿城段拆迁安置房","续建","90194平方米,前京村仰义二小西边.
","23024","13997.
7","2010.
3-2014.
5,1078天","1季度:工程扫尾,工程预验收,工程整改阶段.
2季度:5月份工程竣工验收.
3季度:办理竣工决算、工程审计.
","2000","400","2300","1.
15","700","0.
35","弱电、消防检测、景观绿化预验收,整改阶段.
","范大军(工程)侯超万(政策)(仰义街道)","郑晓东""5","金温扩能配套工程(双岙片A-42地块安置房)","续建","总用地面积9390.
3平方米(折合约14.
10亩),总建筑面积31083平方米.
地上总建筑面积(计入容积率)23473平方米","14793","7869","2012.
10起,735天","第一季度:完成地下室底板、剪力墙及地下室盖板.
3月份完成地下室.
第二季度:完成1#-3#楼主体9层.
第三季度:完成1#-3#楼主体15层施工.
第四季度:完成1#-3#楼主体结顶","3900","600","2140","0.
548717948717949","4107","1.
05307692307692","1、1#、2#楼主体已完成十一层,3#楼主体已完成八层.
2、完成金温主线征地、拆迁,三期征迁工作已开始启动.
","范大军(工程)侯超万(政策)(双屿街道)","郑晓东""6","104国道西过境鹿城段(瓯江特大桥)","新开工","双向六车道一级公路,长9.
6千米,连接线1.
27千米.
","290000(鹿城段工程+安置)",,"2011.
12-2015","1季度:2月瓯江特大桥开工建设;第2、3季度:桩基施工;第4季度:承台施工.
","5000","1000","2200","0.
44","5740","1.
148","瓯江特大桥已完成12根桩基;西岸拌合楼基础完成,水泥罐已竖立;9#施工平台搭建完成.
1、查询城区内用地置换落实情况;2、办理十里村太山临时用地审批;3、办理安置地块的落实情况;4、协调十里村太山电力线迁改.
","徐宁(前期)范大军(工程)","郑晓东",,"征收",,,,,"1季度:土地组件报批;2季度:政策处理;3季度:政策处理、迁改工作;4季度:办理供地手续.
","2500","30","1250","0.
5",,"0","1、继续签订征地补偿安置协议;2、继续签订使用三家企业国有土地补偿安置表;3、陈村(92.
9205)亩、潘岙村(4.
4445亩)、林里、垟山、龙川等5个村征地协议签订","徐宁(双屿街道)",,,"征收",,,,,"1季度:土地组件报批;2季度:十里村太山接待的政策处理;3季度:政策处理、迁改工作;4季度:办理供地手续.
","2500","30","1375","0.
55",,"0",,"徐宁(仰义街道)","7","绕城高速西南线工程鹿城段","征收","路线全长10.
9千米,其中主线长9.
66千米,连接线长1.
275千米,双向六车道一级公路,鹿城段负责安置房、附属配套建设和属地征收.
市重点.
",,,,"1季度:完成垟山村、十里村、林里村、龙川村征地分户丈量及潘岙村借地工作;完成房屋征收工作.
2季度:完成澄沙桥村征地分户丈量及借地工作;3季度:办理供地手续;4季度:管线迁移、红线内外三改、现场政策处理.
","300","100","320","1.
06666666666667",,"0","1、与业主单位对接正岙村块石驳坎、果树、红线外坟地0.
3609亩补偿费及红线内3.
9亩补差征地款落实事宜;2、与业主协调潘岙村三改原设计圆涵洞改成箱涵洞事宜;3、正岙村交地事宜4、澄沙桥分户丈量前期工作;5、完成电信管线迁改;6、对接澄沙桥地埋管道迁改.
7、仰义坟墓总190座,546穴.
已迁移178座,502穴.
未迁移12座,44穴;8、双屿坟墓总128座,417穴.
已迁移64座,193穴.
未迁移44座,161穴,空坟17座56穴.
不用迁移3座,7穴.
","徐宁双屿街道","郑晓东胡小萍",,"征收",,,,,,"1000","140","1100","1.
1","300","0.
3",,"徐宁仰义街道","8","市域铁路S1线一期工程","征收","线路全长52.
22公里,项目工程用地2726.
89亩.
拆迁安置用地623.
5亩,配套设施用地1908亩,建设期限2012年-2016年.
其中鹿城段总投资8.
42亿,线路全长2.
8公里.
需征用项目土地377.
72亩,涉及五个村庄,德政村、前网村、上田村、里垟村、鱼鳞浃村.
","175.
76亿",,"2012年-2016年","1季度:完成里垟村、鱼鳞浃村、德政村征地分户丈量;2季度:完成上田村、前网村征地分户丈量;3季度:完成连体房、边角地带征;4季度:管线迁移、红线内外三改、现场政策处理.
","1000","100","910","0.
91","900","0.
9","电力10KV高压铁塔借地前期工作.
","侯超万南汇街道","郑晓东""11","水利建设项目",,,,,,"小计:","57100","4462","23589","0.
413117338003503","20126","0.
352469352014011",,,"责任人:",,"罗静方、郭文明",,"责任单位:",,,"区农林水利局""1","鞋都铁路沿线西侧56b、58号地块安置房","续建","占地面积43.
26亩,总建筑面积90900平方米.
","26431","24390","2013-2015","58#地块完成地下室施工,主体结构完成九层;56b#地块12月主体结构结顶","8000","835","4071","0.
508875","6784","0.
848","56b地块8#楼正在地下室结构施工,9#、10#楼已完成土方回填;58地块6#、7#楼正在地下室结构、顶板施工,2#楼已完成一层结构施工;3#楼正在地下室结构、顶板施工;4#、5#楼正在地下室底板施工","陈铣(双屿街道)","杨德听""2","双岙安置点A-47、A-48、A-49号地块安置房","续建","拆迁安置房,总建筑面积58458平方米,其中地下11218平方米.
","24885(工程19624)","14777","2013-2015","7月完成地下室施工,年底上部结构完成6层","5500","532","2517","0.
457636363636364","5581","1.
01472727272727","A-47地块已完成地下室底板施工;A-48地块土方外运基本完成,正在地下室垫层施工;A-49地块正在冠梁、支撑梁施工,局部土方外运","陈铣(双屿街道)","杨德听""3","牛岭16-1地块安置房","续建","占地面积16.
12亩,总建筑面积43900平方米.
","17689(其中征地费用1327)","10485","2012-2014,700天","12月主体结构结顶","5000","436","2471","0.
4942","4320","0.
864","已完成7~8层结构施工,正在一、二层砌体、水电安装","陈铣(双屿街道)","杨德听""4","黄龙片区北排工程","续建","位于双屿街道辖区,泰力路及郑桥路下.
内容主要包括北排箱涵、涵桥、北排水闸及相应的道路修复工程和地下管道修复工程","17869(其中工程13695)","13492","24个月","完成水闸工程及基本完成全段箱涵施工","5000","1023","3180","0.
636","2227","0.
4454","箱涵砼浇筑,灌注桩施工、箱涵基坑开挖.
","陈铣(双屿街道)","杨德听""5","丰门河整治工程(康城段)","续建","河道清淤拓疏长度约1695米,新开工河道护岸挡墙长度约1868米,河底控制高程0.
5米,工程等级为Ⅱ级,河道护岸工程按次要建筑物为3级,相应临时建筑物为4级.
","8394.
61","4834.
4725","18个月","基本完成全段河道整治施工","3000","236","1350","0.
45","1214","0.
404666666666667","灌注桩施工,挡墙施工,河道疏浚.
","陈铣(双屿街道)","杨德听""6","瓯江绕城高速至卧旗山段海塘工程","新开工","工程北起渔渡,南至卧旗山,同已建的城区防洪堤鹿城段相连,全长10.
008千米,防洪标准为100年一遇,工程等级为2级.
","274000(其中工程214700)",,"48个月","完成可研、初设等前期工作,10月中旬开工.
","2600","0","1200","0.
461538461538462",,"0","可研已报","南骏(住建局)","邱向真杨德听",,"征收",,,,,"房屋、土地征收","3000","0","400","0.
133333333333333",,"0",,"双屿街道",,,"征收",,,,,"房屋、土地征收","1500","0","900","0.
6",,"0",,"仰义街道","7","瓯江路西延工程","新开工","瓯江沿岸,卧旗山以西沿江路段.
","74345(仰义40362,双屿33983)",,"2013.
12~2015,24个月","完成所有前期,并争取开工.
","2000","0","200","0.
1",,"0","规划选址已完成,地籍图已完成.
","南骏(双屿、仰义街道)","邱向真杨德听""8","戍浦江河道(藤桥至河口段)整治工程","新开工","工程范围为戍浦江藤桥镇至河口段,总长7.
5千米,使区域排涝标准达到20年一遇.
","100151",,,"完成方隆至云上段河道开挖及部分驳坎建设.
6月中旬开工.
","3000","0","800","0.
266666666666667",,"0","初设内审会已开","南骏","王立彤杨德听",,"征收",,,,,"房屋、土地征收","5000","200","4000","0.
8",,"0",,"藤桥镇","9","瓯江治理一期工程(临江中心段防洪堤工程)","新开工","堤线全长4525米,四级堤防工程,堤顶高程以抵御20年一遇洪潮水位设计.
","32000",,"24个月","1月开工,基本桩基及部分土方开挖,抛石等工作.
","12000","1200","2500","0.
208333333333333",,"0","施工准备工作","南骏(藤桥镇)","王立彤杨德听""10","2#排涝水闸工程","新开工","东起星际路,西至卧旗山,南至奇伟路.
排涝标准为20年一遇.
","3000",,"15个月","完成主体及上部结构","1500","0","0","0",,"0","水保已批复","南骏(双屿街道)","杨德听""12","教育建设项目",,,,,,"小计:","3000","350","2040","0.
68","502","0.
167333333333333",,,"责任人:",,"全一凡",,"责任单位:",,,"区教育局""1","市少艺校扩建工程","续建","扩建用地面积4198平方米,总建筑面积6280平方米,新建建筑面积5239平方米,保留建筑面积810平方米.
建筑密度为34.
1%,绿地率36.
0%,容积率1.
44,机动车停车位6个.
","7871(其中工程2053,拆迁5060)",,"2012.
12~2014.
9","9月前投入使用","1500","150","900","0.
6","250","0.
166666666666667","完成中间验收,内外墙粉刷基本完成,钢结构构件开始施工","白劲松","伍挺""2","新桥头小学","续建","24个班,用地18亩,地上总建筑面积7549平方米.
","3482(其中工程2991)","2871","2012.
10-2014.
9","9月前投入使用","1500","200","1140","0.
76","252","0.
168","完成内外墙粉刷、进入内部装饰阶段,市级标化验收","白劲松","伍挺""13","卫生建设项目",,,,,,"小计:","10500","433.
6","3617.
8","0.
344552380952381","6607","0.
629238095238095",,,"责任人:",,"潘一凡",,"责任单位:",,,"区卫生局""1","鹿城区人民医院","续建","总用地面积19964平方米(折合29.
946亩).
总建筑面积为48470平方米,计入容积率地上建筑面积为35520平方米,另地下室建筑面积为9000平方米","33331(工程23176)",,"2013-2015;3年,830天","完成地下室,10月主体结顶.
","10000","400","3347.
4025","0.
33474","6607","0.
6607","A区C区地下室底板浇筑完成.
3#楼3.
6米层结构施工完成","潘一凡(双屿街道)","伍挺""2","鹿城区精神卫生中心、鹿城区残疾人托安养中心","新开工","地点:炬光工业园炬光西路130号.
新建5083平方米","2473",,,"1月开工,完成工程量80%","500","33.
60001953125","270.
40015625","0.
5408",,"0","完成工程桩,并进行静压测试","潘一凡(南汇街道)","伍挺""14","住建建设项目",,,,,,"小计:","20000","4955","11105","0.
55525","13105","0.
65525",,,"责任人:",,"周伟斌",,"责任单位:",,,"区住建局""1","里垟保障性安居工程","续建","项目建设用地面积40717平方米(折合约61.
08亩).
总建筑面积174266平方米,地上计入容积率面积138438平方米.
容积率为3.
4,绿地率为30.
3%,建筑密度29.
9%.
","80273","59000","2013.
7-2016.
4,998天","1-3月份完成第一层土方开挖;4-6月份完成第二层土方开挖和三角土开挖;7-9月份完成三角土区域及地下室施工,开始地上结构施工;12月份完成地下室.
","20000","4955","11105","0.
55525","13105","0.
65525","地下室土方总计约27万方,已完成开挖20万方,完成比例74%;地下室防水完成20%;底板施工完成30%;地下室外墙浇筑完成10%;塔吊全部完成安装.
","周伟斌(南汇街道)","林世南张纯亮""15","人防建设项目",,,,,,"小计:","2200","264","1320","0.
6","1320","0.
6",,,"责任人:",,"赵小松",,"责任单位:",,,"区人防办""1","鹿城1101工程(鹿城人防应急中心)","续建","总建设用地面积3620.
22平方米(折合约5.
4303亩).
总建筑面积11383平方米,计入容积率总建筑面积8628平方米","8130(工程5347)",,"752天,2013.
6-2015.
6","8月主体结顶,装修配套施工.
","2200","264","1320","0.
6","1320","0.
6","启动中间验收及幕墙施工","赵小松(南汇街道)","林世南""16","电网建设项目",,,,,,"小计:","41000","5380","23811","0.
580756097560976","17011","0.
41490243902439",,,"责任人:",,"戴瑞海",,"责任单位:",,,"鹿城供电分局""1","500KV温西输变电","续建","位于藤桥周师湾,76亩.
本期500千伏出线4回,主变2台,容量100万千伏安,采用3/2接线.
本期规模为4线2变,2个完整串+2个不完整串.
","48000",,,"土建施工,部分电气安装","12000","1400","6800","0.
566666666666667",,"0","三通一平工程试桩接近完成,500KV线路仰义段塔基基础开挖已完成,"两登记一公告"公示已完成.
","吴元坚","胡明亮邵豪哲""2","配网","续建",,,,,"正常施工","20000","3000","11800","0.
59","11800","0.
59","正常施工","吴元坚","胡明亮""3","智能电网改造","续建",,,,,"正常施工","4100","600","2379","0.
580243902439024","2379","0.
580243902439024","正常施工","吴元坚","胡明亮""4","110千伏双三变电工程","新开工","本期建设2*5万千伏安主变,采用110/10千伏有载调压变压器,接线组别为YN,d11.
本工程填方量6550立方米,新开工架空线路折单长度13.
6千米.
","7906",,,"土建施工,电气安装","2800","200","1607","0.
573928571428571","1607","0.
573928571428571","土建施工正在有序进行","吴元坚","胡明亮""5","110kV张宅输变电","新开工","所区面积:3528平方米(含公共绿化带554平方米).
","6183",,,"电气安装","2100","180","1225","0.
583333333333333","1225","0.
583333333333333","土建施工正在有序进行","吴元坚","胡明亮""6","温西变220KV送出工程","新开工","500KV温西变220KV送出工程共3个回路,分别为温西--马岙,温西--城西,温西--文武.
",,,,"施工建设","5000","180",,,,,"现正在开展政策处理开通及塔基基础开挖工作","吴元坚","胡明亮""17","移动4G建设项目",,,,,,"小计:","22000","2121.
42","12299.
64","0.
559074545454545","0","0",,,"责任人:",,"方如利",,"责任单位:",,,"移动鹿城分公司""1","鹿城移动无线城市建设项目","续建","建设TD基站691个;无线城市建设行业信息化大众应用,建设政府企业云计算中心,打造物联网平台.
","18900",,"2014年1月~2014年12月","建设TD基站691个;无线城市建设行业信息化大众应用,建设政府企业云计算中心,打造物联网平台.
","18900","1826.
24125","10726.
78","0.
567554497354497",,"0","建设TD基站322个;无线城市建设行业信息化大众应用,建设政府企业云计算中心,打造物联网平台.
","方如利","胡明亮""2","鹿城移动光纤网络助力城乡统筹建设项目","续建","新建传输网1200皮长公里,光纤到户5万,管道140公里.
新建5个汇聚机房,150个光交接箱.
","3100",,"2014年1月~2014年12月","新建传输网1200皮长公里,光纤到户5万,管道140公里.
新建5个汇聚机房,150个光交接箱.
","3100","295.
18015625","1572.
86125","0.
507374193548387",,"0","新建传输网6352皮长公里,光纤到户2.
42万,管道82.
58公里.
新建3个汇聚机房,75个光交接箱.
","方如利","胡明亮""18","电信C网建设项目",,,,,,"小计:","3200","850","2830","0.
884375","2280","0.
7125",,,"责任人:",,"张磊",,"责任单位:",,,"电信鹿城分局""1","电信LTE宏基站","续建","新选点10个左右,建宏基站.
","800",,"2014年1月~2014年12月","新选点10个左右,建宏基站.
","800","300","860","1.
075",,"0","已选点3个,建设中","张磊","胡明亮""2","电信室外RRU基站","续建","新选点15个左右,室外RRU基站.
","500",,"2014年1月~2014年12月","新选点15个左右,室外RRU基站.
","500","200","580","1.
16",,"0","已选点5个","张磊","胡明亮""3","电信室内分布及RRU","续建","新开工室内分布及RRU设备20个.
","500",,"2014年1月~2014年12月","新开工室内分布及RRU设备20个.
","500","150","470","0.
94",,"0","新开工室内分布及RRU设备5个","张磊","胡明亮""4","电信cdma网络改造","续建","cdma网络改造50个","400",,"2014年1月~2014年12月","cd米a网络改造50个","400","100","370","0.
925",,"0","cdma网络改造8个","张磊","胡明亮""5","电信光网城市改造FTTH及10GGPON、10GEPON改造","续建","光网城市改造FTTH及10GGPON、10GEPON改造.
","1000",,"2014年1月~2014年12月","光网城市改造FTTH及10GGPON、10GEPON改造.
","1000","100","550","0.
55",,"0","光网城市改造FTTH及10GGPON、10GEPON改造中","张磊","胡明亮""19","联通网络建设项目",,,,,,"小计:","7100","1220","5500","0.
774647887323944","0","0",,,"责任人:",,"张金勇",,"责任单位:",,,"联通鹿城分公司""1","联通宽带提速工程","续建",,"500",,"2014.
1-2014.
12","深化推进宽带提速工程","500","100","400","0.
8",,"0","FTTH网络改造中","张金勇","胡明亮""2","联通网络优化工程","续建",,"600",,"2014.
1-2014.
12","优化移动网络工程","600","120","600","1",,"0","本月优化改造3G设备100套,累计完成600套","张金勇","胡明亮""3","联通4G网络新建工程","续建",,"6000",,"2013.
1-2013.
12","4G网络新建工程","6000","1000","4500","0.
75",,"0","本月新建4G站点10个,累计90个","张金勇","胡明亮"

virmach:3.23美元用6个月,10G硬盘/VirMach1核6个月Virmach

virmach这是第二波出这种一次性周期的VPS了,只需要缴费1一次即可,用完即抛,也不允许你在后面续费。本次促销的是美国西海岸的圣何塞和美国东海岸的水牛城,周期为6个月,过后VPS会被自动且是强制性取消。需要临时玩玩的,又不想多花钱的用户,可以考虑下!官方网站:https://www.virmach.comTemporary Length Service Specials圣何塞VPS-一次性6个...

星梦云:四川100G高防4H4G10M月付仅60元

星梦云怎么样?星梦云资质齐全,IDC/ISP均有,从星梦云这边租的服务器均可以备案,属于一手资源,高防机柜、大带宽、高防IP业务,一手整C IP段,四川电信,星梦云专注四川高防服务器,成都服务器,雅安服务器。星梦云目前夏日云服务器促销,四川100G高防4H4G10M月付仅60元;西南高防月付特价活动,续费同价,买到就是赚到!点击进入:星梦云官方网站地址1、成都电信年中活动机(成都电信优化线路,封锁...

随风云25元/月 ,德阳高防云服务器 2核2G 10M 75元/月 内蒙古三线BGP服务器 2核2G 5M

公司介绍成都随风云科技有限公司成立于2021年,是国内领先的互联网业务平台服务提供商。公司专注为用户提供低价高性能云计算产品,致力于云计算应用的易用性开发,并引导云计算在国内普及。目前公司研发以及运营云服务基础设施服务平台(IaaS),面向全球客户提供基于云计算的IT解决方案与客户服务,拥有丰富的国内BGP、双线高防、香港等优质的IDC资源。公司一直秉承”以人为本、客户为尊、永续创新&...

联通宽带提速为你推荐
思科route支持ipad支持ipad支持ipad支持ipadphotoshop技术ps是一种什么技术??????tracerouteTRACEROUTE的作用是什么iphone连不上wifi为什么苹果手机连不上wifi微信都发不出去?win7telnetwindows7的TELNET服务在哪里开启啊csshack怎样找css hack 的最新使用方法
site5 新加坡服务器 pw域名 美国主机论坛 密码泄露 免费ddos防火墙 三拼域名 php空间申请 免费高速空间 免费申请网站 中国电信宽带测速网 能外链的相册 爱奇艺会员免费试用 多线空间 百度云加速 云服务器比较 免费个人主页 免费蓝钻 广东主机托管 阿里云邮箱个人版 更多