安装怎样关闭445端口

怎样关闭445端口  时间:2021-05-17  阅读:()
"",,,,,,"",,,,,,"新潭城市广场",,,,,,"",,,,,,"",,,,,,"最高投标限价",,,,,,"",,,,,,"",,,,,,"总金额(小写):",,"84073347元""(大写):",,"捌仟肆佰零柒万叁仟叁佰肆拾柒圆整",,,,"""",,,,,,"招标人:咨询人:","","","(单位盖章)单位盖章或资质专用章)","",,,,,,"",,,,,,"",,,,,,"法定代表人或其授权人:法定代表人或其授权人:","","","(签字或盖章)签字或盖章)","",,,,,,"",,,,,,"",,,,,,"造价工程师:"","(签字盖专用章)",,,,,"",,,,,,"",,,,,,"",,,,,,"",,,,,,"编制时间:"",,,,,,"",,,,,,"",,,"",,,"工程总承包费用汇总表",,,"工程名称:新潭城市广场",,,"第1页共1页""序号","项目名称","金额(元)","备注""1","勘察设计费","1000000","""2","建筑安装工程费","83073347","""3","设备及工器具购置费",,"""4","工程建设其他费",,"""合计","总价","84073347","","暂定金额汇总合计:","7500000","""暂定金额汇总表",,,"",,,"工程名称:新潭城市广场",,,"第1页共1页""序号","项目名称","金额(元)","备注""1","勘察费",,"""2","建筑安装工程","7500000","""2.
1","暂定金额专业工程","7500000","""2.
2","其他项目清单",,"""3","暂定金额的设备及工器具",,"""4","工程建设其他费",,"""合计",,"7500000","""",,,,"勘察设计费汇总表",,,,"",,,,"工程名称:新潭城市广场",,,,"第1页共1页""序号","项目名称","项目内容","金额(元)","是否暂定""1","勘察费","",,"""2","设计费","","1000000","""2.
1","设计费","","1000000","""2.
2","绿色建筑设计费","",,"""2.
3","施工图审查费","",,"""2.
4","非标准设备设计费","",,"""2.
5","BIM专项设计费","",,"""合计",,"","1000000","""",,,,,"建筑安装工程费汇总表",,,,,"",,,,,"工程名称:新潭城市广场",,,,"第1页共1页","序号","项目名称","项目内容","金额(元)",,"是否暂定""1","地上建筑","","36416668",,"""1.
1","房屋建筑与装饰工程","","24572820",,"""1.
2","主楼安装","","1789421",,"""1.
3","裙楼安装","","10054427",,"""2","地下建筑","","28479622",,"""2.
1","房屋建筑与装饰工程","","24153611",,"""2.
2","地下室安装","","3529179",,"""2.
3","人防工程","","238899",,"""2.
4","水泵房","","557933",,"""3","充电桩系统","","312345",,"""3.
1","安装工程","","312345",,"""4","变配电设备","","4857517",,"""4.
1","变配电工程","","4857517",,"""5","电梯工程","","2526300",,"""5.
1","安装工程","","2526300",,"""6","智能化工程","","1355342",,"""6.
1","智能化工程","","1355342",,"""7","室外安装工程","","1625553",,"""7.
1","室外安装工程","","1625553",,"""8","暂列金额","","5000000",,"""8.
1","暂列金额","","5000000",,"""9","暂定部分","","2500000",,"""9.
1","暂定金额专业工程","","2500000",,"""合计",,"","83073347",,"""设备及工器具购置费汇总表""工程名称:新潭城市广场",,,,,,"第1页共1页",,"序号","设备及工器具名称","规格型号、技术参数","单位","数量","设备单价(元)","综合单价(元)","合价(元)","是否暂定""合计""工程建设其他费汇总表",,,,"",,,,"工程名称:新潭城市广场",,,,"第1页共1页""序号","项目名称","项目内容","金额(元)","是否暂定""1","临时设施费","",,"""2","场地准备费","",,"""3","第三方建设的供电、供气、供水费用","",,"""合计""",,,"",,,"工程项目造价汇总表",,,"工程名称:新潭城市广场",,,"第1页共1页""序号","单项工程名称","金额(元)","1","地上建筑","36416668","2","地下建筑","28479622","3","充电桩系统","312345","4","变配电设备","4857517","5","电梯工程","2526300","6","智能化工程","1355342","7","室外安装工程","1625553","8","暂列金额","5000000","9","暂定部分","2500000","合计",,"83073347","",,,"单项工程造价汇总表",,,"",,,"工程名称:新潭城市广场地上建筑",,,"第1页共9页""序号","单位工程名称","金额(元)","1","房屋建筑与装饰工程","24572820","2","主楼安装","1789421","3","裙楼安装","10054427","合计",,"36416668","",,,"单项工程造价汇总表",,,"",,,"工程名称:新潭城市广场地下建筑",,,"第2页共9页""序号","单位工程名称","金额(元)","1","房屋建筑与装饰工程","24153611","2","地下室安装","3529179","3","人防工程","238899","4","水泵房","557933","合计",,"28479622","",,,"单项工程造价汇总表",,,"",,,"工程名称:新潭城市广场充电桩系统",,,"第3页共9页""序号","单位工程名称","金额(元)","1","安装工程","312345","合计",,"312345","",,,"单项工程造价汇总表",,,"",,,"工程名称:新潭城市广场变配电设备",,,"第4页共9页""序号","单位工程名称","金额(元)","1","变配电工程","4857517","合计",,"4857517","",,,"单项工程造价汇总表",,,"",,,"工程名称:新潭城市广场电梯工程",,,"第5页共9页""序号","单位工程名称","金额(元)","1","安装工程","2526300","合计",,"2526300","",,,"单项工程造价汇总表",,,"",,,"工程名称:新潭城市广场智能化工程",,,"第6页共9页""序号","单位工程名称","金额(元)","1","智能化工程","1355342","合计",,"1355342","",,,"单项工程造价汇总表",,,"",,,"工程名称:新潭城市广场室外安装工程",,,"第7页共9页""序号","单位工程名称","金额(元)","1","室外安装工程","1625553","合计",,"1625553","",,,"单项工程造价汇总表",,,"",,,"工程名称:新潭城市广场暂列金额",,,"第8页共9页""序号","单位工程名称","金额(元)","1","暂列金额","5000000","合计",,"5000000","",,,"单项工程造价汇总表",,,"",,,"工程名称:新潭城市广场暂定部分",,,"第9页共9页""序号","单位工程名称","金额(元)","1","暂定金额专业工程","2500000","合计",,"2500000","单位工程造价汇总表",,"",,"工程名称:新潭城市广场地上建筑房屋建筑与装饰工程",,"第1页共14页""序号","汇总内容","金额(元)""1","分部分项工程费","18735881""1.
1","砌筑工程","1399993""1.
2","混凝土工程","2497860""1.
3","屋面工程","1452143""1.
4","钢筋工程","4367117""1.
5","厨房卫生间防水","161676""1.
6","其他一般土建工程","208745""1.
7","门窗工程","1881833""1.
8","楼地面工程","992571""1.
9","内墙柱面工程","1262914""1.
10","外墙面工程","3392417""1.
11","天棚工程","671394""1.
12","其他装饰工程","447218""2","措施项目费","5836939""2.
1","总价措施项目费","774612""2.
1.
1","安全文明施工费","678250""2.
1.
2","其他总价措施费","83293""2.
2","单价措施项目费","5062327""3","其他项目费","3.
1","暂列金额","3.
2","专业工程暂估价","3.
3","总承包服务费","合计=1+2+3",,"24572820""单位工程造价汇总表",,"",,"工程名称:新潭城市广场地上建筑主楼安装",,"第2页共14页""序号","汇总内容","金额(元)""1","分部分项工程费","1717553""1.
1","水卫工程","426211""1.
2","电气工程","758070""1.
3","消防电工程","157393""1.
4","防火门系统","73405""1.
5","漏电火灾报警监控系统","6299""1.
6","设备电源监控系统","9445""1.
7","消防水工程","164415""1.
8","喷淋工程","43367""1.
9","智能照明工程","49534""1.
10","抗震支架","29414""2","措施项目费","71868""2.
1","总价措施项目费","43918""2.
1.
1","安全文明施工费","38916""2.
1.
2","其他总价措施费","5002""2.
2","单价措施项目费","27950""3","其他项目费","3.
1","暂列金额","3.
2","专业工程暂估价","3.
3","总承包服务费","3.
1","远程监控系统租赁费","3.
2","工程噪声超标排污费","3.
3","渣土收纳费","3.
4","优质工程增加费","3.
5","缩短定额工期增加费","3.
6","模拟清单不可预见费","3.
7","暂定金额","合计=1+2+3",,"1789421""单位工程造价汇总表",,"",,"工程名称:新潭城市广场地上建筑裙楼安装",,"第3页共14页""序号","汇总内容","金额(元)""1","分部分项工程费","9750042""1.
1","水卫工程","544794""1.
2","电气工程","1373874""1.
3","智能照明工程","354947""1.
4","消防电工程","931643""1.
5","防火门监控","61822""1.
6","漏电火灾报警监控系统","41647""1.
7","设备电源监控系统","23826""1.
8","气体灭火系统","51066""1.
9","无管网灭火系统","87912""1.
10","消火栓水工程","473267""1.
11","喷淋工程","1181031""1.
12","通风排烟工程","560484""1.
13","空调水系统","3534020""1.
14","抗震支架","529709""2","措施项目费","304385""2.
1","总价措施项目费","209137""2.
1.
1","安全文明施工费","186263""2.
1.
2","其他总价措施费","22874""2.
2","单价措施项目费","95248""3","其他项目费","3.
1","暂列金额","3.
2","专业工程暂估价","3.
3","总承包服务费","3.
1","远程监控系统租赁费","3.
2","工程噪声超标排污费","3.
3","渣土收纳费","3.
4","优质工程增加费","3.
5","缩短定额工期增加费","3.
6","模拟清单不可预见费","3.
7","暂定金额","合计=1+2+3",,"10054427""单位工程造价汇总表",,"",,"工程名称:新潭城市广场地下建筑房屋建筑与装饰工程",,"第4页共14页""序号","汇总内容","金额(元)""1","分部分项工程费","21130782""1.
1","土方工程","1202644""1.
2","基坑支护工程","6240838""1.
3","混凝土工程","4498584""1.
4","砌筑工程","193093""1.
5","地下室防水","1266201""1.
6","钢筋工程","5155182""1.
7","装饰工程","1869145""1.
8","其他装饰工程","82748""1.
9","其他地下室工程","344205""1.
10","门窗工程","278142""2","措施项目费","3022829""2.
1","总价措施项目费","748950""2.
1.
1","安全文明施工费","667034""2.
1.
2","其他总价措施费","81916""2.
2","单价措施项目费","2273879""3","其他项目费","3.
1","暂列金额","3.
2","专业工程暂估价","3.
3","总承包服务费","合计=1+2+3",,"24153611""单位工程造价汇总表",,"",,"工程名称:新潭城市广场地下建筑地下室安装",,"第5页共14页""序号","汇总内容","金额(元)""1","分部分项工程费","3393082""1.
1","电气工程","1243614""1.
2","消防电工程","271962""1.
3","漏电火灾报警监控系统","46492""1.
4","防火门系统","34931""1.
5","设备电源监控系统","32572""1.
6","生活给水","38624""1.
7","消火栓水","112323""1.
8","喷淋工程","247708""1.
9","集水坑排水","134368""1.
10","消防车取水口","13740""1.
11","排烟工程","261525""1.
12","平时通风","66148""1.
13","智能照明工程","241234""1.
14","抗震支架","647841""2","措施项目费","136097""2.
1","总价措施项目费","103638""2.
1.
1","安全文明施工费","92303""2.
1.
2","其他总价措施费","11335""2.
2","单价措施项目费","32459""3","其他项目费","3.
1","暂列金额","3.
2","专业工程暂估价","3.
3","总承包服务费","3.
1","远程监控系统租赁费","3.
2","工程噪声超标排污费","3.
3","渣土收纳费","3.
4","优质工程增加费","3.
5","缩短定额工期增加费","3.
6","模拟清单不可预见费","3.
7","暂定金额","合计=1+2+3",,"3529179""单位工程造价汇总表",,"",,"工程名称:新潭城市广场地下建筑人防工程",,"第6页共14页""序号","汇总内容","金额(元)""1","分部分项工程费","231342""1.
1","电气工程","178260""1.
2","人防弱电","10359""1.
3","战时通风","30965""1.
4","战时给水","11758""2","措施项目费","7557""2.
1","总价措施项目费","7240""2.
1.
1","安全文明施工费","6449""2.
1.
2","其他总价措施费","791""2.
2","单价措施项目费","317""3","其他项目费","3.
1","暂列金额","3.
2","专业工程暂估价","3.
3","总承包服务费","合计=1+2+3",,"238899""单位工程造价汇总表",,"",,"工程名称:新潭城市广场地下建筑水泵房",,"第7页共14页""序号","汇总内容","金额(元)""1","分部分项工程费","546477""1.
1","给水系统","136275""1.
2","消火栓水","212057""1.
3","喷淋系统","198145""2","措施项目费","11456""2.
1","总价措施项目费","10973""2.
1.
1","安全文明施工费","9773""2.
1.
2","其他总价措施费","1200""2.
2","单价措施项目费","483""3","其他项目费","3.
1","暂列金额","3.
2","专业工程暂估价","3.
3","总承包服务费","合计=1+2+3",,"557933""单位工程造价汇总表",,"",,"工程名称:新潭城市广场充电桩系统安装工程",,"第8页共14页""序号","汇总内容","金额(元)""1","分部分项工程费","311522""1.
1","充电桩系统","311522""2","措施项目费","823""2.
1","总价措施项目费","823""2.
1.
1","安全文明施工费","733""2.
1.
2","其他总价措施费","90""2.
2","单价措施项目费","3","其他项目费","3.
1","远程监控系统租赁费","3.
2","工程噪声超标排污费","3.
3","渣土收纳费","3.
4","优质工程增加费","3.
5","缩短定额工期增加费","3.
6","模拟清单不可预见费","3.
7","暂定金额","合计=1+2+3",,"312345""单位工程造价汇总表",,"",,"工程名称:新潭城市广场变配电设备变配电工程",,"第9页共14页""序号","汇总内容","金额(元)""1","分部分项工程费","4836033""1.
1","变配电工程","4836033""2","措施项目费","21484""2.
1","总价措施项目费","21484""2.
1.
1","安全文明施工费","19134""2.
1.
2","其他总价措施费","2350""2.
2","单价措施项目费","3","其他项目费","3.
1","暂列金额","3.
2","专业工程暂估价","3.
3","总承包服务费","合计=1+2+3",,"4857517""单位工程造价汇总表",,"",,"工程名称:新潭城市广场电梯工程安装工程",,"第10页共14页""序号","汇总内容","金额(元)""1","分部分项工程费","2526300""1.
1","电梯工程","2526300""2","措施项目费","2.
1","总价措施项目费","2.
1.
1","安全文明施工费","2.
1.
2","其他总价措施费","2.
2","单价措施项目费","3","其他项目费","3.
1","远程监控系统租赁费","3.
2","工程噪声超标排污费","3.
3","渣土收纳费","3.
4","优质工程增加费","3.
5","缩短定额工期增加费","3.
6","模拟清单不可预见费","3.
7","暂定金额","合计=1+2+3",,"2526300""单位工程造价汇总表",,"",,"工程名称:新潭城市广场智能化工程智能化工程",,"第11页共14页""序号","汇总内容","金额(元)""1","分部分项工程费","1326377""1.
1","停车场管理系统","122382""1.
2","视频监控系统","555109""1.
3","计算机网络系统","36344""1.
4","电梯五方通话","2056""1.
5","门禁对讲系统","249193""1.
6","巡更系统","15025""1.
7","光纤入户系统","142530""1.
8","有线电视系统","124875""1.
9","电子周界防护系统","78863""2","措施项目费","28965""2.
1","总价措施项目费","27175""2.
1.
1","安全文明施工费","24202""2.
1.
2","其他总价措施费","2973""2.
2","单价措施项目费","1790""3","其他项目费","3.
1","远程监控系统租赁费","3.
2","工程噪声超标排污费","3.
3","渣土收纳费","3.
4","优质工程增加费","3.
5","缩短定额工期增加费","3.
6","模拟清单不可预见费","3.
7","暂定金额","合计=1+2+3",,"1355342""单位工程造价汇总表",,"",,"工程名称:新潭城市广场室外安装工程室外安装工程",,"第12页共14页""序号","汇总内容","金额(元)""1","分部分项工程费","1583985""1.
1","电气工程","201050""1.
2","给水工程","347332""1.
3","排水工程","1035603""2","措施项目费","41568""2.
1","总价措施项目费","41568""2.
1.
1","安全文明施工费","37021""2.
1.
2","其他总价措施费","4547""2.
2","单价措施项目费","3","其他项目费","3.
1","远程监控系统租赁费","3.
2","工程噪声超标排污费","3.
3","渣土收纳费","3.
4","优质工程增加费","3.
5","缩短定额工期增加费","3.
6","模拟清单不可预见费","3.
7","暂定金额","合计=1+2+3",,"1625553""单位工程造价汇总表",,"",,"工程名称:新潭城市广场暂列金额暂列金额",,"第13页共14页""序号","汇总内容","金额(元)""1","分部分项工程费","1.
1","暂列金额","2","措施项目费","2.
1","总价措施项目费","2.
1.
1","安全文明施工费","2.
1.
2","其他总价措施费","2.
2","单价措施项目费","3","其他项目费","5000000""3.
1","远程监控系统租赁费","3.
2","工程噪声超标排污费","3.
3","渣土收纳费","3.
4","优质工程增加费","3.
5","缩短定额工期增加费","3.
6","模拟清单不可预见费","3.
7","暂定金额","5000000""合计=1+2+3",,"5000000""单位工程造价汇总表",,"",,"工程名称:新潭城市广场暂定部分暂定金额专业工程",,"第14页共14页""序号","汇总内容","金额(元)""1","分部分项工程费","1.
1","室外附属","2","措施项目费","2.
1","总价措施项目费","2.
1.
1","安全文明施工费","2.
1.
2","其他总价措施费","2.
2","单价措施项目费","3","其他项目费","2500000""3.
1","远程监控系统租赁费","3.
2","工程噪声超标排污费","3.
3","渣土收纳费","3.
4","优质工程增加费","3.
5","缩短定额工期增加费","3.
6","模拟清单不可预见费","3.
7","暂定金额","2500000""合计=1+2+3",,"2500000""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第1页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价","""地上建筑"单项工程(17房屋建筑与装饰)""房屋建筑与装饰工程"单位工程(17房屋建筑与装饰)""砌筑工程"分项工程(17房屋建筑与装饰)""1","010402001001","砌块墙","(1)砌块品种、规格、强度等级:蒸压加气混凝土砌块390*190*190A5.
0(2)墙体类型、砌筑高度:200厚(3)砂浆强度等级:预拌抹灰砂浆M5.
0","砂浆制作、运输、砌砖、砌块、勾缝、材料运输","m3","1475.
084","712.
660625","1051233.
36","""2","010402001002","砌块墙","(1)砌块品种、规格、强度等级:蒸压加气混凝土砌块390*190*90A5.
0(2)墙体类型、砌筑高度:100厚(3)砂浆强度等级:预拌抹灰砂浆M5.
0","砂浆制作、运输、砌砖、砌块、勾缝、材料运输","m3","204.
416","761.
020625","155564.
66","""3","010405001001","砌筑超高增加费","(1)超高高度:大于3.
6m","人工二次搬运砖、砂浆","m3","54.
703","18.
15","992.
860625","""4","010401012001","零星砌砖","(1)零星砌砖名称、部位:屋面砖砌踏步300*200mm","","m3","0.
009","761.
110625","6.
8500048828125","""5","010607005001","砌块墙钢丝网加固","(1)材料品种、规格:内墙面中不同墙体交接处在水泥砂浆面层中沿接缝处压入200mm宽通长耐碱玻纤网,玻纤网格布尺寸不得大于8mm*8mm,单位面积重量不小于160g/m2","铺贴、铆固","m2","3611.
707","11.
100009765625","40089.
95","""6","010607005002","砌块墙钢丝网加固","(1)材料品种、规格:楼梯间与人流通道的填充墙,应采用钢丝网砂浆面层加固.
,钢丝网规格为φ1@10*10","铺贴、铆固","m2","2645.
653","21.
41001953125","56643.
43","""7","010402001003","砌块墙","(1)烟囱耐火砖(2)砌块品种、规格、强度等级:耐火砖","砂浆制作、运输、砌砖、砌块、勾缝、材料运输","m3","47.
724","2000.
30125","95462.
32","""混凝土工程"分项工程(17房屋建筑与装饰)""8","010502001001","矩形柱","(1)混凝土种类(商品混凝土、现场拌制,泵送、非泵送):泵送商","混凝土制作、运输、浇筑、振捣、养护","m3","503.
6553125","642.
9703125","323835.
06","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第2页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""品混凝土(2)混凝土强度等级:C30""9","010502003001","异形柱","(1)柱形状:异形柱(2)混凝土种类(商品混凝土、现场拌制,泵送、非泵送):泵送商品混凝土(3)混凝土强度等级:C30","混凝土制作、运输、浇筑、振捣、养护","m3","20.
928","644.
5203125","13488.
51","""10","010502001002","矩形柱","(1)混凝土种类(商品混凝土、现场拌制,泵送、非泵送):泵送商品混凝土(2)混凝土强度等级:C25","混凝土制作、运输、浇筑、振捣、养护","m3","199.
96515625","623.
8603125","124750.
16","""11","010502003002","异形柱","(1)柱形状:异形柱(2)混凝土种类(商品混凝土、现场拌制,泵送、非泵送):泵送商品混凝土(3)混凝土强度等级:C25","混凝土制作、运输、浇筑、振捣、养护","m3","23.
942","625.
3903125","14973.
09","""12","010502001003","矩形柱","(1)梯柱(2)混凝土种类(商品混凝土、现场拌制,泵送、非泵送):泵送商品混凝土(3)混凝土强度等级:C25","混凝土制作、运输、浇筑、振捣、养护","m3","4.
872","623.
8603125","3039.
4525","""13","010505001001","有梁板","(1)混凝土种类(商品混凝土、现场拌制,泵送、非泵送):泵送商品混凝土(2)混凝土强度等级:C25(3)柱梁交接砼级差综合考虑","混凝土制作、运输、浇筑、振捣、养护","m3","2492.
184","609.
9703125","1520157.
47","""14","010505001002","有梁板","(1)混凝土种类(商品混凝土、现场拌制,泵送、非泵送):泵送商品混凝土(2)混凝土强度等级:C25P6(3)柱梁交接砼级差综合考虑","混凝土制作、运输、浇筑、振捣、养护","m3","222.
718","616.
08","137212.
11","""15","010503002001","矩形梁","(1)单梁(2)混凝土种类(商品混凝土、现","混凝土制作、运输、浇筑、振捣、","m3","1.
608","616.
6303125","991.
540625","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第3页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""场拌制,泵送、非泵送):泵送商品混凝土(3)混凝土强度等级:C25","养护""16","010508001001","后浇带","(1)有梁板后浇带(2)混凝土种类(商品混凝土、现场拌制,泵送、非泵送):非泵送商品砼(3)混凝土强度等级:C30","混凝土制作、运输、浇筑、振捣、养护及混凝土交接面、钢筋等的清理","m3","36.
063","669.
100625","24129.
75","""17","010506001001","直形楼梯","(1)两跑(2)混凝土种类(商品混凝土、现场拌制,泵送、非泵送):泵送商品混凝土(3)混凝土强度等级:C25(4)楼梯类型(板式、梁式):板式(5)梯板厚度(不含梯阶):150mm","混凝土制作、运输、浇筑、振捣、养护","m2","449.
2803125","184.
31015625","82806.
8","""18","010502002001","构造柱","(1)混凝土种类(商品混凝土、现场拌制,泵送、非泵送):非泵送商品混凝土(2)混凝土强度等级:C20","混凝土制作、运输、浇筑、振捣、养护","m3","90.
775078125","815.
570625","74033.
37","""19","010503004001","圈梁","(1)混凝土种类(商品混凝土、现场拌制,泵送、非泵送):非泵送商品混凝土(2)混凝土强度等级:C20","混凝土制作、运输、浇筑、振捣、养护","m3","67.
402","820.
600625","55310.
12","""20","010503005001","过梁","(1)混凝土种类(商品混凝土、现场拌制,泵送、非泵送):非泵送商品混凝土(2)混凝土强度等级:C20","混凝土制作、运输、浇筑、振捣、养护","m3","10.
741","824.
370625","8854.
565","""21","010507005001","压顶","(1)混凝土种类(商品混凝土、现场拌制,泵送、非泵送):非泵送商品混凝土(2)混凝土强度等级:C20","混凝土制作、运输、浇筑、振捣、养护","m3","10.
489","776.
230625","8141.
885","""22","010504001001","直形墙","(1)混凝土种类(商品混凝土、现场拌制,泵送、非泵送):泵送商","混凝土制作、运输、浇筑、振捣、养护","m3","13.
730009765625","596.
7303125","8193.
105","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第4页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""品混凝土(2)混凝土强度等级:C20(3)地梁面或地下室顶板面至一楼地面之间墙体及室内地面低于室外地坪或者底部侧墙为挡土墙时,且高差≤600mm时,周边墙体用素混凝土浇筑""23","010505006001","栏板","(1)混凝土种类(商品混凝土、现场拌制,泵送、非泵送):泵送商品混凝土(2)混凝土强度等级:C20","混凝土制作、运输、浇筑、振捣、养护","m3","114.
863","639.
8603125","73496.
24","""24","010505008001","雨篷、悬挑板、阳台板","(1)混凝土种类(商品混凝土、现场拌制,泵送、非泵送):非泵送商品混凝土(2)混凝土强度等级:C20","混凝土制作、运输、浇筑、振捣、养护","m3","2.
3","695.
960625","1600.
71125","""25","010505003001","平板","(1)挑板(2)混凝土种类(商品混凝土、现场拌制,泵送、非泵送):非泵送商品混凝土(3)混凝土强度等级:C20","混凝土制作、运输、浇筑、振捣、养护","m3","32.
516","597.
6303125","19432.
54","""26","010507007001","其他构件","(1)外墙线条(2)混凝土种类(商品混凝土、现场拌制,泵送、非泵送):非泵送商品混凝土(3)混凝土强度等级:C20","混凝土制作、运输、浇筑、振捣、养护","m3","4.
066","839.
530625","3413.
5325","""屋面工程"分项工程(17房屋建筑与装饰)""27","010902001001","屋面卷材防水","(1)屋面卷材防水(2)卷材品种、规格、厚度:3+3厚双层SBS改性沥青防水卷材(3)聚酯胎","基层处理、刷底油、铺油毡卷材、接缝","m2","4510.
532","91.
200078125","411360.
52","""28","011101003001","细石混凝土楼地面","(1)找平层厚度、砂浆配合比:40厚C20细石混凝土保护层","基层清理、抹找平层、面层铺设、材料运输","m2","4283.
258","40.
23","172315.
47","""29","010515003001","钢筋网片","(1)钢筋种类、规格:内配φ4@200*200钢筋","钢筋网制作、运输、钢筋网安装、焊接(绑扎","t","4.
229","6674.
59","28226.
84","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第5页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价","""30","011001001001","保温隔热屋面","(1)屋面保温层(2)保温隔热材料品种、规格、厚度:80厚挤塑苯板","基层清理、刷粘结材料、铺粘保温层、铺、刷(喷)防护材料","m2","4283.
258","53.
5100390625","229197.
14","""31","011001001002","保温隔热屋面","(1)屋面保温层(2)保温隔热材料品种、规格、厚度:60厚挤塑苯板","基层清理、刷粘结材料、铺粘保温层、铺、刷(喷)防护材料","m2","125","34.
63","4328.
75","""32","011003001001","隔离层","(1)隔离层部位:隔离层11J930-屋8/J8(2)隔离层材料品种:10mm厚1:3水泥砂浆","基层清理、刷油、煮沥青、胶泥调制、隔离层铺设","m2","4283.
258","21.
48001953125","92004.
38","""33","011101006001","平面砂浆找平层","(1)11J930-屋8/J8(2)找平层厚度、砂浆配合比:20厚1:3水泥砂浆找平层","基层清理、抹找平层、材料运输","m2","4283.
258","26.
61001953125","113977.
5","""34","010404001001","垫层","(1)垫层材料种类、配合比、厚度:最薄处30厚LC5.
0轻集料混凝土2%找坡层","垫层材料的拌制、垫层铺设、材料运输","m3","598.
408","589.
7603125","352917.
1","""35","AB001","屋面泛水","(1)屋面泛水(2)详11J930-J20","","m","909.
094","20.
180009765625","18345.
53","""36","040504009001","雨水口","(1)屋面雨水口(2)详11J930-1.
3/J25","垫层铺筑、模板制作、安装、拆除、混凝土拌和、运输、浇筑、养护、砌筑、勾缝、抹面、雨水箅子安装、钢筋制作安装、脚手架搭拆","个","23","100","2300","""37","AB002","屋面分格缝","(1)屋面分格缝(2)详11J930-J23,纵横缝间距≤6M","","m","1427.
753","16.
590009765625","23686.
42","""38","AB003","水簸箕","(1)水簸箕(2)11J930-D/J27","","个","5","118.
470078125","592.
3503125","""39","010902009001","铁爬梯","(1)屋面检修梯(2)钢材种类:详02J401-TWWa-48/79","铁爬梯制作、运输、安装","步","56","51.
6300390625","2891.
2825","""钢筋工程"分项工程(17房屋建筑与装饰)""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第6页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价","""40","010515001001","现浇构件钢筋","(1)钢筋种类、规格:圆钢筋制作安装Φ6","钢筋制作、运输、钢筋安装、焊接(绑扎)","t","7.
625","6268.
11","47794.
34","""41","010515001002","现浇构件钢筋","(1)钢筋种类、规格:圆钢筋制作安装Φ8","钢筋制作、运输、钢筋安装、焊接(绑扎)","t","7.
625","6211.
465","47362.
38","""42","010515001003","现浇构件钢筋","(1)钢筋种类、规格:Ⅲ级钢筋制作安装Ф6","钢筋制作、运输、钢筋安装、焊接(绑扎)","t","7.
625","6305.
61","48080.
28","""43","010515001004","现浇构件钢筋","(1)钢筋种类、规格:Ⅲ级钢筋制作安装Ф8","钢筋制作、运输、钢筋安装、焊接(绑扎)","t","15.
25","6004.
805","91573.
2","""44","010515001005","现浇构件钢筋","(1)钢筋种类、规格:Ⅲ级钢筋制作安装Ф10","钢筋制作、运输、钢筋安装、焊接(绑扎)","t","38.
125","5977.
725","227900.
58","""45","010515001006","现浇构件钢筋","(1)钢筋种类、规格:III级钢筋制作安装Φ12","钢筋制作、运输、钢筋安装、焊接(绑扎)","t","38.
125","5741.
145","218880.
96","""46","010515001007","现浇构件钢筋","(1)钢筋种类、规格:III级钢筋制作安装Φ14","钢筋制作、运输、钢筋安装、焊接(绑扎)","t","305","5584.
29","1703208.
45","""47","010515001008","现浇构件钢筋","(1)钢筋种类、规格:III级钢筋制作安装Φ16","钢筋制作、运输、钢筋安装、焊接(绑扎)","t","114.
375","5540.
025","633639.
79","""48","010515001009","现浇构件钢筋","(1)钢筋种类、规格:III级钢筋制作安装Φ18","钢筋制作、运输、钢筋安装、焊接(绑扎)","t","38.
125","5540.
025","211213.
26","""49","010515001010","现浇构件钢筋","(1)钢筋种类、规格:Ⅲ级钢筋制作安装Φ20","钢筋制作、运输、钢筋安装、焊接(绑扎)","t","38.
125","5239.
0425","199738.
4","""50","010515001011","现浇构件钢筋","(1)钢筋种类、规格:Ⅲ级钢筋制作安装Φ22","钢筋制作、运输、钢筋安装、焊接(绑扎)","t","38.
125","5239.
0425","199738.
4","""51","010515001012","现浇构件钢筋","(1)钢筋种类、规格:Ⅲ级钢筋制作安装Φ25","钢筋制作、运输、钢筋安装、焊接(绑扎)","t","38.
125","5239.
0425","199738.
4","""52","010515001013","现浇构件钢筋","(1)钢筋种类、规格:Ⅲ级钢筋制作安装Φ28","钢筋制作、运输、钢筋安装、焊接(绑扎)","t","38.
125","5080.
7025","193701.
69","""53","010515001014","现浇构件钢筋","(1)钢筋种类、规格:Ⅲ级钢筋制作安装Φ32","钢筋制作、运输、钢筋安装、焊接","t","38.
125","5080.
7025","193701.
69","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第7页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""绑扎)"54","010515009001","支撑钢筋(铁马)","(1)支撑钢筋(铁马)Ⅲ级钢筋制作安装","钢筋制作、焊接、安装","t","8.
6000048828125","5239.
0425","45055.
74","""","","分部小计"771.
100625",,"4261327.
56","""55","010516006001","电渣压力焊接","(1)规格:电渣压力焊接φ≤18","焊接、清理","个","7796","5.
7300048828125","44671.
08","""56","010516006002","电渣压力焊接","(1)规格:电渣压力焊接φ≤32","焊接、清理","个","6676","6.
8800048828125","45930.
92","""57","010516003001","机械连接","(1)连接方式:钢筋直螺纹连接(φ22)","钢筋套丝、套筒连接","个","206","15.
830009765625","3260.
9825","""58","010516003002","机械连接","(1)连接方式:钢筋直螺纹连接(φ25)","钢筋套丝、套筒连接","个","236","16.
070009765625","3792.
5225","""59","010516003003","机械连接","(1)连接方式:钢筋直螺纹连接(φ28)","钢筋套丝、套筒连接","个","236","18.
5","4366","""60","010516003004","机械连接","(1)连接方式:钢筋直螺纹连接(φ32)","钢筋套丝、套筒连接","个","191","19.
730009765625","3768.
4325","""厨房卫生间防水"分项工程(17房屋建筑与装饰)""61","010904002001","楼(地)面涂膜防水","(1)卫生间厨房及阳台(2)防水膜品种:1.
5厚聚合物防水涂料","基层处理、刷基层处理剂、铺布、喷涂防水层","m2","520.
446","17.
08","8889.
22","""62","010903002001","墙面涂膜防水","(1)卫生间厨房及阳台(2)防水膜品种:1.
5厚聚合物防水涂料","基层处理、刷基层处理剂、铺布、喷涂防水层","m2","1621.
70125","18.
930009765625","30698.
78","""63","010904002002","楼(地)面涂膜防水","(1)市场超市防水(2)防水膜品种:1.
5厚聚合物防水涂料","基层处理、刷基层处理剂、铺布、喷涂防水层","m2","5752.
048","17.
08","98244.
98","""64","040309010001","防水层","(1)卫生间,厨房,阳台天棚防水(2)1.
5厚聚合物防水涂料","防水层铺涂","m2","520.
446","17.
08","8889.
22","""65","010903002002","墙面涂膜防水","(1)市场超市防水(2)防水膜品种:1.
5厚聚合物防水涂料","基层处理、刷基层处理剂、铺布、喷涂防水层","m2","789.
971","18.
930009765625","14954.
15","""其他一般土建工程"分项工程(17房屋建筑与装饰)""66","010902005001","屋面排(透)气管","(1)卫生间排气道(2)排(透)气管品种、规格:详16J916-1第10页C-W2-6","排(透)气管及配件安装、固定、铁件制作、安装、接缝、嵌缝、刷漆","m","283.
9","82.
350078125","23379.
17","""67","010902005002","屋面排(透)气管","(1)厨房排气道","排(透)气","m","212.
20015625","61.
8400390625","13122.
45","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第8页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""2)排(透)气管品种、规格:详16J916-1第7页C-C-6","管及配件安装、固定、铁件制作、安装、接缝、嵌缝、刷漆""68","010507003001","电缆沟、地沟、明暗沟","(1)混凝土明暗沟(2)C20混凝土(3)混凝土盖板300*500","挖填、运土石方、铺设垫层、混凝土制作、运输、浇筑、振捣、养护、刷防护材料","m","308.
4","501.
2403125","154582.
42","""69","040201022001","排水沟、截水沟","(1)砖砌暗沟(2)(12J003-11/A3、a/A2)(3)混凝土盖板200*300","模板制作、安装、拆除、基础、垫层铺筑、混凝土拌和、运输、浇筑、侧墙浇捣或砌筑、勾缝、抹面、盖板制作、安装","m","108.
203","163.
220078125","17660.
89","""门窗工程"分项工程(17房屋建筑与装饰)""70","010807001001","金属(塑钢、断桥)窗","(1)框、扇材质:铝合金平开窗(2)玻璃品种、厚度:5高透光单银low-E+12空气+5透明玻璃(3)含五金","窗安装、五金、玻璃安装","m2","643.
9003125","671.
030625","432076.
22","""71","010807001002","金属(塑钢、断桥)窗","(1)框、扇材质:铝合金推拉窗(2)玻璃品种、厚度:5高透光单银low-E+12空气+5透明玻璃(3)含五金","窗安装、五金、玻璃安装","m2","105","495.
8403125","52063.
24","""72","010807001003","金属(塑钢、断桥)窗","(1)框、扇材质:铝合金固定窗(2)玻璃品种、厚度:5高透光单银low-E+12空气+5透明玻璃(3)含五金","窗安装、五金、玻璃安装","m2","309.
812","448.
9103125","139077.
7","""73","010802001001","金属(塑钢)门","(1)框、扇材质:铝合金平开门(2)玻璃品种、厚度:5高透光单银low-E+12空气+5透明玻璃(3)含五金","门安装、五金安装、玻璃安装","m2","209.
52015625","715.
540625","149919.
94","""74","010802001002","金属(塑钢)门","(1)框、扇材质:铝合金推拉门(2)玻璃品种、厚","门安装、五金安装、玻璃安装","m2","241.
92015625","566.
5203125","137052.
52","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第9页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""度:5高透光单银low-E+12空气+5透明玻璃(3)含五金""75","010802004001","防盗门","(1)门框、扇材质:钢质防盗门(2)含五金","门安装、五金安装","m2","190.
09015625","776.
180625","147544.
06","""76","010802003001","钢质防火门","(1)门框、扇材质:甲级防火门(2)含五金配件(3)参图集12j609","门安装、五金安装、玻璃安装","m2","58.
6100390625","522.
58","30628.
41","""77","010802003002","钢质防火门","(1)门框、扇材质:乙级防火门(2)含五金配件(3)参图集12j609","门安装、五金安装、玻璃安装","m2","87.
300078125","506.
4003125","44208.
72","""78","010802003003","钢质防火门","(1)门框、扇材质:丙级钢质防火门(2)含五金配件(3)参图集12j609","门安装、五金安装、玻璃安装","m2","11.
610009765625","498.
3403125","5785.
73","""79","010801001001","木质门","(1)夹板门(2)门锁、门碰(3)木门刷底油、调和漆二遍磁漆一遍","门安装、玻璃安装、五金安装","m2","390.
0603125","1190.
710625","464448.
34","""80","010807003001","金属百叶窗","(1)框、扇材质:成品铝合金百叶窗","窗安装、五金安装","m2","93.
080078125","499.
3803125","46482.
29","""81","010803002001","防火卷帘(闸)门","(1)防火卷帘(闸)门","门运输、安装、启动装置、活动小门、五金安装","m2","489.
9003125","474.
6803125","232545.
73","""楼地面工程"分项工程(17房屋建筑与装饰)""82","010501001001","垫层","(1)一层地面垫层(2)混凝土种类(商品混凝土、现场拌制,泵送、非泵送):非泵送商品混凝土(3)混凝土强度等级:60厚C15混凝土垫层","混凝土制作、运输、浇筑、振捣、养护","m3","251.
223","396.
0603125","99499.
38","""83","011102003001","块料楼地面","(1)前室、门厅、电梯厅(2)11J930-地13/G6(3)面层材料品种、规格、颜色:800*800防滑砖地面(4)结合层厚度、砂浆配合比:20厚1:3干硬性水泥砂浆结合层,表面撒水泥粉(5)嵌缝材料种类","基层清理、抹结合层、面层铺设、磨边、嵌缝、刷防护材料、酸洗、打蜡、材料运输","m2","360.
697","160.
45","57873.
83","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第10页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""水泥浆一道(内掺建筑胶)"84","011102003002","块料楼地面","(1)公厕(2)11J930-地16/G7(3)面层材料品种、规格、颜色:800*800防滑砖地面(4)结合层厚度、砂浆配合比:20厚1:3干硬性水泥砂浆结合层,表面撒水泥粉(5)嵌缝材料种类:水泥浆一道(内掺建筑胶)","基层清理、抹结合层、面层铺设、磨边、嵌缝、刷防护材料、酸洗、打蜡、材料运输","m2","44.
643","160.
45","7162.
97","""85","011101001001","水泥砂浆楼地面","(1)物业管理用房、管理用房、电子商务代收服务点等房间(2)11J930-楼1/G2(3)找平层厚度、砂浆配合比:20厚1:2.
5水泥砂浆抹光(4)素水泥浆遍数:水泥浆一道(内掺建筑胶)","基层清理、抹找平层、抹面层、材料运输","m2","682.
228","32.
44001953125","22131.
48","""86","011101001002","水泥砂浆楼地面","(1)市场超市等(2)11J930-楼4/G3(3)找平层厚度、砂浆配合比:20厚1:2.
5水泥砂浆抹光(4)素水泥浆遍数:水泥浆一道(内掺建筑胶)","基层清理、抹找平层、抹面层、材料运输","m2","3099.
485","32.
44001953125","100547.
29","""87","011101003002","细石混凝土楼地面","(1)市场超市等(2)11J930-楼4/G3(3)找平层厚度、砂浆配合比:最薄处30厚C20细石混凝土找坡层抹平","基层清理、抹找平层、面层铺设、材料运输","m2","3099.
485","32.
62","101105.
2","""88","011104004001","防静电活动地板","(1)消防控制室(2)支架高度、材料种类:250高(3)面层材料品种、规格、颜色:防静电活动地板(4)防护材料种类:20厚水泥砂浆,表面找平(5)素水泥浆一道","基层清理、固定支架安装、活动面层安装、刷防护材料、材料运输","m2","57.
109","370.
2603125","21145.
18","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第11页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价","""89","011102003003","块料楼地面","(1)前室、门厅、电梯厅(2)11J930-地13/G6(3)面层材料品种、规格、颜色:800*800防滑砖地面(4)结合层厚度、砂浆配合比:20厚1:3干硬性水泥砂浆结合层,表面撒水泥粉(5)嵌缝材料种类:水泥浆一道(内掺建筑胶)","基层清理、抹结合层、面层铺设、磨边、嵌缝、刷防护材料、酸洗、打蜡、材料运输","m2","115.
026","160.
45","18455.
92","""90","011101001003","水泥砂浆楼地面","(1)楼梯间等(2)11J930-楼1/G2(3)找平层厚度、砂浆配合比:20厚1:2.
5水泥砂浆抹光(4)素水泥浆遍数:水泥浆一道(内掺建筑胶)","基层清理、抹找平层、抹面层、材料运输","m2","227.
932","32.
44001953125","7394.
11","""91","011101001004","水泥砂浆楼地面","(1)客厅,卧室,餐厅,书房、(起居室)(2)11J930-楼1/G2(3)找平层厚度、砂浆配合比:20厚1:2.
5水泥砂浆抹光(4)素水泥浆遍数:水泥浆一道(内掺建筑胶)","基层清理、抹找平层、抹面层、材料运输","m2","2240.
77125","32.
44001953125","72690.
58","""92","011101001005","水泥砂浆楼地面","(1)市场超市等(2)11J930-楼4/G3(3)找平层厚度、砂浆配合比:20厚1:2.
5水泥砂浆抹光(4)素水泥浆遍数:水泥浆一道(内掺建筑胶)","基层清理、抹找平层、抹面层、材料运输","m2","5752.
048","32.
44001953125","186596.
44","""93","011101003003","细石混凝土楼地面","(1)市场超市等(2)11J930-楼4/G3(3)找平层厚度、砂浆配合比:最薄处30厚C20细石混凝土找坡层抹平","基层清理、抹找平层、面层铺设、材料运输","m2","5752.
048","32.
62","187631.
81","""94","011101001006","水泥砂浆楼地面","(1)厨房、阳台(2)11J930-楼4/G","基层清理、抹找平层、","m2","275.
044","32.
44001953125","8922.
43","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第12页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""3(3)找平层厚度、砂浆配合比:20厚1:2.
5水泥砂浆抹光(4)素水泥浆遍数:水泥浆一道(内掺建筑胶)","抹面层、材料运输""95","011101001007","水泥砂浆楼地面","(1)住宅卫生间(2)11J930-楼4/G3(3)找平层厚度、砂浆配合比:15厚1:2.
5水泥砂浆抹光(4)素水泥浆遍数:水泥浆一道(内掺建筑胶)","基层清理、抹找平层、抹面层、材料运输","m2","200.
76015625","29.
98001953125","6018.
785","""96","011101003004","细石混凝土楼地面","(1)住宅卫生间、厨房、阳台(2)11J930-楼4/G3(3)找平层厚度、砂浆配合比:最薄处30厚C20细石混凝土找坡层抹平","基层清理、抹找平层、面层铺设、材料运输","m2","475.
804","32.
62","15520.
73","""97","011101001008","水泥砂浆楼地面","(1)风井、电井、电梯机房等(2)11J930-楼1/G2(3)找平层厚度、砂浆配合比:20厚1:2.
5水泥砂浆抹光(4)素水泥浆遍数:水泥浆一道(内掺建筑胶)","基层清理、抹找平层、抹面层、材料运输","m2","374.
846","32.
44001953125","12160","""98","011106004001","水泥砂浆楼梯面层","(1)楼梯面层(2)11J930-楼1/G2(3)找平层厚度、砂浆配合比:20厚1:2.
5水泥砂浆面层","基层清理、抹找平层、抹面层、抹防滑条、材料运输","m2","287.
304","115.
910078125","33301.
41","""99","011105003001","块料踢脚线","(1)前室、门厅、电梯厅(2)详11J930-4/H27(3)踢脚线高度:150高玻化砖踢脚","基层清理、底层抹灰、面层铺贴、磨边、擦缝、磨光、酸洗、打蜡、刷防护材料、材料运输","m2","11.
189","212.
06015625","2372.
74","""100","011105001001","水泥砂浆踢脚线","(1)除前室、门厅、电梯厅其他房间踢脚(2)详11J930-1/H","基层清理、底层和面层抹灰、材料运输","m2","224.
404","114.
5","25694.
26","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第13页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""27(3)踢脚线高度:150高水泥砂浆踢脚线""101","AB004","楼梯防滑条","(1)楼梯踏步防滑条(2)详15J403-E6","","m","270.
171","23.
49001953125","6346.
325","""内墙柱面工程"分项工程(17房屋建筑与装饰)""102","011204003001","块料墙面","(1)前室、门厅、电梯厅(2)详11J930-内墙37/H12(3)1:1彩色水泥细砂砂浆(白水泥擦缝)或专用勾缝剂勾缝(4)5~7厚面砖(800*400玻化砖墙面)(5)5厚1:2建筑胶水泥砂浆(或专用胶)粘接层","基层清理、砂浆制作、运输、粘结层铺贴、面层安装、嵌缝、刷防护材料、磨光、酸洗、打蜡","m2","313.
986","166.
77015625","52363.
45","""103","011201004001","立面砂浆找平层","(1)前室、门厅、电梯厅(2)详11J930-内墙37/H12(3)6厚1:0.
5:2.
5水泥石灰膏打底扫毛或划出纹道(4)8厚1:1:6水泥石灰膏砂浆打底扫毛或划出纹道(5)3厚外加剂专用砂浆抹基面刮糙或界面剂一道甩毛","基层清理、刷界面剂、砂浆制作、运输、抹平找平","m2","313.
986","50.
5800390625","15881.
41","""104","011201004002","立面砂浆找平层","(1)市场、超市、电井、水井、设备平台、设备平台、报警阀间、雨淋阀、电梯机房(2)详11J930-内墙11/H5(3)5厚1:2.
5水泥砂浆抹平(4)8厚1:1:6水泥石灰膏砂浆打底扫毛或划出纹道(5)3厚外加剂专用砂浆抹基面刮糙或界面剂一道甩毛","基层清理、刷界面剂、砂浆制作、运输、抹平找平","m2","4573.
459","33.
93001953125","155177.
46","""105","011201004003","立面砂浆找平层","(1)物业管理用房、管理用房、电子商务代收服务点、消防控制室","基层清理、刷界面剂、砂浆制作、运输、抹平","m2","4651.
153","49.
9300390625","232232.
07","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第14页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""楼梯间、卸货区等(2)详11J930-内墙15/H6(3)6厚1:0.
5:2.
5水泥石灰膏打底扫毛或划出纹道(4)8厚1:1:6水泥石灰膏砂浆打底扫毛或划出纹道(5)3厚外加剂专用砂浆抹基面刮糙或界面剂一道甩毛","找平""106","011407001001","墙面喷刷涂料","(1)基层类型:物业管理用房、管理用房、电子商务代收服务点、消防控制室、楼梯间、卸货区等(2)喷刷涂料部位:详11J930-内墙15/H6(3)腻子种类:水泥漆墙面","基层清理、刮腻子、刷、喷涂料","m2","4651.
153","35.
89001953125","166929.
88","""107","011204003002","块料墙面","(1)公厕(2)详11J930-内墙44/H14(3)1:1彩色水泥细砂砂浆(白水泥擦缝)或专用勾缝剂勾缝(4)5~7厚面砖(800*400玻化砖墙面)(5)5厚1:2建筑胶水泥砂浆(或专用胶)粘接层","基层清理、砂浆制作、运输、粘结层铺贴、面层安装、嵌缝、刷防护材料、磨光、酸洗、打蜡","m2","889.
345625","166.
77015625","148316.
07","""108","011201004004","立面砂浆找平层","(1)公厕(2)详11J930-内墙44/H14(3)8厚1:0.
5:2.
5水泥石灰膏砂浆内挂金属网一层将砂浆压入网孔,分层压实抹平(4)6厚1:1:6水泥石灰膏砂浆打底扫毛或划出纹道(5)3厚外加剂专用砂浆抹基面刮糙或界面剂一道甩毛","基层清理、刷界面剂、砂浆制作、运输、抹平找平","m2","889.
345625","66.
01","58705.
66","""109","011201004005","立面砂浆找平层","(1)客厅,卧室,餐厅,书房宅、卫生间,阳台,厨房【户内】(2)详11J930-内","基层清理、刷界面剂、砂浆制作、运输、抹平找平","m2","7732.
77","54.
1400390625","418652.
17","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第15页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""墙15/H6(3)素水泥浆一道(内掺建筑胶)(4)5厚1:0.
5:2.
5水泥石灰膏打底扫毛或划出纹道(5)8厚1:1:6水泥石灰膏砂浆打底扫毛或划出纹道(6)3厚外加剂专用砂浆抹基面刮糙或界面剂一道甩毛""110","011201004006","立面砂浆找平层","(1)配电用房间、空调机房(2)详11J930-内墙15/H6(3)5厚1:0.
5:2.
5水泥石灰膏打底扫毛或划出纹道(4)8厚1:1:6水泥石灰膏砂浆打底扫毛或划出纹道(5)3厚外加剂专用砂浆抹基面刮糙或界面剂一道甩毛","基层清理、刷界面剂、砂浆制作、运输、抹平找平","m2","199.
16015625","49.
9300390625","9944.
065","""111","011406003001","满刮腻子","(1)配电用房间、空调机房(2)详11J930-内墙15/H6(3)2厚面层耐水腻子分遍刮平","基层清理、刮腻子","m2","199.
16015625","23.
66001953125","4712.
1325","""外墙面工程"分项工程(17房屋建筑与装饰)""112","011201001001","墙面一般抹灰","(1)墙体类型:外墙面抹灰(2)界面剂类型:专用界面剂(3)20厚1:3水泥砂浆打底","基层清理、砂浆制作、运输、刷界面剂、底层抹灰、抹面层、抹装饰面、勾分格缝","m2","6379.
29","43.
1200390625","275074.
98","""113","011407001002","墙面喷刷涂料","(1)喷刷涂料部位:外墙真石漆(2)涂料品种、喷刷遍数:刷底漆、真石漆、罩面漆(3)满刮腻子两遍","基层清理、刮腻子、刷、喷涂料","m2","2948.
646","111.
040078125","327417.
65","""114","011204001001","石材墙面","(1)墙体类型:干挂石材墙(2)安装方式:干挂(3)面层材料品种、规格、颜色:30厚米黄色花岗岩","基层清理、砂浆制作、运输、粘结层铺贴、面层安装、嵌缝、刷防护材料、磨光、酸洗、打蜡","m2","3430.
644","548.
3","1881022.
11","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第16页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价","""115","011204004001","干挂石材钢骨架","(1)骨架种类、规格:L50*50*5横向镀锌角钢、竖向[10槽钢","骨架制作、运输、安装、刷漆","t","68","9866.
83","670944.
44","""116","010516002001","预埋铁件","(1)钢材种类:φ12螺纹钢、10厚镀锌钢板","螺栓、铁件制作、运输、螺栓、铁件安装","t","10.
840009765625","10199.
01","110557.
27","""117","010516005001","化学螺栓","(1)化学螺栓种类:M12*160定型化学螺栓","钻孔、清孔、安装锚栓","个","3268","22.
31001953125","72909.
08","""118","011201001002","墙面一般抹灰","(1)墙体类型:屋面栏板内侧(2)界面剂类型:20厚1:3水泥砂浆打底","基层清理、砂浆制作、运输、刷界面剂、底层抹灰、抹面层、抹装饰面、勾分格缝","m2","801.
115625","68.
0200390625","54491.
88","""天棚工程"分项工程(17房屋建筑与装饰)""119","011302001001","天棚吊顶","(1)前室,门厅,电梯厅(2)参11J930-顶13-H26(3)轻钢龙骨纸面石膏板吊顶(4)龙骨间距600mm*600mm(5)面刷乳胶漆(一底两面)","基层清理、吊杆安装、龙骨安装、基层板铺贴、面层铺贴、嵌缝、刷防护材料","m2","225.
953","134.
77","30451.
69","""120","011301001001","天棚抹灰","(1)物业管理用房、管理用房、电子商务代收服务点、公厕、消防控制室、楼梯间、卸货区等(2)11J930-顶1/H23(3)5厚1:0.
5:3水泥石灰膏砂浆打底(4)3~5厚低基防裂腻子分遍找平(5)2厚面层耐水腻子刮平","基层清理、底层抹灰、抹面层","m2","1203.
549","40.
55","48803.
91","""121","011407002001","天棚喷刷涂料","(1)物业管理用房、管理用房、电子商务代收服务点、公厕、消防控制室、楼梯间、卸货区等(2)11J930-顶1/H23(3)天棚(4)2厚面层耐水腻子刮平(5)水泥漆","基层清理、刮腻子、刷、喷涂料","m2","1203.
549","37.
05","44591.
49","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第17页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价","""122","011301001002","天棚抹灰","(1)客厅,卧室,餐厅,书房宅、卫生间,阳台,厨房【户内】(2)11J930-顶1/H23(3)5厚1:0.
5:3水泥石灰膏砂浆打底","基层清理、底层抹灰、抹面层","m2","2702.
063","33.
52","90573.
15","""123","011406003002","满刮腻子","(1)客厅,卧室,餐厅,书房宅、卫生间,阳台,厨房【户内】(2)钢筋混凝土板底满刮腻子二道顶棚","基层清理、刮腻子","m2","2702.
063","25.
78001953125","69659.
18","""124","011406003003","满刮腻子","(1)市场、超市、电视电信机房、配电用房间、空调机房(2)钢筋混凝土板底满刮腻子二道顶棚","基层清理、刮腻子","m2","12685.
047","25.
78001953125","327020.
51","""125","011406003004","满刮腻子","(1)客厅,卧室,餐厅,书房宅、卫生间,阳台,厨房【户内】(2)钢筋混凝土板底满刮腻子二道顶棚","基层清理、刮腻子","m2","2297.
338","25.
78001953125","59225.
37","""126","011406003005","满刮腻子","(1)电井,水井,设备平台报警阀间,雨淋阀间","基层清理、刮腻子","m2","69.
042","15.
480009765625","1068.
770625","""其他装饰工程"分项工程(17房屋建筑与装饰)""127","010903004001","墙面变形缝","(1)外墙变形缝(2)做法详14J936,1、2/AQ3","清缝、填塞防水材料、止水带安装、盖缝制作、安装、刷防护材料","m","11.
600009765625","205.
67015625","2385.
77125","""128","010902008001","屋面变形缝","(1)屋面变形缝(2)做法详14J936,1A、2A/AW2","清缝、填塞防水材料、止水带安装、盖缝制作、安装、刷防护材料","m","4.
6","457.
9103125","2106.
39125","""129","AB005","空调孔","(1)空调孔","","个","108","100","10800","""","","【栏杆】"130","011503001001","金属扶手、栏杆、栏板","(1)楼梯栏杆(斜段)H=900详图集11J930-3/K5(2)扶手材料种类、规格:硬木扶手(3)栏杆材料种类、规格:φ42*2.
5","制作、运输、安装、刷防护材料","m","270.
171","459.
0803125","124030.
1","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第18页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""立柱G""131","011503001002","金属扶手、栏杆、栏板","(1)楼梯栏杆(直段)H=1100详图集11J930-3/K5(2)扶手材料种类、规格:硬木扶手(3)栏杆材料种类、规格:φ42*2.
5立柱G","制作、运输、安装、刷防护材料","m","16.
576","499.
1103125","8273.
25","""132","011503001003","金属扶手、栏杆、栏板","(1)护窗栏杆H=950详图集11J930-K12(2)扶手材料种类、规格:φ60*4钢管立柱@1200(3)栏板材料种类、规格、颜色:φ60*3钢管横杆(4)固定配件种类:20*1.
5钢管立柱@110","制作、运输、安装、刷防护材料","m","12.
800009765625","465.
3903125","5956.
99","""133","011503001004","金属扶手、栏杆、栏板","(1)护窗栏杆H=700详图集11J930-K12(2)扶手材料种类、规格:φ60*4钢管立柱@1200(3)栏板材料种类、规格、颜色:φ60*3钢管横杆(4)固定配件种类:20*1.
5钢管立柱@110","制作、运输、安装、刷防护材料","m","250.
20015625","405.
1603125","101371.
03","""134","011503001005","金属扶手、栏杆、栏板","(1)屋面平台栏杆H=1200详图集11J930-K12(2)扶手材料种类、规格:φ60*4钢管立柱@1200(3)栏板材料种类、规格、颜色:φ60*3钢管横杆(4)固定配件种类:20*1.
5钢管立柱@110","制作、运输、安装、刷防护材料","m","80.
8000390625","509.
6603125","41180.
53","""135","011503001006","金属扶手、栏杆、栏板","(1)阳台栏杆H=1200详图集11J930-K12(2)扶手材料种类、规格:φ60*4钢管立柱@1200(3)栏板材料种类、规格、颜色:φ60*3钢管横杆(4)固定配件种类:20*1.
5钢管立柱@110","制作、运输、安装、刷防护材料","m","204.
40015625","498.
3603125","101864.
78","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第19页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价","""136","011503001007","金属扶手、栏杆、栏板","(1)空调处栏杆H=600详图集11J930-K12(2)扶手材料种类、规格:φ60*4钢管立柱@1200(3)栏板材料种类、规格、颜色:φ60*3钢管横杆(4)固定配件种类:20*1.
5钢管立柱@110","制作、运输、安装、刷防护材料","m","59.
7000390625","385.
0203125","22985.
69","""137","011210005001","成品隔断","(1)卫生间防潮板隔断(2)高度2.
1m","隔断运输、安装、嵌缝、塞口","m2","144.
585078125","162.
130078125","23441.
57","""138","011210005002","成品隔断","(1)小便斗防潮板隔断(2)高度1.
2m","隔断运输、安装、嵌缝、塞口","m2","5.
7600048828125","133.
510078125","769.
020625","""139","011505001001","洗漱台","(1)公共卫生间洗漱台","台面及支架运输、安装、杆、环、盒、配件安装、刷油漆","m2","4.
14","495.
75","2052.
41125","""主楼安装"单位工程(17安装)""水卫工程"分项工程(17安装)""140","031001007001","复合管","(1)室内(钢塑复合管(螺纹连接)DN50(2)管道消毒、冲洗、水压试验DN50(3)管道、管件及管卡的安装","管道安装、管件安装、塑料卡固定、压力试验、吹扫、冲洗、警示带铺设","m","90","97.
720078125","8794.
8","""141","031001007002","复合管","(1)室内(钢塑复合管(螺纹连接)DN40(2)管道消毒、冲洗、水压试验DN40(3)管道、管件及管卡的安装","管道安装、管件安装、塑料卡固定、压力试验、吹扫、冲洗、警示带铺设","m","24","83.
780078125","2010.
72125","""142","031001007003","复合管","(1)室内(钢塑复合管(螺纹连接)DN32(2)管道消毒、冲洗、水压试验DN32(3)管道、管件及管卡的安装","管道安装、管件安装、塑料卡固定、压力试验、吹扫、冲洗、警示带铺设","m","73.
2000390625","89.
610078125","6559.
45","""143","031001007004","复合管","(1)室内(钢塑复合管(螺纹连接)DN20(2)管道消毒、冲洗、水压试验DN20(3)管道、管件及","管道安装、管件安装、塑料卡固定、压力试验、吹扫、冲洗、警示带铺设","m","12.
240009765625","49.
4400390625","605.
1503125","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第20页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""管卡的安装""144","031002001001","管道支架","(1)材质:型钢(2)管架形式:一般管道支架","制作、安装","kg","60.
314","19.
680009765625","1186.
980625","""145","031201003001","金属结构刷油","(1)除锈级别:轻锈(2)油漆品种:红丹防锈漆调和漆(3)结构类型:金属结构(4)涂刷遍数、漆膜厚度:各两遍","除锈、调配、涂刷","kg","60.
314","2.
33000122070312","140.
530078125","""146","031201001001","管道刷油","(1)油漆品种:调和漆、银粉漆(2)涂刷遍数、漆膜厚度:两遍","除锈、调配、涂刷","m2","31.
319","17.
320009765625","542.
45","""147","031001006001","塑料管","(1)室内塑料给水管(热熔连接)外径25mm以内(2)管道消毒、冲洗(公称直径20mm以内)(3)管道水压试验","管道安装、管件安装、塑料卡固定、阻火圈安装、压力试验、吹扫、冲洗、警示带铺设","m","809.
800625","36.
18001953125","29298.
58","""148","031002003001","套管","(1)名称、类型:穿楼板钢套管制作安装(2)材质:焊接钢管(3)规格:主管公称直径DN50(4)填料材质:水泥、石棉绒","制作、安装、除锈、刷油","个","30","42.
5","1275","""149","031002003002","套管","(1)名称、类型:穿楼板钢套管制作安装(2)材质:焊接钢管(3)规格:主管公称直径DN40(4)填料材质:水泥、石棉绒","制作、安装、除锈、刷油","个","8","42.
5","340","""150","031002003003","套管","(1)名称、类型:穿楼板钢套管制作安装(2)材质:焊接钢管(3)规格:主管公称直径DN32(4)填料材质:水泥、石棉绒","制作、安装、除锈、刷油","个","4","27.
83001953125","111.
320078125","""151","030413003001","打洞(孔)","(1)名称:预留孔洞(混凝土楼板)DN50","开孔、洞、恢复处理","个","30","8.
37","251.
10015625","""152","030413003002","打洞(孔)","(1)名称:预留孔洞(混凝土楼板","开孔、洞、恢复处理","个","8","8.
3900048828125","67.
1200390625","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第21页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""DN40""153","030413003003","打洞(孔)","(1)名称:预留孔洞(混凝土楼板)DN32","开孔、洞、恢复处理","个","4","8.
3900048828125","33.
56001953125","""154","031003001001","螺纹阀门","(1)类型:自动排气阀(2)规格、压力等级:DN25(P=1.
6MPa)(3)连接形式:螺纹连接","安装、电气接线、调试","个","4","184","736","""155","031003001002","螺纹阀门","(1)类型:铜质截止阀(2)规格、压力等级:DN32(P=1.
6MPa)(3)连接形式:螺纹连接","安装、电气接线、调试","个","44","111.
460078125","4904.
2425","""156","031003001003","螺纹阀门","(1)类型:铜质截止阀(2)规格、压力等级:DN25(P=1.
6MPa)(3)连接形式:螺纹连接","安装、电气接线、调试","个","4","48.
1800390625","192.
72015625","""157","031003001004","螺纹阀门","(1)类型:铜质截止阀(2)规格、压力等级:DN20(P=1.
6MPa)(3)连接形式:螺纹连接","安装、电气接线、调试","个","48","38.
55","1850.
40125","""158","031003001005","螺纹阀门","(1)类型:可调式减压阀(2)规格、压力等级:DN40(阀后压力0.
16MPa)(3)连接形式:螺纹连接","安装、电气接线、调试","个","20","84.
090078125","1681.
80125","""159","030113015001","过滤器","(1)类型:Y型过滤器(2)规格、压力等级:DN40(P=1.
6MPa)(3)连接形式:螺纹连接","本体安装、补刷(喷)油漆","台","20","155.
070078125","3101.
4025","""160","031004014001","给、排水附(配)件","(1)名称:嵌铜配件DN20","安装","个","60","3.
54000244140625","212.
40015625","""161","031004014002","给、排水附(配)件","(1)名称:水龙头安装DN20","安装","个","78","11.
570009765625","902.
460625","""162","030601002001","压力仪表","(1)名称:压力表(2)型号:型号为Y-100,表的量程为工作压力的2.
0-2.
5倍(3)压力表弯材质","本体安装、压力表弯制作、安装、挠性管安装、取源部件配合安装、","台","40","273.
72","10948.
81","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第22页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""规格:铜质(4)挠性管材质、规格:铜质(5)调试要求:符合规范及设计要求(6)脱脂要求:符合规范及设计要求","单体校验调整、脱脂、支架制作、安装""163","031001005001","铸铁管","(1)安装部位:室内(2)介质:排水(3)材质、规格:柔性铸铁排水管DN100(4)连接形式:法兰连接(5)压力试验及吹、洗设计要求:通水及通球试验","管道安装、管件安装、压力试验、吹扫、冲洗、警示带铺设","m","28","285.
64015625","7997.
925","""164","031001006002","塑料管","(1)安装部位:室内(2)介质:排水(3)材质、规格:UPVC硬塑料排水管De110(4)连接形式:粘接(5)压力试验及吹、洗设计要求:通水及通球试验","管道安装、管件安装、塑料卡固定、阻火圈安装、压力试验、吹扫、冲洗、警示带铺设","m","884.
096","70.
3400390625","62187.
31","""165","031001006003","塑料管","(1)安装部位:室内(2)介质:排水(3)材质、规格:PP聚丙烯静音排水管DN100(4)连接形式:粘接(5)压力试验及吹、洗设计要求:通水及通球试验","管道安装、管件安装、塑料卡固定、阻火圈安装、压力试验、吹扫、冲洗、警示带铺设","m","663.
072","70.
3400390625","46640.
52","""166","031001006004","塑料管","(1)安装部位:室内(2)介质:排水(3)材质、规格:UPVC塑料排水管De110(4)连接形式:粘接(5)压力试验及吹、洗设计要求:通水及通球试验","管道安装、管件安装、塑料卡固定、阻火圈安装、压力试验、吹扫、冲洗、警示带铺设","m","296.
43015625","70.
3400390625","20850.
89","""167","031001006005","塑料管","(1)安装部位:室内(2)介质:排水(3)材质、规格:UPVC塑料排水管D","管道安装、管件安装、塑料卡固定、阻火圈安装、压力试","m","617.
8","37.
65001953125","23260.
17","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第23页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""e50(4)连接形式:粘接(5)压力试验及吹、洗设计要求:通水及通球试验","验、吹扫、冲洗、警示带铺设""168","031002003004","套管","(1)名称、类型:穿楼板钢套管制作安装(2)材质:焊接钢管(3)规格:主管公称直径DN100(4)填料材质:水泥、石棉绒","制作、安装、除锈、刷油","个","420","101.
210078125","42508.
2","""169","031002003005","套管","(1)名称、类型:穿墙钢套管制作安装(2)材质:焊接钢管(3)规格:主管公称直径DN100(4)填料材质:水泥、石棉绒","制作、安装、除锈、刷油","个","2","99.
630078125","199.
26015625","""170","031002003006","套管","(1)名称、类型:穿墙钢套管制作安装(2)材质:焊接钢管(3)规格:主管公称直径DN150(4)填料材质:水泥、石棉绒","制作、安装、除锈、刷油","个","12","1089.
980625","13079.
77","""171","031002003007","套管","(1)名称、类型:刚性防水套管制作安装(2)材质:普通钢板(3)规格:主管公称直径DN100","制作、安装、除锈、刷油","个","28","350.
6803125","9819.
04","""172","031004014003","给、排水附(配)件","(1)名称:阻火圈安装(公称直径100mm以内)","安装","个","420","40.
29001953125","16921.
81","""173","031004014004","给、排水附(配)件","(1)地面扫除口安装DN100(2)预留孔洞(混凝土楼板)DN100","安装","个","12","38.
93001953125","467.
1603125","""174","031004014005","给、排水附(配)件","(1)地漏安装(公称直径50mm以内带存水弯)P弯(2)预留孔洞(混凝土楼板公称直径50mm以内)","安装","个","254","49.
8000390625","12649.
21","""175","031004014006","给、排水附(配)件","(1)地漏安装(公称直径50mm以内带存水弯)S弯(2)预留孔洞(混","安装","个","108","49.
8000390625","5378.
405","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第24页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""凝土楼板)DN50""176","031004014007","给、排水附(配)件","(1)名称:底部异径弯头DN150","安装","个","12","70.
71","848.
520625","""177","031004014008","给、排水附(配)件","(1)名称:CHT旋流接头DN100","安装","个","168","121.
340078125","20385.
13","""178","031004014009","给、排水附(配)件","(1)名称:S4S稳流接头DN100","安装","个","12","161.
790078125","1941.
48125","""179","030413003004","打洞(孔)","(1)名称:预留孔洞(混凝土楼板)DN100","开孔、洞、恢复处理","个","420","12.
770009765625","5363.
405","""180","030413003005","打洞(孔)","(1)预留孔洞(混凝土楼板)DN150","开孔、洞、恢复处理","个","12","16.
540009765625","198.
48015625","""181","030413003006","打洞(孔)","(1)预留孔洞(混凝土楼板)DN100","开孔、洞、恢复处理","个","2","12.
770009765625","25.
54001953125","""182","030413003007","打洞(孔)","(1)预留孔洞(混凝土楼板)DN100(大便器预留洞)","开孔、洞、恢复处理","个","156","12.
770009765625","1992.
12125","""183","030413003008","打洞(孔)","(1)预留孔洞(混凝土楼板)DN50(洗脸盆预留洞)","开孔、洞、恢复处理","个","156","8.
37","1305.
720625","""184","030413003009","打洞(孔)","(1)预留孔洞(混凝土楼板)DN50(洗涤槽)","开孔、洞、恢复处理","个","78","8.
37","652.
8603125","""185","010101007001","管沟土方","(1)土壤类别:三类土(2)管外径:DN200以内(3)挖沟深度:平均1米(4)回填要求:利用适合的原土回填","排地表水、土方开挖、围护(挡土板)、支撑、运输、回填","m","106.
310078125","99.
010078125","10525.
75","""186","010101007002","管沟土方","(1)土壤类别:三类土(2)管外径:DN100以内(3)挖沟深度:平均1米(4)回填要求:利用适合的原土回填","排地表水、土方开挖、围护(挡土板)、支撑、运输、回填","m","125.
480078125","86.
650078125","10872.
85","""187","031201001002","管道刷油","(1)油漆品种:沥青漆(2)涂刷遍数、漆膜厚度:两道","除锈、调配、涂刷","m2","10.
027","39.
37","394.
7603125","""188","031001006006","塑料管","(1)安装部位:室内(2)介质:空调排水(3)材质、规格:PVC-U塑料排水管De50(4)连接形式:粘接(5)压力试验及吹","管道安装、管件安装、塑料卡固定、阻火圈安装、压力试验、吹扫、冲洗、警示带铺设","m","585","37.
65001953125","22025.
25","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第25页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""洗设计要求:通水及通球试验""189","031001006007","塑料管","(1)安装部位:室内(2)介质:空调排水(3)材质、规格:PVC-U塑料排水管De25(4)连接形式:粘接(5)压力试验及吹、洗设计要求:通水及通球试验","管道安装、管件安装、塑料卡固定、阻火圈安装、压力试验、吹扫、冲洗、警示带铺设","m","74.
4","37.
65001953125","2801.
1625","""190","031002003008","套管","(1)名称、类型:穿楼板钢套管制作安装(2)材质:焊接钢管(3)规格:主管公称直径DN50(4)填料材质:水泥、石棉绒","制作、安装、除锈、刷油","个","180","42.
5","7650","""191","030413003010","打洞(孔)","(1)预留孔洞(混凝土楼板)DN50","开孔、洞、恢复处理","个","180","8.
37","1506.
60125","""192","031004014010","给、排水附(配)件","(1)钢丝网DN50","安装","个","15","1.
01000061035156","15.
150009765625","""电气工程"分项工程(17安装)""193","030404017001","配电箱","(1)名称:成套配电箱01AM1(2)安装方式:挂墙明装","本体安装、基础型钢制作、安装、焊、压接线端子、补刷(喷)油漆、接地","台","1","8326.
05","8326.
05","""194","030404017002","配电箱","(1)名称:成套配电箱01AM2(2)安装方式:挂墙明装","本体安装、基础型钢制作、安装、焊、压接线端子、补刷(喷)油漆、接地","台","1","8326.
05","8326.
05","""195","030404017003","配电箱","(1)名称:成套配电箱01AM3(2)安装方式:挂墙明装","本体安装、基础型钢制作、安装、焊、压接线端子、补刷(喷)油漆、接地","台","1","8326.
05","8326.
05","""196","030404017004","配电箱","(1)名称:成套配电箱01AM3(2)安装方式:挂墙明装","本体安装、基础型钢制作、安装、焊、压接线端子、补刷(喷)油漆、接地","台","1","8326.
05","8326.
05","""197","030404017005","配电箱","(1)规格:ALa","本体安装、","台","39","1278.
970625","49879.
83","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第26页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""2)名称:配电箱(3)安装方式:嵌入式(4)接线端子:焊铜接线端子WDZD-BYJ-16","基础型钢制作、安装、焊、压接线端子、补刷(喷)油漆、接地""198","030404017006","配电箱","(1)名称:成套配电箱7APdt(2)安装方式:挂墙明装","本体安装、基础型钢制作、安装、焊、压接线端子、补刷(喷)油漆、接地","台","4","3670.
3025","14681.
21","""199","030411003001","桥架","(1)名称:钢制桥架(2)规格:MR-400*100(3)接地要求:防腐接地","本体安装、接地","m","101.
010078125","169.
06015625","17076.
75","""200","030411003002","桥架","(1)名称:钢制桥架(2)规格:MR-(75+75)*100(3)接地要求:防腐接地","本体安装、接地","m","82.
560078125","89.
320078125","7374.
265","""201","030413001001","铁构件","(1)名称:桥架支撑架制作安装(2)材质:型钢(3)防腐、刷油","制作、安装、补刷(喷)油漆","kg","80.
404","14.
910009765625","1198.
820625","""202","080807013001","防火堵洞(隔板)","(1)电缆防火设施安装(防火隔板安装)","封堵、清理、运输","m2","15.
210009765625","200.
93015625","3056.
1525","""203","080807013002","孔洞封堵","(1)防火圈、防火包安装(阻火包安装)(2)防火堵料(电缆密封填料墙体5根以下电缆)","封堵、清理、运输","kg","338","3.
34000244140625","1128.
920625","""204","030408001001","电力电缆","(1)名称:铜芯电力电缆敷设(2)型号:WDZBN-YJY(3)规格:4*2.
5(4)敷设方式、部位:桥架(5)电压等级(kV):0.
6/1KV","电缆敷设、揭(盖)盖板","m","55.
1700390625","22.
18001953125","1223.
670625","""205","030408006001","电力电缆头","(1)名称:铜芯电力电缆头制作安装(2)型号:WDZC-YJY(3)规格:4*2.
5(4)安装部位:箱内(5)电压等级(kV):0.
6/1KV","电力电缆头头制作、电缆电缆头安装、接地","个","4","142.
970078125","571.
8803125","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第27页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价","""206","030408001002","电力电缆","(1)名称:铜芯电力电缆敷设(2)型号:WDZC-YJY(3)规格:4*70+1*35(4)敷设方式、部位:桥架(5)电压等级(kV):0.
6/1KV","电缆敷设、揭(盖)盖板","m","218.
12015625","234.
72015625","51197.
13","""207","030408006002","电力电缆头","(1)名称:铜芯电力电缆头制作安装(2)型号:WDZC-YJY(3)规格:4*70+1*35(4)安装部位:箱内(5)电压等级(kV):0.
6/1KV","电力电缆头头制作、电缆电缆头安装、接地","个","16","288.
81015625","4620.
9625","""208","030408001003","电力电缆","(1)规格:WDZC-YJY-4*50+1*25(2)名称:室内铜芯电力电缆","电缆敷设、揭(盖)盖板","m","14.
560009765625","150.
740078125","2194.
77125","""209","030408006003","电力电缆头","(1)名称:铜芯电力电缆头制作安装(2)型号:WDZC-YJY(3)规格:4*50+1*25(4)安装部位:箱内(5)电压等级(kV):0.
6/1KV","电力电缆头头制作、电缆电缆头安装、接地","个","4","288.
81015625","1155.
240625","""210","030408001004","电力电缆","(1)名称:矿物绝缘电力电缆敷设(2)型号:RTTW(3)规格:5*10(4)敷设方式、部位:桥架(5)电压等级(kV):0.
6/1KV","电缆敷设、揭(盖)盖板","m","59.
8500390625","132.
690078125","7941.
5","""211","030408006004","电力电缆头","(1)名称:矿物绝缘电力电缆头制作安装(2)型号:RTTW(3)规格:5*10(4)安装部位:箱内(5)电压等级(kV):0.
6/1KV","电力电缆头头制作、电缆电缆头安装、接地","个","16","142.
95","2287.
2","""212","030408001005","电力电缆","(1)名称:矿物绝缘电力电缆敷设(2)型号:RTTW(3)规格:5*4","电缆敷设、揭(盖)盖板","m","93.
690078125","98.
680078125","9245.
33","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第28页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""4)敷设方式、部位:桥架(5)电压等级(kV):0.
6/1KV""213","030408006005","电力电缆头","(1)名称:矿物绝缘电力电缆头制作安装(2)型号:RTTW(3)规格:5*4(4)安装部位:箱内(5)电压等级(kV):0.
6/1KV","电力电缆头头制作、电缆电缆头安装、接地","个","8","142.
95","1143.
6","""214","030408001006","电力电缆","(1)名称:矿物绝缘电力电缆敷设(2)型号:RTTW(3)规格:5*6(4)敷设方式、部位:桥架(5)电压等级(kV):0.
6/1KV","电缆敷设、揭(盖)盖板","m","25.
22001953125","112.
670078125","2841.
5425","""215","030408006006","电力电缆头","(1)名称:矿物绝缘电力电缆头制作安装(2)型号:RTTW(3)规格:5*6(4)安装部位:箱内(5)电压等级(kV):0.
6/1KV","电力电缆头头制作、电缆电缆头安装、接地","个","8","142.
95","1143.
6","""216","030408001007","电力电缆","(1)名称:矿物绝缘电力电缆头制作安装(2)型号:RTTW(3)规格:4*35+1*16(4)安装部位:箱内(5)电压等级(kV):0.
6/1KV","电缆敷设、揭(盖)盖板","m","174.
24015625","233.
11015625","40617.
09","""217","030408006007","电力电缆头","(1)名称:矿物绝缘电力电缆头制作安装(2)型号:RTTW(3)规格:4*35+1*16(4)安装部位:箱内(5)电压等级(kV):0.
6/1KV","电力电缆头头制作、电缆电缆头安装、接地","个","8","142.
95","1143.
6","""218","030408001008","电力电缆","(1)名称:矿物绝缘电力电缆头制作安装(2)型号:RTTW(3)规格:4*35+1*16(4)安装部位:箱","电缆敷设、揭(盖)盖板","m","260.
36015625","234.
21015625","60978.
92","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第29页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""内(5)电压等级(kV):0.
6/1KV""219","030408006008","电力电缆头","(1)名称:矿物绝缘电力电缆头制作安装(2)型号:RTTW(3)规格:4*35+1*16(4)安装部位:箱内(5)电压等级(kV):0.
6/1KV","电力电缆头头制作、电缆电缆头安装、接地","个","8","210.
26015625","1682.
08125","""220","030411001001","配管","(1)规格:SC100(2)名称:钢管(3)接地要求:刷油防腐接地(4)配置形式:砖、混凝土结构暗配","电线管路敷设、钢索架设(拉紧装置安装)、预留沟槽、.
接地","m","7.
4000048828125","101.
320078125","749.
770625","""221","030411001002","配管","(1)规格:SC50(2)名称:钢管(3)接地要求:砖、混凝土结构暗配(4)配置形式:刷油防腐接地","电线管路敷设、钢索架设(拉紧装置安装)、预留沟槽、.
接地","m","17.
980009765625","46.
1400390625","829.
600625","""222","030411001003","配管","(1)规格:SC25(2)名称:钢管(3)接地要求:砖、混凝土结构暗配(4)配置形式:刷油防腐接地","电线管路敷设、钢索架设(拉紧装置安装)、预留沟槽、.
接地","m","733.
220625","23.
90001953125","17523.
97","""223","030411001004","配管","(1)规格:SC20(2)名称:钢管(3)接地要求:砖、混凝土结构暗配(4)配置形式:刷油防腐接地","电线管路敷设、钢索架设(拉紧装置安装)、预留沟槽、.
接地","m","1730.
66125","18.
820009765625","32571.
02","""224","030411001005","配管","(1)规格:SC15(2)名称:钢管(3)接地要求:砖、混凝土结构暗配(4)配置形式:刷油防腐接地","电线管路敷设、钢索架设(拉紧装置安装)、预留沟槽、.
接地","m","946.
520625","16","15144.
33","""225","030411001006","配管","(1)规格:PC16(2)名称:塑料管(3)接地要求:砖、混凝土结构暗配","电线管路敷设、钢索架设(拉紧装置安装)、预留沟槽、.
接地","m","3418.
2225","9.
28","31721.
08","""226","030411004001","配线","(1)规格:WDZD-BYJ-10(2)名称:线槽配线","配线、钢索架设(拉紧装置安装)、支持体(夹板、","m","28.
20001953125","8.
3500048828125","235.
47015625","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第30页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""绝缘子、槽板等)安装""227","030411004002","配线","(1)规格:WDZD-BYJ-16(2)名称:线槽配线","配线、钢索架设(拉紧装置安装)、支持体(夹板、绝缘子、槽板等)安装","m","140.
880078125","12.
25","1725.
78125","""228","030411004003","配线","(1)规格:WDZD-BYJ-16(2)名称:穿动力线","配线、钢索架设(拉紧装置安装)、支持体(夹板、绝缘子、槽板等)安装","m","2822.
8225","12.
080009765625","34099.
67","""229","030411004004","配线","(1)规格:WDZD-BYJ-10(2)名称:穿动力线","配线、钢索架设(拉紧装置安装)、支持体(夹板、绝缘子、槽板等)安装","m","6","8.
1900048828125","49.
1400390625","""230","030411004005","配线","(1)规格:WDZD-BYJ-2.
5(2)名称:穿照明线","配线、钢索架设(拉紧装置安装)、支持体(夹板、绝缘子、槽板等)安装","m","637.
44","3.
44000244140625","2192.
79125","""231","030411004006","配线","(1)规格:WDZN-BYJ-2.
5(2)名称:穿照明线","配线、钢索架设(拉紧装置安装)、支持体(夹板、绝缘子、槽板等)安装","m","9193.
585","4.
16000244140625","38245.
29","""232","030411004007","配线","(1)规格:BV-2.
5(2)名称:穿照明线","配线、钢索架设(拉紧装置安装)、支持体(夹板、绝缘子、槽板等)安装","m","1627.
08125","3.
29000244140625","5353.
09","""233","030404035001","插座","(1)规格:250V/10A(2)名称:安全型二、三极插座","插座安装、接线","个","30","23.
62001953125","708.
600625","""234","030404035002","插座","(1)规格:250V/10A(2)名称:底坑插座","插座安装、接线","个","8","23.
62001953125","188.
96015625","""235","030411006001","接线盒","(1)名称:接线盒安装(暗装开关(插座)盒)","本体安装","个","38","7.
6800048828125","291.
84","""236","030412005001","荧光灯","(1)名称:应急单管荧光灯(2)型号:1*35W(1*28W)","本体安装","套","28","160.
460078125","4492.
8825","""237","030412005002","荧光灯","(1)名称:应急双管荧光灯","本体安装","套","2","191.
09015625","382.
1803125","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第31页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""2)型号:2*35W(2*28W)"238","030412001001","普通灯具","(1)类型:22W(2)名称:节能灯","本体安装","套","36","99.
550078125","3583.
8025","""239","030412004001","装饰灯","(1)名称:安全出口灯(2)型号:5W","本体安装","套","52","121.
960078125","6341.
925","""240","030412004002","装饰灯","(1)名称:疏散指示灯(2)规格:5W","本体安装","套","112","117.
690078125","13181.
29","""241","030412001002","普通灯具","(1)名称:井道应急壁灯(2)型号:5W","本体安装","套","32","80.
5800390625","2578.
56125","""242","030412001003","普通灯具","(1)类型:24W(2)名称:胶木螺口灯座","本体安装","套","78","40.
72001953125","3176.
1625","""243","030412004003","装饰灯","(1)名称:LED吸顶灯(带应急端口)(2)型号:10W","本体安装","套","268","159.
380078125","42713.
84","""244","030411006002","接线盒","(1)名称:接线盒安装(接线盒暗装难燃聚氯乙烯暗装灯头盒)","本体安装","个","608","6.
8300048828125","4152.
64","""245","030404034001","照明开关","(1)规格:250V/10A(2)名称:单联单控开关(带夜灯)","插座安装、接线","个","160","21.
38001953125","3420.
8025","""246","030404034002","照明开关","(1)规格:250V/10A(2)名称:单联双控开关","插座安装、接线","个","8","22.
70001953125","181.
60015625","""247","030404034003","照明开关","(1)规格:250V/10A(2)名称:双触电感应开关(带消防线)","插座安装、接线","个","242","44.
9800390625","10885.
17","""248","030404034004","照明开关","(1)名称:残疾人开关","插座安装、接线","个","2","21.
78001953125","43.
5600390625","""249","030411006003","接线盒","(1)名称:接线盒安装(接线盒暗装难燃聚氯乙烯暗装开关盒)","本体安装","个","412","7.
7400048828125","3188.
8825","""250","030904003001","按钮","(1)名称:出门按钮","安装、校接线、编码、调试","个","2","17.
180009765625","34.
36001953125","""251","030411001007","配管","(1)名称:金属软管敷设(内径≤25mm每根长≤0.
5m)","电线管路敷设、钢索架设(拉紧装置安装)、预留沟槽、.
接地","m","6","71.
0200390625","426.
1203125","""252","030411006004","接线盒","(1)接线盒安装(暗装接线盒)","本体安装","个","10","11.
010009765625","110.
100078125","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第32页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""2)普通开关、按钮安装(空白面板安装)"253","030411006005","接线盒","(1)名称:排气扇接线盒","本体安装","个","4","7.
4700048828125","29.
88001953125","""254","030414002001","送配电装置系统","(1)名称:输配电装置系统调试(≤1kV交流供电)","系统调试","系统","4","320.
21","1280.
84","""255","030409005001","避雷网","(1)避雷网安装Φ12圆钢沿混凝土块敷设","避雷网制作、安装、跨接、混凝土块制作、补刷(喷)油漆","m","415.
4303125","41.
1300390625","17086.
65","""256","030409003001","避雷引下线","(1)避雷引下线敷设(利用建筑结构钢筋引下)","避雷引下线制作、安装、断接卡子、箱制作、安装、接地测试点安装、利用主钢筋焊接、补刷(喷)油漆","m","3094.
4625","12.
75","39454.
37","""257","030409004001","均压环","(1)避雷网安装(均压环敷设利用圈梁钢筋)(2)避雷网安装(柱钢筋与圈梁钢筋焊接)(3)接地跨接线安装(钢制、铝制窗接地)","均压环敷设、钢铝窗接地、柱主筋与圈梁焊接、利用圈梁钢筋焊接、补刷(喷)油漆","m","166.
38015625","311.
56015625","51837.
35","""258","030409012001","利用底板钢筋网等电位联焊","(1)避雷网安装(卫生间等电位均压环安装)","利用底板钢筋网焊接、补刷(喷)油漆","m2","859.
630625","21.
81001953125","18748.
53","""259","030411001008","配管","(1)名称:砖、混凝土结构暗配(外径≤16mm)","电线管路敷设、钢索架设(拉紧装置安装)、预留沟槽、.
接地","m","1032.
460625","9.
28","9581.
23","""260","030411004008","配线","(1)名称:绝缘导线(2)配线形式:管内穿线(3)型号:BVR-4","配线、钢索架设(拉紧装置安装)、支持体(夹板、绝缘子、槽板等)安装","m","941.
460625","3.
42000244140625","3219.
7925","""261","030411004009","配线","(1)名称:绝缘导线(2)配线形式:管内穿线(3)型号:BVR-6","配线、钢索架设(拉紧装置安装)、支持体(夹板、绝缘子、槽板等)安装","m","91","4.
61","419.
5103125","""262","030411006006","接线盒","(1)名称:接线盒安装(暗装接线盒)","本体安装","个","208","7.
4700048828125","1553.
76125","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第33页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价","""263","030409002001","接地母线","(1)接地母线敷设(户内接地母线敷设)","接地母线制作、安装、补刷(喷)油漆","m","106.
800078125","22.
52001953125","2405.
14125","""264","030411001009","配管","(1)名称:砖、混凝土结构暗配(外径≤32mm)","电线管路敷设、钢索架设(拉紧装置安装)、预留沟槽、.
接地","m","101.
200078125","14.
990009765625","1516.
99125","""265","030411004010","配线","(1)名称:绝缘导线(2)配线形式:管内穿线(3)型号:BV-35","配线、钢索架设(拉紧装置安装)、支持体(夹板、绝缘子、槽板等)安装","m","101.
200078125","20.
01","2025.
01125","""266","030409008001","等电位端子箱、测试板","(1)等电位装置安装(等电位端子盒安装)","本体安装","台/块","182","53.
5100390625","9738.
825","""267","030414011001","接地装置","(1)名称:接地系统测试(接地网)","接地电阻测试","系统","1","959.
660625","959.
660625","""消防电工程"分项工程(17安装)""268","030411003003","桥架","(1)规格:MR-(100+50+50)*100(2)名称:钢制桥架安装(3)接地要求:刷油防腐接地","本体安装、接地","m","138.
900078125","92.
5","12848.
25","""269","030413001002","铁构件","(1)名称:桥架支撑架制作安装(2)材质:型钢(3)防腐、刷油","制作、安装、补刷(喷)油漆","kg","60.
838","16.
700009765625","1015.
990625","""270","030411001010","配管","(1)规格:SC20(2)名称:钢管(3)接地要求:刷油防腐接地(4)配置形式:砖、混凝土结构暗配","电线管路敷设、钢索架设(拉紧装置安装)、预留沟槽、.
接地","m","945.
890625","18.
820009765625","17801.
65","""271","030411001011","配管","(1)规格:SC15(2)名称:钢管(3)接地要求:刷油防腐接地(4)配置形式:砖、混凝土结构暗配","电线管路敷设、钢索架设(拉紧装置安装)、预留沟槽、.
接地","m","143.
98","16","2303.
68","""272","030411001012","配管","(1)名称:金属软管敷设(内径≤16mm每根长≤0.
5m)","电线管路敷设、钢索架设(拉紧装置安装)、预留沟槽、.
接地","m","26","49.
9400390625","1298.
440625","""273","030411006007","接线盒","(1)名称:接线盒+GB(2)材质:钢质(3)安装形式:暗装","本体安装","个","52","11.
010009765625","572.
5203125","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第34页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价","""274","030904008001","模块(模块箱)","(1)名称:单输入模块","安装、校接线、编码、调试","个/台","4","349.
6103125","1398.
44125","""275","030904008002","模块(模块箱)","(1)名称:单输入单输出模块","安装、校接线、编码、调试","个/台","8","417.
9703125","3343.
7625","""276","030904005001","声光报警器","(1)名称:声光报警器(2)安装方式:墙面安装","安装、校接线、编码、调试","个","26","191.
07015625","4967.
8225","""277","030904003002","按钮","(1)名称:手动报警按钮(2)安装方式:墙面安装","安装、校接线、编码、调试","个","30","151.
740078125","4552.
2025","""278","030904007001","消防广播(扬声器)","(1)名称:消防广播(扬声器)安装(扬声器吸顶式(3W-5W))","安装、校接线、编码、调试","个","52","108.
440078125","5638.
885","""279","030904003003","按钮","(1)名称:按钮安装(消火栓报警按钮)(2)安装方式:墙面安装","安装、校接线、编码、调试","个","48","314.
71","15106.
09","""280","030904008003","模块(模块箱)","(1)总线隔离器","安装、校接线、编码、调试","个/台","30","320.
5","9615","""281","030904001001","点型探测器","(1)名称:智能感烟探测器(含通用底座)","底座安装、探头安装、校接线、编码、探测器调试","个","145","101.
920078125","14778.
41","""282","030904015001","火灾报警控制微机(CRT)","(1)消防显示器","安装、调试","台","2","4312.
0125","8624.
025","""283","030411005001","接线箱","(1)名称:消防接线箱","本体安装","个","27","287.
76015625","7769.
525","""284","080609004001","模块","(1)名称:门禁模块","安装、调试、连接、运输","台","4","214.
08015625","856.
320625","""285","030411004011","配线","(1)名称:电气配线(2)型号:ZBN-BV(3)规格:2.
5mm2(4)材质:铜芯(5)配线部位:管内","配线、钢索架设(拉紧装置安装)、支持体(夹板、绝缘子、槽板等)安装","m","551.
6603125","3.
86000244140625","2129.
41125","""286","030411004012","配线","(1)名称:消防电话通讯线(2)型号:ZBN-RVVP(3)规格:2*1.
0mm2(4)材质:铜芯(5)配线部位:管内","配线、钢索架设(拉紧装置安装)、支持体(夹板、绝缘子、槽板等)安装","m","120.
260078125","4.
11","494.
2703125","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第35页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价","""287","030411004013","配线","(1)名称:消防广播线(2)型号:ZBN-RVVP(3)规格:2*1.
5mm2(4)材质:铜芯(5)配线部位:管内","配线、钢索架设(拉紧装置安装)、支持体(夹板、绝缘子、槽板等)安装","m","275.
76015625","5.
2000048828125","1433.
95125","""288","030411004014","配线","(1)名称:穿多芯软导线(2)规格:ZBN-RVS-2*1","配线、钢索架设(拉紧装置安装)、支持体(夹板、绝缘子、槽板等)安装","m","741.
140625","2.
91000244140625","2156.
72","""289","030411004015","配线","(1)名称:穿多芯软导线(2)规格:ZCN-RVS-2.
5","配线、钢索架设(拉紧装置安装)、支持体(夹板、绝缘子、槽板等)安装","m","45.
3300390625","4.
41000244140625","199.
91015625","""290","030411004016","配线","(1)名称:穿照明线(2)规格:WDZN-BYJ-2.
5","配线、钢索架设(拉紧装置安装)、支持体(夹板、绝缘子、槽板等)安装","m","141.
42","4.
16000244140625","588.
31","""291","030411004017","配线","(1)名称:电气配线(2)型号:ZBN-BV(3)规格:2.
5mm2(4)材质:铜芯(5)配线部位:槽内","配线、钢索架设(拉紧装置安装)、支持体(夹板、绝缘子、槽板等)安装","m","273.
72","3.
40000244140625","930.
650625","""292","030411004018","配线","(1)名称:电气配线(2)型号:ZBN-RVS(3)规格:2*1.
0mm2(4)材质:铜芯(5)配线部位:槽内","配线、钢索架设(拉紧装置安装)、支持体(夹板、绝缘子、槽板等)安装","m","105.
760078125","2.
75","290.
84","""293","030411004019","配线","(1)名称:电气配线(2)型号:ZBN-RVVP(3)规格:2*1.
0mm2(4)材质:铜芯(5)配线部位:槽内","配线、钢索架设(拉紧装置安装)、支持体(夹板、绝缘子、槽板等)安装","m","387","3.
77000244140625","1458.
99125","""294","030411004020","配线","(1)名称:消防广播线(2)型号:ZBN-RVVP(3)规格:2*1.
5mm2","配线、钢索架设(拉紧装置安装)、支持体(夹板、绝缘子、槽板等)安装","m","110.
650078125","4.
82000244140625","533.
33","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第36页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""4)材质:铜芯(5)配线部位:槽内""295","030408002001","控制电缆","(1)名称:控制电缆敷设(2)型号:ZBN-KVV(3)规格:12*1.
5(4)材质:铜质(5)电压等级(kV):0.
6/1kV","电缆敷设、揭(盖)盖板","m","166.
56015625","16.
530009765625","2753.
2425","""296","030408002002","控制电缆","(1)名称:控制电缆敷设(2)型号:ZBN-KVV(3)规格:8*1.
5(4)材质:铜质(5)电压等级(kV):0.
6/1kV","电缆敷设、揭(盖)盖板","m","3.
31000244140625","16.
530009765625","54.
7100390625","""297","030904006001","消防报警电话插孔(电话)","(1)名称:消防电话分机(2)安装方式:墙面安装","安装、校接线、编码、调试","个/部","8","100.
110078125","800.
880625","""298","030411006008","接线盒","(1)名称:接线盒(2)材质:钢制(3)规格:86H50(4)安装形式:暗装","本体安装","个","304","7.
4700048828125","2270.
88125","""299","闽030705013001","消防控制装置","(1)消防控制装置接线(正压送风阀排烟阀防火阀)(2)接线采用金属软管保护","","台","27","36.
97001953125","998.
190625","""300","闽030705013002","消防控制装置","(1)消防控制装置接线消防设施电控箱(2)接线采用金属软管保护","","台","3","35.
07001953125","105.
210078125","""301","030905003001","防火控制装置调试","(1)名称:防火控制装置调试(消防电梯调试)","调试","个","2","1156.
460625","2312.
92125","""302","030905003002","防火控制装置调试","(1)名称:防火控制装置调试(一般客用电梯调试)","调试","个","2","1087.
950625","2175.
90125","""303","030905001001","自动报警系统调试","(1)自动报警系统调试(512点以内)","系统调试","系统","1","23214.
04","23214.
04","""防火门系统"分项工程(17安装)""304","030411006009","接线盒","(1)名称:接线盒(2)材质:钢制(3)规格:86H50(4)安装形式:暗装","本体安装","个","72","7.
4700048828125","537.
8403125","""305","030411001013","配管","(1)规格:SC20(2)名称:钢管(3)接地要求:砖、混凝土结构暗配","电线管路敷设、钢索架设(拉紧装置安装)、预留沟槽、.
接地","m","8.
5600048828125","18.
820009765625","161.
100078125","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第37页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""4)配置形式:刷油防腐接地""306","030411001014","配管","(1)规格:SC25(2)名称:钢管(3)接地要求:砖、混凝土结构暗配(4)配置形式:刷油防腐接地","电线管路敷设、钢索架设(拉紧装置安装)、预留沟槽、.
接地","m","225.
92015625","23.
90001953125","5399.
49","""307","030411001015","配管","(1)名称:金属软管敷设(内径≤20mm每根长≤0.
5m)","电线管路敷设、钢索架设(拉紧装置安装)、预留沟槽、.
接地","m","39","59.
3000390625","2312.
7","""308","030411004021","配线","(1)名称:电气配线(2)型号:WDZN-BYJ(3)规格:2.
5mm2(4)材质:铜芯(5)配线部位:管内","配线、钢索架设(拉紧装置安装)、支持体(夹板、绝缘子、槽板等)安装","m","468.
9603125","4.
16000244140625","1950.
87125","""309","030411004022","配线","(1)名称:电气配线(2)型号:WDZN-BYJ(3)规格:2.
5mm2(4)材质:铜芯(5)配线部位:槽内","配线、钢索架设(拉紧装置安装)、支持体(夹板、绝缘子、槽板等)安装","m","9.
72","23.
95001953125","232.
79015625","""310","030411004023","配线","(1)名称:电气配线(2)型号:WDZN-RVS(3)规格:2*2.
5mm2(4)材质:铜芯(5)配线部位:管内","配线、钢索架设(拉紧装置安装)、支持体(夹板、绝缘子、槽板等)安装","m","234.
48015625","5.
04000244140625","1181.
780625","""311","030411004024","配线","(1)名称:电气配线(2)型号:WDZN-RVS(3)规格:2*2.
5mm2(4)材质:铜芯(5)配线部位:槽内","配线、钢索架设(拉紧装置安装)、支持体(夹板、绝缘子、槽板等)安装","m","4.
86","4.
53000244140625","22.
02001953125","""312","080609004002","模块","(1)名称:出入口执行机构设备(自动闭门器)","安装、调试、连接、运输","台","52","36.
55","1900.
60125","""313","080609004003","模块","(1)名称:常开防火门场监控器模块","安装、调试、连接、运输","台","26","464.
8103125","12085.
06","""314","030507001001","入侵探测设备","(1)名称:防火门门磁开关(用于","本体安装、单体调试","套","26","423.
8903125","11021.
14","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第38页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""常闭防火门监视,内置通讯模块具有门磁开关功能)"315","030507007001","出入口执行机构设备","(1)名称:防火门电动闭门器(2)用于常开防火门监视及控制,内置通讯模块,具有门磁开关电磁释放器机械闭门器功能","本体安装、单体调试","台","52","510.
3803125","26539.
78","""316","031101077001","监控设备","(1)名称:防火门监控分机(2)用于显示并控制防火门开启,关闭状态","安装、调测","部","1","2320.
40125","2320.
40125","""317","030905003003","防火控制装置调试","(1)防火控制装置调试(电动防火门(窗))","调试","个","78","64.
15","5003.
7025","""318","闽030705013003","消防控制装置","(1)消防控制装置接线电动防火门(2)接线采用金属软管保护","","个","78","35.
07001953125","2735.
4625","""漏电火灾报警监控系统"分项工程(17安装)""319","030411001016","配管","(1)规格:SC20(2)名称:钢管(3)接地要求:砖、混凝土结构暗配(4)配置形式:刷油防腐接地","电线管路敷设、钢索架设(拉紧装置安装)、预留沟槽、.
接地","m","3.
78000244140625","18.
800009765625","71.
0600390625","""320","030411004025","配线","(1)名称:电气配线(2)型号:ZB-RVSP(3)规格:2*2.
5mm2(4)材质:铜芯(5)配线部位:槽内","配线、钢索架设(拉紧装置安装)、支持体(夹板、绝缘子、槽板等)安装","m","357.
2803125","10.
810009765625","3862.
2025","""321","030411004026","配线","(1)名称:电气配线(2)型号:ZB-RVSP(3)规格:2*2.
5mm2(4)材质:铜芯(5)配线部位:管内","配线、钢索架设(拉紧装置安装)、支持体(夹板、绝缘子、槽板等)安装","m","3.
78000244140625","11.
670009765625","44.
1100390625","""322","030503006001","传感器","(1)温度传感器","本体安装和连接、通电检查、单体调整测试、系统联调","支","2","273.
13015625","546.
2603125","""323","030503006002","传感器","(1)剩余电流传感器","本体安装和连接、通电","支","2","887.
920625","1775.
84125","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第39页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""检查、单体调整测试、系统联调""设备电源监控系统"分项工程(17安装)""324","030411001017","配管","(1)规格:SC20(2)名称:钢管(3)接地要求:砖、混凝土结构暗配(4)配置形式:刷油防腐接地","电线管路敷设、钢索架设(拉紧装置安装)、预留沟槽、.
接地","m","7.
0600048828125","18.
81","132.
8","""325","030503006003","传感器","(1)电压信号传感器","本体安装和连接、通电检查、单体调整测试、系统联调","支","3","690.
490625","2071.
47","""326","030411004027","配线","(1)名称:电气配线(2)型号:WDZN-BYJ(F)(3)规格:2.
5mm2(4)材质:铜芯(5)配线部位:槽内","配线、钢索架设(拉紧装置安装)、支持体(夹板、绝缘子、槽板等)安装","m","155.
58","3.
65000244140625","567.
8703125","""327","030411004028","配线","(1)名称:电气配线(2)型号:WDZN-BYJ(F)(3)规格:2.
5mm2(4)材质:铜芯(5)配线部位:管内","配线、钢索架设(拉紧装置安装)、支持体(夹板、绝缘子、槽板等)安装","m","29.
22001953125","3.
58000244140625","104.
610078125","""328","030411004029","配线","(1)名称:电气配线(2)型号:WDZN-RVS(3)规格:2*2.
5mm2(4)材质:铜芯(5)配线部位:槽内","配线、钢索架设(拉紧装置安装)、支持体(夹板、绝缘子、槽板等)安装","m","77.
9800390625","4.
54000244140625","354.
0303125","""329","030411004030","配线","(1)名称:电气配线(2)型号:WDZN-RVS(3)规格:2*2.
5mm2(4)材质:铜芯(5)配线部位:管内","配线、钢索架设(拉紧装置安装)、支持体(夹板、绝缘子、槽板等)安装","m","14.
520009765625","5.
04000244140625","73.
18","""330","030408002003","控制电缆","(1)名称:控制电缆敷设(2)型号:ZBN-KVV(3)规格:4*2.
5(4)材质:铜质(5)电压等级(kV):0.
6/1kV","电缆敷设、揭(盖)盖板","m","357.
2703125","17.
19","6141.
47","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第40页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价","""消防水工程"分项工程(17安装)""331","030901002001","消火栓钢管","(1)安装部位:室内(2)材质、规格:内外壁热浸镀锌钢管DN100(P=1.
0MPa)(3)连接形式:沟槽式连接(4)压力试验及冲洗设计要求:管道冲洗、试压(5)管道标识设计要求:红色","管道及管件安装、钢管镀锌、压力试验、冲洗、管道标识","m","269.
35","166.
25","44779.
44","""332","030901002002","消火栓钢管","(1)安装部位:室内(2)材质、规格:内外壁热浸镀锌钢管DN65(P=1.
0MPa)(3)连接形式:沟槽式连接(4)压力试验及冲洗设计要求:管道冲洗、试压(5)管道标识设计要求:红色","管道及管件安装、钢管镀锌、压力试验、冲洗、管道标识","m","29.
40001953125","99.
660078125","2930","""333","031201001003","管道刷油","(1)油漆品种:调和漆、红丹漆(2)涂刷遍数、漆膜厚度:两遍","除锈、调配、涂刷","m2","166.
439","17.
890009765625","2977.
5925","""334","031002001002","管道支架","(1)材质:型钢(2)管架形式:一般管道支架","制作、安装","kg","175.
402","19.
120009765625","3353.
6925","""335","031201003002","金属结构刷油","(1)除锈级别:轻锈(2)油漆品种:红丹防锈漆调和漆(3)结构类型:金属结构(4)涂刷遍数、漆膜厚度:各两遍","除锈、调配、涂刷","kg","175.
402","2.
27000122070313","398.
1603125","""336","031002003009","套管","(1)名称、类型:穿楼板钢套管制作安装(2)材质:焊接钢管(3)规格:主管公称直径DN100(4)填料材质:水泥、石棉绒","制作、安装、除锈、刷油","个","80","98.
360078125","7868.
805","""337","030413003011","打洞(孔)","(1)名称:预留孔洞(混凝土楼板)DN100","开孔、洞、恢复处理","个","80","12.
410009765625","992.
800625","""338","031002003010","套管","(1)一般钢套管制作安装DN70","制作、安装、除锈、刷油","个","1","54.
1000390625","54.
1000390625","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第41页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价","""339","030413003012","打洞(孔)","(1)名称:预留孔洞(混凝土楼板)DN70","开孔、洞、恢复处理","个","1","9.
8500048828125","9.
8500048828125","""340","031003001006","螺纹阀门","(1)闸阀DN50","安装、电气接线、调试","个","24","284.
72","6833.
285","""341","031003001007","螺纹阀门","(1)铜截止阀DN25","安装、电气接线、调试","个","4","46.
8200390625","187.
28015625","""342","031003001008","螺纹阀门","(1)自动排气阀安装DN25","安装、电气接线、调试","个","4","178.
94015625","715.
760625","""343","030703004001","不锈钢蝶阀","(1)名称:对夹式蝶阀安装DN100","阀体安装","个","4","444.
5303125","1778.
12125","""344","030703004002","不锈钢蝶阀","(1)名称:对夹式蝶阀安装DN65","阀体安装","个","1","296.
80015625","296.
80015625","""345","030113015002","过滤器","(1)名称:过滤器DN50","本体安装、补刷(喷)油漆","台","24","271.
72","6521.
285","""346","030601002002","压力仪表","(1)名称:压力表(2)型号:型号为Y-100,表的量程为工作压力的2.
0-2.
5倍(3)压力表弯材质、规格:铜质(4)挠性管材质、规格:铜质(5)调试要求:符合规范及设计要求(6)脱脂要求:符合规范及设计要求","本体安装、压力表弯制作、安装、挠性管安装、取源部件配合安装、单体校验调整、脱脂、支架制作、安装","台","1","117.
450078125","117.
450078125","""347","030901010001","室内消火栓","(1)屋面试验消火栓DN65含消火栓箱1个,消火栓SN65(1个)水枪1支,水带(30m)1条,压力表1套","箱体及消火栓安装、配件安装","套","1","850.
410625","850.
410625","""348","030901010002","室内消火栓","(1)嵌墙安装(2)室内消火栓单栓采用SG24B65Z-J铝合金箱,箱内配DN65消火栓口一个,衬胶水龙带(L=25m,直径65mm)一条,QZ19水枪一支,(3)消防软管卷盘一19软管长30m,安装详15S202-13(4)每个消火栓处设有消防报警按钮.
","箱体及消火栓安装、配件安装","套","46","1390.
62125","63968.
52","""349","030901013001","灭火器","(1)手提式磷酸铵盐干粉灭火器MF/ABC4","设置","组","26","300.
48015625","7812.
485","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第42页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价","""350","030905002001","水灭火控制装置调试","(1)水灭火控制装置调试(消火栓灭火系统)","调试","点","48","249.
35015625","11968.
81","""喷淋工程"分项工程(17安装)""351","030901001001","水喷淋钢管","(1)安装部位:室内(2)材质、规格:内外壁热浸镀锌钢管DN50(P=1.
0MPa)(3)连接形式:螺纹连接(4)压力试验及冲洗设计要求:管道冲洗、试压(5)管道标识设计要求:红色","管道及管件安装、钢管镀锌、压力试验、冲洗、管道标识","m","130.
45","98.
130078125","12801.
06","""352","030901001002","水喷淋钢管","(1)安装部位:室内(2)材质、规格:内外壁热浸镀锌钢管DN40(P=1.
0MPa)(3)连接形式:螺纹连接(4)压力试验及冲洗设计要求:管道冲洗、试压(5)管道标识设计要求:红色","管道及管件安装、钢管镀锌、压力试验、冲洗、管道标识","m","51.
6000390625","74.
32","3834.
9125","""353","030901001003","水喷淋钢管","(1)安装部位:室内(2)材质、规格:内外壁热浸镀锌钢管DN32(P=1.
0MPa)(3)连接形式:螺纹连接(4)压力试验及冲洗设计要求:管道冲洗、试压(5)管道标识设计要求:红色","管道及管件安装、钢管镀锌、压力试验、冲洗、管道标识","m","57.
7000390625","65.
32","3768.
9625","""354","030901001004","水喷淋钢管","(1)安装部位:室内(2)材质、规格:内外壁热浸镀锌钢管DN25(P=1.
0MPa)(3)连接形式:螺纹连接(4)压力试验及冲洗设计要求:管道冲洗、试压(5)管道标识设计要求:红色","管道及管件安装、钢管镀锌、压力试验、冲洗、管道标识","m","218.
54015625","53.
6000390625","11713.
74","""355","031002001003","管道支架","(1)材质:型钢","制作、安装","kg","140.
540078125","19.
120009765625","2687.
1225","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第43页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""2)管架形式:一般管道支架""356","031201003003","金属结构刷油","(1)除锈级别:轻锈(2)油漆品种:红丹防锈漆调和漆(3)结构类型:金属结构(4)涂刷遍数、漆膜厚度:各两遍","除锈、调配、涂刷","kg","140.
540078125","2.
27000122070313","319.
03","""357","031201001004","管道刷油","(1)油漆品种:调和漆、红丹漆(2)涂刷遍数、漆膜厚度:两遍","除锈、调配、涂刷","m2","63.
014","17.
890009765625","1127.
320625","""358","030901003001","水喷淋(雾)喷头","(1)安装部位:室内(2)材质、型号、规格:直立型喷头DN15,K=80(3)装饰盘设计要求:距顶板底75~150mm","安装、装饰盘安装、严密性试验","个","144","49.
4100390625","7115.
045","""智能照明工程"分项工程(17安装)""359","030404017007","配电箱","(1)规格:智能照明控制箱0.
3KVa-36L(2)名称:成套配电箱安装(3)安装方式:嵌入式","本体安装、基础型钢制作、安装、焊、压接线端子、补刷(喷)油漆、接地","台","1","11335.
41","11335.
41","""360","030411001018","配管","(1)规格:SC15(2)名称:钢管(3)接地要求:刷油防腐接地(4)配置形式:砖、混凝土结构暗配","电线管路敷设、钢索架设(拉紧装置安装)、预留沟槽、.
接地","m","660.
740625","14.
970009765625","9891.
28","""361","030411001019","配管","(1)名称:金属软管敷设(内径≤16mm每根长≤0.
5m)","电线管路敷设、钢索架设(拉紧装置安装)、预留沟槽、.
接地","m","11","45.
3700390625","499.
0703125","""362","030411006010","接线盒","(1)接线盒安装(暗装接线盒)(2)普通开关、按钮安装(空白面板安装)","本体安装","个","11","10.
1500048828125","111.
650078125","""363","030411004031","配线","(1)规格:WDZN-RVS-2*2.
5(2)名称:穿多芯软导线","配线、钢索架设(拉紧装置安装)、支持体(夹板、绝缘子、槽板等)安装","m","633.
1603125","4.
88000244140625","3089.
8225","""364","030412004004","装饰灯","(1)名称:疏散照明灯5W/DC36V额定光通量500lm","本体安装","套","32","317","10144","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第44页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""2)安装形式:吸顶式(靠墙柱时壁装,距地2.
5m)"365","030412004005","装饰灯","(1)名称:楼层标志灯1.
0W/DC36V(2)安装形式:距地2.
5m","本体安装","套","16","290.
92015625","4654.
7225","""366","030412004006","装饰灯","(1)名称:方向标志灯1.
0W/DC36V(2)安装形式:距地0.
3m","本体安装","套","32","290.
92015625","9309.
445","""367","030411006011","接线盒","(1)名称:接线盒安装(接线盒暗装难燃聚氯乙烯暗装灯头盒)","本体安装","个","80","6.
2300048828125","498.
4003125","""抗震支架"分项工程(17安装)""","","消防水""368","030704001001","抗震支吊架","(1)侧向抗震支吊架底边长100","通风管道风量测定、风压测定、温度测定、各系统风口、阀门调整","套","6","729.
890625","4379.
3425","""369","030704001002","抗震支吊架","(1)侧向抗震支吊架底边长150","通风管道风量测定、风压测定、温度测定、各系统风口、阀门调整","套","5","834.
170625","4170.
85","""370","030704001003","抗震支吊架","(1)双向抗震支吊架底边长100","通风管道风量测定、风压测定、温度测定、各系统风口、阀门调整","套","6","1369.
94125","8219.
645","""371","030704001004","抗震支吊架","(1)双向抗震支吊架底边长150","通风管道风量测定、风压测定、温度测定、各系统风口、阀门调整","套","3","1567.
27125","4701.
81","""","","电气桥架""372","030704001005","抗震支吊架","(1)电缆桥架侧向抗震支吊架底边长300","通风管道风量测定、风压测定、温度测定、各系统风口、阀门调整","套","3","1471.
01125","4413.
0325","""373","030704001006","抗震支吊架","(1)电缆桥架双向抗震支吊架底边长300","通风管道风量测定、风压测定、温度测定、各系统风口、","套","2","1764.
57125","3529.
1425","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第45页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""阀门调整""裙楼安装"单位工程(17安装)""水卫工程"分项工程(17安装)""374","031001007005","复合管","(1)室内(钢塑复合管(螺纹连接)DN50(2)管道消毒、冲洗、水压试验DN50(3)管道、管件及管卡的安装","管道安装、管件安装、塑料卡固定、压力试验、吹扫、冲洗、警示带铺设","m","210","90.
010078125","18902.
1","""375","031001007006","复合管","(1)室内(钢塑复合管(螺纹连接)DN40(2)管道消毒、冲洗、水压试验DN40(3)管道、管件及管卡的安装","管道安装、管件安装、塑料卡固定、压力试验、吹扫、冲洗、警示带铺设","m","36","76.
7300390625","2762.
2825","""376","031001007007","复合管","(1)室内(钢塑复合管(螺纹连接)DN32(2)管道消毒、冲洗、水压试验DN32(3)管道、管件及管卡的安装","管道安装、管件安装、塑料卡固定、压力试验、吹扫、冲洗、警示带铺设","m","105.
600078125","80.
68","8519.
81","""377","031001007008","复合管","(1)室内(钢塑复合管(螺纹连接)DN20(2)管道消毒、冲洗、水压试验DN20(3)管道、管件及管卡的安装","管道安装、管件安装、塑料卡固定、压力试验、吹扫、冲洗、警示带铺设","m","12.
240009765625","44.
4700390625","544.
31","""378","031002001004","管道支架","(1)材质:型钢(2)管架形式:一般管道支架","制作、安装","kg","119.
346","17.
83","2127.
94125","""379","031201003004","金属结构刷油","(1)除锈级别:轻锈(2)油漆品种:红丹防锈漆调和漆(3)结构类型:金属结构(4)涂刷遍数、漆膜厚度:各两遍","除锈、调配、涂刷","kg","75.
202","2.
26","169.
96015625","""380","031201001005","管道刷油","(1)油漆品种:调和漆、银粉漆(2)涂刷遍数、漆膜厚度:两遍","除锈、调配、涂刷","m2","60.
037","16.
840009765625","1011.
020625","""381","031001006008","塑料管","(1)室内塑料给水管(热熔连接)外径25mm以内(2)管道消毒、冲洗(公称直径20mm以内)","管道安装、管件安装、塑料卡固定、阻火圈安装、压力试验、吹扫、","m","1244","32.
65001953125","40616.
6","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第46页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""3)管道水压试验","冲洗、警示带铺设""382","031002003011","套管","(1)名称、类型:穿楼板钢套管制作安装(2)材质:焊接钢管(3)规格:主管公称直径DN50(4)填料材质:水泥、石棉绒","制作、安装、除锈、刷油","个","70","38.
64001953125","2704.
8025","""383","031002003012","套管","(1)名称、类型:穿楼板钢套管制作安装(2)材质:焊接钢管(3)规格:主管公称直径DN40(4)填料材质:水泥、石棉绒","制作、安装、除锈、刷油","个","12","38.
64001953125","463.
6803125","""384","031002003013","套管","(1)名称、类型:穿楼板钢套管制作安装(2)材质:焊接钢管(3)规格:主管公称直径DN32(4)填料材质:水泥、石棉绒","制作、安装、除锈、刷油","个","6","25.
18001953125","151.
08","""385","030413003013","打洞(孔)","(1)名称:预留孔洞(混凝土楼板)DN50","开孔、洞、恢复处理","个","70","7.
3000048828125","511","""386","030413003014","打洞(孔)","(1)名称:预留孔洞(混凝土楼板)DN40","开孔、洞、恢复处理","个","12","7.
3000048828125","87.
600078125","""387","030413003015","打洞(孔)","(1)名称:预留孔洞(混凝土楼板)DN32","开孔、洞、恢复处理","个","6","7.
3000048828125","43.
8000390625","""388","031003001009","螺纹阀门","(1)类型:自动排气阀(2)规格、压力等级:DN25(P=1.
6MPa)(3)连接形式:螺纹连接","安装、电气接线、调试","个","6","176.
04015625","1056.
240625","""389","031003001010","螺纹阀门","(1)类型:铜质截止阀(2)规格、压力等级:DN32(P=1.
6MPa)(3)连接形式:螺纹连接","安装、电气接线、调试","个","64","105.
680078125","6763.
525","""390","031003001011","螺纹阀门","(1)类型:铜质截止阀(2)规格、压力等级:DN25(P=1.
6M","安装、电气接线、调试","个","6","44.
6900390625","268.
14015625","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第47页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""Pa)(3)连接形式:螺纹连接""391","031003001012","螺纹阀门","(1)类型:铜质截止阀(2)规格、压力等级:DN20(P=1.
6MPa)(3)连接形式:螺纹连接","安装、电气接线、调试","个","48","35.
54001953125","1705.
92125","""392","031003001013","螺纹阀门","(1)类型:可调式减压阀(2)规格、压力等级:DN40(阀后压力0.
16MPa)(3)连接形式:螺纹连接","安装、电气接线、调试","个","28","81.
79","2290.
12125","""393","030113015003","过滤器","(1)类型:Y型过滤器(2)规格、压力等级:DN40(P=1.
6MPa)(3)连接形式:螺纹连接","本体安装、补刷(喷)油漆","台","28","146.
52","4102.
56","""394","031004014011","给、排水附(配)件","(1)水龙头安装DN20","安装","个","120","10.
740009765625","1288.
800625","""395","031004014012","给、排水附(配)件","(1)名称:嵌铜配件DN20","安装","个","120","3.
46000244140625","415.
2003125","""396","030601002003","压力仪表","(1)名称:压力表(2)型号:型号为Y-100,表的量程为工作压力的2.
0-2.
5倍(3)压力表弯材质、规格:铜质(4)挠性管材质、规格:铜质(5)调试要求:符合规范及设计要求(6)脱脂要求:符合规范及设计要求","本体安装、压力表弯制作、安装、挠性管安装、取源部件配合安装、单体校验调整、脱脂、支架制作、安装","台","56","117.
450078125","6577.
205","""397","031001005002","铸铁管","(1)安装部位:室内(2)介质:排水(3)材质、规格:柔性铸铁排水管DN100(4)连接形式:法兰连接(5)压力试验及吹、洗设计要求:通水及通球试验","管道安装、管件安装、压力试验、吹扫、冲洗、警示带铺设","m","28","272.
25","7623","""398","031001006009","塑料管","(1)安装部位:室内(2)介质:排水","管道安装、管件安装、塑料卡固定","m","1220.
096","64.
5","78696.
19","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第48页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""3)材质、规格:UPVC硬塑料排水管De110(4)连接形式:粘接(5)压力试验及吹、洗设计要求:通水及通球试验","、阻火圈安装、压力试验、吹扫、冲洗、警示带铺设""399","031001006010","塑料管","(1)安装部位:室内(2)介质:排水(3)材质、规格:PP聚丙烯静音排水管DN100(4)连接形式:粘接(5)压力试验及吹、洗设计要求:通水及通球试验","管道安装、管件安装、塑料卡固定、阻火圈安装、压力试验、吹扫、冲洗、警示带铺设","m","915.
072","64.
5","59022.
14","""400","031001006011","塑料管","(1)安装部位:室内(2)介质:排水(3)材质、规格:UPVC塑料排水管De110(4)连接形式:粘接(5)压力试验及吹、洗设计要求:通水及通球试验","管道安装、管件安装、塑料卡固定、阻火圈安装、压力试验、吹扫、冲洗、警示带铺设","m","451.
4503125","64.
5","29118.
53","""401","031001006012","塑料管","(1)安装部位:室内(2)介质:排水(3)材质、规格:UPVC塑料排水管De50(4)压力试验及吹、洗设计要求:通水及通球试验","管道安装、管件安装、塑料卡固定、阻火圈安装、压力试验、吹扫、冲洗、警示带铺设","m","1057.
874","33.
67001953125","35618.
62","""402","031002003014","套管","(1)名称、类型:穿楼板钢套管制作安装(2)材质:焊接钢管(3)规格:主管公称直径DN100(4)填料材质:水泥、石棉绒","制作、安装、除锈、刷油","个","616","91.
880078125","56598.
12","""403","031002003015","套管","(1)名称、类型:穿墙板钢套管制作安装(2)材质:焊接钢管(3)规格:主管公称直径DN100(4)填料材质:水泥、石棉绒","制作、安装、除锈、刷油","个","8","96.
900078125","775.
200625","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第49页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价","""404","031002003016","套管","(1)名称、类型:刚性防水套管制作安装(2)材质:普通钢板(3)规格:主管公称直径DN100","制作、安装、除锈、刷油","个","28","341.
1003125","9550.
8","""405","031002003017","套管","(1)名称、类型:穿墙板钢套管制作安装(2)材质:焊接钢管(3)规格:主管公称直径DN150(4)填料材质:水泥、石棉绒","制作、安装、除锈、刷油","个","8","1060.
200625","8481.
605","""406","030413003016","打洞(孔)","(1)名称:预留孔洞(混凝土楼板)DN100","开孔、洞、恢复处理","个","616","11.
270009765625","6942.
325","""407","030413003017","打洞(孔)","(1)预留孔洞(混凝土楼板)DN150","开孔、洞、恢复处理","个","8","14.
780009765625","118.
240078125","""408","030413003018","打洞(孔)","(1)预留孔洞(混凝土楼板)DN100","开孔、洞、恢复处理","个","8","11.
270009765625","90.
160078125","""409","030413003019","打洞(孔)","(1)预留孔洞(混凝土楼板)DN100(大便器预留洞)","开孔、洞、恢复处理","个","240","11.
270009765625","2704.
8025","""410","030413003020","打洞(孔)","(1)预留孔洞(混凝土楼板)DN50(洗脸盆预留洞)","开孔、洞、恢复处理","个","240","7.
3000048828125","1752","""411","030413003021","打洞(孔)","(1)预留孔洞(混凝土楼板)DN50(洗涤槽)","开孔、洞、恢复处理","个","159","7.
3000048828125","1160.
700625","""412","031004014013","给、排水附(配)件","(1)名称:阻火圈安装(公称直径100mm以内)","安装","个","616","37.
22001953125","22927.
54","""413","031004014014","给、排水附(配)件","(1)地面扫除口安装DN100(2)预留孔洞(混凝土楼板)DN100","安装","个","12","34.
98","419.
7603125","""414","031004014015","给、排水附(配)件","(1)地漏安装(公称直径50mm以内带存水弯)P弯(2)预留孔洞(混凝土楼板公称直径50mm以内)","安装","个","433","43.
3600390625","18774.
89","""415","031004014016","给、排水附(配)件","(1)地漏安装(公称直径50mm以内带存水弯)S弯(2)预留孔洞(混凝土楼板)DN50","安装","个","164","43.
3600390625","7111.
045","""416","031004014017","给、排水附(配)件","(1)名称:底部异径弯头DN150","安装","个","12","68.
7800390625","825.
360625","""417","031004014018","给、排水附(配)件","(1)名称:CHT旋流接头DN100","安装","个","252","118.
030078125","29743.
56","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第50页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价","""418","031004014019","给、排水附(配)件","(1)名称:S4S稳流接头DN100","安装","个","12","157.
36","1888.
32125","""419","010101007003","管沟土方","(1)土壤类别:三类土(2)管外径:DN200以内(3)挖沟深度:平均1米(4)回填要求:利用适合的原土回填","排地表水、土方开挖、围护(挡土板)、支撑、运输、回填","m","80.
6600390625","84.
400078125","6807.
705","""420","010101007004","管沟土方","(1)土壤类别:三类土(2)管外径:DN100以内(3)挖沟深度:平均1米(4)回填要求:利用适合的原土回填","排地表水、土方开挖、围护(挡土板)、支撑、运输、回填","m","137.
400078125","73.
8700390625","10149.
745","""421","031201001006","管道刷油","(1)铸铁管、暖气片刷油(热沥青二遍)","除锈、调配、涂刷","m2","91.
009","38.
3","3485.
6425","""422","031201001007","管道刷油","(1)管道刷油(防锈漆二遍)(2)管道刷油(红丹防锈漆二遍)","除锈、调配、涂刷","m2","10.
027","17.
290009765625","173.
37015625","""423","031001006013","塑料管","(1)安装部位:室内(2)介质:空调排水(3)材质、规格:PVC-U塑料排水管De50(4)连接形式:粘接(5)压力试验及吹、洗设计要求:通水及通球试验","管道安装、管件安装、塑料卡固定、阻火圈安装、压力试验、吹扫、冲洗、警示带铺设","m","900","33.
67001953125","30303","""424","031001006014","塑料管","(1)安装部位:室内(2)介质:空调排水(3)材质、规格:PVC-U塑料排水管De25(4)连接形式:粘接(5)压力试验及吹、洗设计要求:通水及通球试验","管道安装、管件安装、塑料卡固定、阻火圈安装、压力试验、吹扫、冲洗、警示带铺设","m","74.
4","33.
67001953125","2505.
05","""425","031002003018","套管","(1)名称、类型:穿楼板钢套管制作安装(2)材质:焊接钢管(3)规格:主管公","制作、安装、除锈、刷油","个","180","38.
64001953125","6955.
205","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第51页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""称直径DN50(4)填料材质:水泥、石棉绒""426","030413003022","打洞(孔)","(1)预留孔洞(混凝土楼板)DN50","开孔、洞、恢复处理","个","180","7.
3000048828125","1314","""427","031004014020","给、排水附(配)件","(1)钢丝网DN50","安装","个","15","4.
94","74.
1","""电气工程"分项工程(17安装)""428","030404017008","配电箱","(1)名称:成套配电箱1AM1(2)安装方式:挂墙明装","本体安装、基础型钢制作、安装、焊、压接线端子、补刷(喷)油漆、接地","台","1","1618.
69125","1618.
69125","""429","030404017009","配电箱","(1)名称:成套配电箱1AM2(2)安装方式:挂墙明装","本体安装、基础型钢制作、安装、焊、压接线端子、补刷(喷)油漆、接地","台","1","1618.
69125","1618.
69125","""430","030404017010","配电箱","(1)名称:成套配电箱2AM1(2)安装方式:挂墙明装","本体安装、基础型钢制作、安装、焊、压接线端子、补刷(喷)油漆、接地","台","1","1618.
69125","1618.
69125","""431","030404017011","配电箱","(1)名称:成套配电箱2AM2(2)安装方式:挂墙明装","本体安装、基础型钢制作、安装、焊、压接线端子、补刷(喷)油漆、接地","台","1","1618.
69125","1618.
69125","""432","030404017012","配电箱","(1)名称:成套配电箱3AM1(2)安装方式:挂墙明装","本体安装、基础型钢制作、安装、焊、压接线端子、补刷(喷)油漆、接地","台","1","1618.
69125","1618.
69125","""433","030404017013","配电箱","(1)名称:成套配电箱3AM2(2)安装方式:挂墙明装","本体安装、基础型钢制作、安装、焊、压接线端子、补刷(喷)油漆、接地","台","1","1618.
69125","1618.
69125","""434","030404017014","配电箱","(1)名称:成套配电箱1ALg(2)安装方式:挂墙明装","本体安装、基础型钢制作、安装、焊、压接线端子、补刷(喷)油漆、接地","台","1","4137.
23","4137.
23","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第52页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价","""435","030404017015","配电箱","(1)名称:成套配电箱2ALg(2)安装方式:挂墙明装","本体安装、基础型钢制作、安装、焊、压接线端子、补刷(喷)油漆、接地","台","1","4137.
23","4137.
23","""436","030404017016","配电箱","(1)名称:成套配电箱3ALg(2)安装方式:挂墙明装","本体安装、基础型钢制作、安装、焊、压接线端子、补刷(喷)油漆、接地","台","1","3064.
9125","3064.
9125","""437","030404017017","配电箱","(1)名称:成套配电箱1ALEg(2)安装方式:挂墙明装","本体安装、基础型钢制作、安装、焊、压接线端子、补刷(喷)油漆、接地","台","1","6734.
725","6734.
725","""438","030404017018","配电箱","(1)名称:成套配电箱2ALEg(2)安装方式:挂墙明装","本体安装、基础型钢制作、安装、焊、压接线端子、补刷(喷)油漆、接地","台","1","6734.
725","6734.
725","""439","030404017019","配电箱","(1)名称:成套配电箱3ALEg(2)安装方式:挂墙明装","本体安装、基础型钢制作、安装、焊、压接线端子、补刷(喷)油漆、接地","台","1","6734.
725","6734.
725","""440","030404017020","配电箱","(1)名称:成套配电箱1APkt(2)安装方式:挂墙明装","本体安装、基础型钢制作、安装、焊、压接线端子、补刷(喷)油漆、接地","台","1","5253.
965","5253.
965","""441","030404017021","配电箱","(1)名称:成套配电箱2APkt(2)安装方式:挂墙明装","本体安装、基础型钢制作、安装、焊、压接线端子、补刷(喷)油漆、接地","台","1","5253.
965","5253.
965","""442","030404017022","配电箱","(1)名称:成套配电箱3APkt(2)安装方式:挂墙明装","本体安装、基础型钢制作、安装、焊、压接线端子、补刷(喷)油漆、接地","台","1","5253.
965","5253.
965","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第53页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价","""443","030404017023","配电箱","(1)名称:成套配电箱3AP(2)安装方式:挂墙明装","本体安装、基础型钢制作、安装、焊、压接线端子、补刷(喷)油漆、接地","台","1","4170.
5525","4170.
5525","""444","030404017024","配电箱","(1)名称:成套配电箱3APE(2)安装方式:挂墙明装","本体安装、基础型钢制作、安装、焊、压接线端子、补刷(喷)油漆、接地","台","1","4170.
5525","4170.
5525","""445","030404017025","配电箱","(1)名称:成套配电箱1ALfg(2)安装方式:挂墙明装","本体安装、基础型钢制作、安装、焊、压接线端子、补刷(喷)油漆、接地","台","1","3990.
3825","3990.
3825","""446","030404017026","配电箱","(1)名称:成套配电箱3ALfg(2)安装方式:挂墙明装","本体安装、基础型钢制作、安装、焊、压接线端子、补刷(喷)油漆、接地","台","1","3990.
3825","3990.
3825","""447","030404017027","配电箱","(1)名称:成套配电箱ATxk(2)安装方式:挂墙明装","本体安装、基础型钢制作、安装、焊、压接线端子、补刷(喷)油漆、接地","台","1","11100.
49","11100.
49","""448","030404017028","配电箱","(1)名称:成套配电箱ATjk(2)安装方式:挂墙明装","本体安装、基础型钢制作、安装、焊、压接线端子、补刷(喷)油漆、接地","台","1","12702.
21","12702.
21","""449","030404017029","配电箱","(1)名称:成套配电箱ALtv(2)安装方式:挂墙明装","本体安装、基础型钢制作、安装、焊、压接线端子、补刷(喷)油漆、接地","台","1","1793.
92125","1793.
92125","""450","030404017030","配电箱","(1)名称:成套配电箱ATbd(2)安装方式:挂墙明装","本体安装、基础型钢制作、安装、焊、压接线端子、补刷(喷)油漆、接地","台","1","9583.
96","9583.
96","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第54页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价","""451","030404017031","配电箱","(1)名称:成套配电箱ATpd(2)安装方式:挂墙明装","本体安装、基础型钢制作、安装、焊、压接线端子、补刷(喷)油漆、接地","台","1","9583.
96","9583.
96","""452","030404017032","配电箱","(1)名称:成套配电箱2APft(2)安装方式:挂墙明装","本体安装、基础型钢制作、安装、焊、压接线端子、补刷(喷)油漆、接地","台","1","3805.
2925","3805.
2925","""453","030404017033","配电箱","(1)名称:成套配电箱3APft(2)安装方式:挂墙明装","本体安装、基础型钢制作、安装、焊、压接线端子、补刷(喷)油漆、接地","台","1","3805.
2925","3805.
2925","""454","030404017034","配电箱","(1)名称:成套配电箱3ATdt(2)安装方式:挂墙明装","本体安装、基础型钢制作、安装、焊、压接线端子、补刷(喷)油漆、接地","台","2","14830.
78","29661.
56","""455","030404017035","配电箱","(1)名称:成套配电箱2APld(2)安装方式:挂墙明装","本体安装、基础型钢制作、安装、焊、压接线端子、补刷(喷)油漆、接地","台","1","5383.
53","5383.
53","""456","030404017036","配电箱","(1)名称:成套配电箱ACld(2)安装方式:挂墙明装","本体安装、基础型钢制作、安装、焊、压接线端子、补刷(喷)油漆、接地","台","1","6505.
21","6505.
21","""457","030404017037","配电箱","(1)名称:冷水机组控制箱3AClj1~3(厂家配套)(2)安装方式:挂墙明装","本体安装、基础型钢制作、安装、焊、压接线端子、补刷(喷)油漆、接地","台","3","230.
48015625","691.
440625","""458","030404017038","配电箱","(1)名称:排烟风机控制箱4ATpy1(2)安装方式:挂墙明装","本体安装、基础型钢制作、安装、焊、压接线端子、补刷(喷)油漆、接地","台","1","10539.
7","10539.
7","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第55页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价","""459","030404017039","配电箱","(1)名称:排烟风机控制箱4ATpy2(2)安装方式:挂墙明装","本体安装、基础型钢制作、安装、焊、压接线端子、补刷(喷)油漆、接地","台","1","10539.
7","10539.
7","""460","030411005002","接线箱","(1)名称:母线槽插接箱(2)安装方式:挂墙明装","本体安装","个","6","1225.
15","7350.
905","""461","030411005003","接线箱","(1)名称:电缆分接箱(2)安装方式:挂墙明装","本体安装","个","16","231.
81015625","3708.
9625","""462","030411003004","桥架","(1)名称:钢制桥架(2)规格:MR-700*100(3)接地要求:防腐接地","本体安装、接地","m","11.
670009765625","321.
23015625","3748.
75","""463","030411003005","桥架","(1)名称:钢制桥架(2)规格:MR-500*100(3)接地要求:防腐接地","本体安装、接地","m","71.
5500390625","191.
46015625","13698.
97","""464","030411003006","桥架","(1)名称:钢制桥架(2)规格:MR-400*100(3)接地要求:防腐接地","本体安装、接地","m","639.
5203125","163.
490078125","104555.
12","""465","030411003007","桥架","(1)名称:钢制桥架(2)规格:MR-300*100(3)接地要求:防腐接地","本体安装、接地","m","599.
0903125","105.
120078125","62976.
34","""466","030411003008","桥架","(1)名称:钢制桥架(2)规格:MR-100*50(3)接地要求:防腐接地","本体安装、接地","m","67.
04","44.
8300390625","3005.
4025","""467","030413001003","铁构件","(1)名称:桥架支撑架制作安装(2)材质:型钢(3)防腐、刷油","制作、安装、补刷(喷)油漆","kg","602.
627","15.
380009765625","9268.
405","""468","030411001020","配管","(1)规格:PC32(2)名称:塑料管(3)配置形式:砖、混凝土结构暗配","电线管路敷设、钢索架设(拉紧装置安装)、预留沟槽、.
接地","m","64.
8900390625","11.
910009765625","772.
840625","""469","030411001021","配管","(1)规格:PC20(2)名称:塑料管","电线管路敷设、钢索架","m","790.
530625","10.
380009765625","8205.
7","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第56页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""3)配置形式:砖、混凝土结构暗配","设(拉紧装置安装)、预留沟槽、.
接地""470","030411001022","配管","(1)规格:PC16(2)名称:塑料管(3)配置形式:砖、混凝土结构暗配PC16","电线管路敷设、钢索架设(拉紧装置安装)、预留沟槽、.
接地","m","663.
240625","9.
3300048828125","6188.
03","""471","030411001023","配管","(1)规格:SC65(2)名称:钢管(3)接地要求:刷油防腐接地(4)配置形式:砖、混凝土结构暗配","电线管路敷设、钢索架设(拉紧装置安装)、预留沟槽、.
接地","m","136.
280078125","61.
1100390625","8328.
07","""472","030411001024","配管","(1)规格:SC50(2)名称:钢管(3)接地要求:刷油防腐接地(4)配置形式:砖、混凝土结构暗配","电线管路敷设、钢索架设(拉紧装置安装)、预留沟槽、.
接地","m","145.
820078125","44.
0600390625","6424.
83","""473","030411001025","配管","(1)规格:SC40(2)名称:钢管(3)接地要求:刷油防腐接地(4)配置形式:砖、混凝土结构暗配","电线管路敷设、钢索架设(拉紧装置安装)、预留沟槽、.
接地","m","35.
83001953125","37.
39001953125","1339.
68125","""474","030411001026","配管","(1)规格:SC32(2)名称:钢管(3)接地要求:刷油防腐接地(4)配置形式:砖、混凝土结构暗配","电线管路敷设、钢索架设(拉紧装置安装)、预留沟槽、.
接地","m","2438.
66125","27.
60001953125","67307.
02","""475","030411001027","配管","(1)规格:SC25(2)名称:钢管(3)接地要求:刷油防腐接地(4)配置形式:砖、混凝土结构暗配","电线管路敷设、钢索架设(拉紧装置安装)、预留沟槽、.
接地","m","386.
0503125","22.
76001953125","8786.
5","""476","030411001028","配管","(1)规格:SC20(2)名称:钢管(3)接地要求:刷油防腐接地(4)配置形式:砖、混凝土结构暗配","电线管路敷设、钢索架设(拉紧装置安装)、预留沟槽、.
接地","m","3019.
2625","17.
710009765625","53471.
09","""477","030411001029","配管","(1)规格:SC15(2)名称:钢管(3)接地要求:刷油防腐接地(4)配置形式:砖、混凝土结构暗配","电线管路敷设、钢索架设(拉紧装置安装)、预留沟槽、.
接地","m","310.
41","14.
970009765625","4646.
8425","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第57页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价","""478","030411001030","配管","(1)名称:金属软管敷设(内径≤50mm每根长≤0.
5m)","电线管路敷设、钢索架设(拉紧装置安装)、预留沟槽、.
接地","m","14","253.
46015625","3548.
4425","""479","030411001031","配管","(1)名称:金属软管敷设(内径≤32mm每根长≤0.
5m)","电线管路敷设、钢索架设(拉紧装置安装)、预留沟槽、.
接地","m","5","76.
29","381.
4503125","""480","030411001032","配管","(1)名称:金属软管敷设(内径≤25mm每根长≤0.
5m)","电线管路敷设、钢索架设(拉紧装置安装)、预留沟槽、.
接地","m","14","65.
25","913.
5","""481","030411006012","接线盒","(1)名称:接线盒+GB(2)材质:钢质(3)安装形式:暗装","本体安装","个","66","10.
1500048828125","669.
900625","""482","030411004032","配线","(1)规格:WDZN-BYJ-2.
5(2)名称:线槽配线","配线、钢索架设(拉紧装置安装)、支持体(夹板、绝缘子、槽板等)安装","m","8878.
85","3.
51000244140625","31164.
76","""483","030411004033","配线","(1)规格:WDZD-BYJ-2.
5(2)名称:线槽配线","配线、钢索架设(拉紧装置安装)、支持体(夹板、绝缘子、槽板等)安装","m","2380.
75","2.
88000244140625","6856.
565","""484","030411004034","配线","(1)规格:WDZN-BYJ-2.
5(2)名称:穿照明线","配线、钢索架设(拉紧装置安装)、支持体(夹板、绝缘子、槽板等)安装","m","13392.
7","4","53570.
8","""485","030411004035","配线","(1)规格:WDZDN-BYJ-2.
5(2)名称:穿照明线","配线、钢索架设(拉紧装置安装)、支持体(夹板、绝缘子、槽板等)安装","m","359.
0403125","4","1436.
16125","""486","030411004036","配线","(1)规格:WDZN-BYJ-6(2)名称:穿动力线","配线、钢索架设(拉紧装置安装)、支持体(夹板、绝缘子、槽板等)安装","m","72.
85","6.
9200048828125","504.
1203125","""487","030411004037","配线","(1)规格:WDZD-BYJ-4(2)名称:穿照明线","配线、钢索架设(拉紧装置安装)、支持体(夹板、绝缘子、槽板等)安装","m","45.
8700390625","3.
11000244140625","142.
660078125","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第58页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价","""488","030411004038","配线","(1)规格:WDZD-BYJ-2.
5(2)名称:穿照明线","配线、钢索架设(拉紧装置安装)、支持体(夹板、绝缘子、槽板等)安装","m","6574.
105","3.
28000244140625","21563.
05","""489","030411004039","配线","(1)规格:WDZD-BYJ-10(2)名称:穿动力线","配线、钢索架设(拉紧装置安装)、支持体(夹板、绝缘子、槽板等)安装","m","45","8.
03","361.
3503125","""490","030408001009","电力电缆","(1)名称:铜芯电力电缆敷设(2)型号:WDZD-YJY(3)规格:5*6(4)敷设方式、部位:桥架(5)电压等级(kV):0.
6/1KV","电缆敷设、揭(盖)盖板","m","429.
9303125","36.
25","15584.
97","""491","030408006009","电力电缆头","(1)名称:铜芯电力电缆头制作安装(2)型号:WDZD-YJY(3)规格:5*6(4)安装部位:箱内(5)电压等级(kV):0.
6/1KV","电力电缆头头制作、电缆电缆头安装、接地","个","28","134.
27","3759.
5625","""492","030408001010","电力电缆","(1)名称:铜芯电力电缆敷设(2)型号:WDZD-YJY(3)规格:5*16(4)敷设方式、部位:桥架(5)电压等级(kV):0.
6/1KV","电缆敷设、揭(盖)盖板","m","12.
640009765625","71.
1700390625","899.
590625","""493","030408006010","电力电缆头","(1)名称:铜芯电力电缆头制作安装(2)型号:WDZD-YJY(3)规格:5*16(4)安装部位:箱内(5)电压等级(kV):0.
6/1KV","电力电缆头头制作、电缆电缆头安装、接地","个","2","134.
27","268.
54","""494","030408001011","电力电缆","(1)名称:铜芯电力电缆敷设(2)型号:WDZD-YJY(3)规格:5*10(4)敷设方式、部位:桥架","电缆敷设、揭(盖)盖板","m","343.
5303125","48.
8300390625","16774.
57","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第59页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""5)电压等级(kV):0.
6/1KV""495","030408006011","电力电缆头","(1)名称:铜芯电力电缆头制作安装(2)型号:WDZD-YJY(3)规格:5*10(4)安装部位:箱内(5)电压等级(kV):0.
6/1KV","电力电缆头头制作、电缆电缆头安装、接地","个","18","134.
27","2416.
86125","""496","030408001012","电力电缆","(1)名称:铜芯电力电缆敷设(2)型号:WDZD-YJY(3)规格:4*35+1*16(4)敷设方式、部位:桥架(5)电压等级(kV):0.
6/1KV","电缆敷设、揭(盖)盖板","m","143.
280078125","124.
290078125","17808.
27","""497","030408006012","电力电缆头","(1)名称:铜芯电力电缆头制作安装(2)型号:WDZD-YJY(3)规格:4*35+1*16(4)安装部位:箱内(5)电压等级(kV):0.
6/1KV","电力电缆头头制作、电缆电缆头安装、接地","个","18","195.
79015625","3524.
2225","""498","030408001013","电力电缆","(1)名称:铜芯电力电缆敷设(2)型号:WDZD-YJY(3)规格:3*10(4)敷设方式、部位:桥架(5)电压等级(kV):0.
6/1KV","电缆敷设、揭(盖)盖板","m","823.
660625","32.
65001953125","26892.
5","""499","030408006013","电力电缆头","(1)名称:铜芯电力电缆头制作安装(2)型号:WDZD-YJY(3)规格:3*10(4)安装部位:箱内(5)电压等级(kV):0.
6/1KV","电力电缆头头制作、电缆电缆头安装、接地","个","28","134.
27","3759.
5625","""500","030408001014","电力电缆","(1)名称:铜芯电力电缆敷设(2)型号:WDZD-YJY(3)规格:3*6","电缆敷设、揭(盖)盖板","m","1055.
5","25.
04001953125","26429.
72","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第60页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""4)敷设方式、部位:桥架(5)电压等级(kV):0.
6/1KV""501","030408006014","电力电缆头","(1)名称:铜芯电力电缆头制作安装(2)型号:WDZD-YJY(3)规格:3*6(4)安装部位:箱内(5)电压等级(kV):0.
6/1KV","电力电缆头头制作、电缆电缆头安装、接地","个","48","134.
27","6444.
965","""502","030408001015","电力电缆","(1)名称:铜芯电力电缆敷设(2)型号:WDZD-YJY(3)规格:4*35+1*16(4)敷设方式、部位:桥架(5)电压等级(kV):0.
6/1KV","电缆敷设、揭(盖)盖板","m","665.
620625","122.
550078125","81571.
73","""503","030408001016","电力电缆","(1)名称:矿物绝缘电力电缆敷设(2)型号:RTTW(3)规格:5*10(4)敷设方式、部位:桥架(5)电压等级(kV):0.
6/1KV(6)竖井通道内铜芯电力电缆敷设","电缆敷设、揭(盖)盖板","m","1621.
26125","123.
380078125","200031.
06","""504","030408006015","电力电缆头","(1)名称:矿物绝缘电力电缆头制作安装(2)型号:RTTW(3)规格:5*10(4)安装部位:箱内(5)电压等级(kV):0.
6/1KV","电力电缆头头制作、电缆电缆头安装、接地","个","40","134.
27","5370.
805","""505","030408001017","电力电缆","(1)名称:矿物绝缘电力电缆敷设(2)型号:RTTW(3)规格:5*16(4)敷设方式、部位:桥架(5)电压等级(kV):0.
6/1KV(6)竖井通道内铜芯电力电缆敷设","电缆敷设、揭(盖)盖板","m","100.
220078125","154.
7","15504.
03","""506","030408006016","电力电缆头","(1)名称:矿物绝缘电力电缆头制作安装(2)型号:RTTW","电力电缆头头制作、电缆电缆头安装、接地","个","8","134.
27","1074.
16","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第61页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""3)规格:5*16(4)安装部位:箱内(5)电压等级(kV):0.
6/1KV""507","030408001018","电力电缆","(1)名称:矿物绝缘电力电缆头制作安装(2)型号:RTTW(3)规格:5*6(4)安装部位:箱内(5)电压等级(kV):0.
6/1KV(6)竖井通道内铜芯电力电缆敷设","电缆敷设、揭(盖)盖板","m","861.
030625","103.
350078125","88987.
45","""508","030408006017","电力电缆头","(1)名称:矿物绝缘电力电缆头制作安装(2)型号:RTTW(3)规格:5*6(4)安装部位:箱内(5)电压等级(kV):0.
6/1KV","电力电缆头头制作、电缆电缆头安装、接地","个","16","134.
27","2148.
32","""509","030404035003","插座","(1)规格:250V/10A(2)名称:安全型二、三极插座250V/10A(3)安装方式:暗装","插座安装、接线","个","46","22.
52001953125","1035.
920625","""510","030404035004","插座","(1)规格:250V/10A(2)名称:空调插座(壁挂、带开关)(3)安装方式:暗装","插座安装、接线","个","3","27.
03001953125","81.
0900390625","""511","030404035005","插座","(1)名称:井道插座(2)安装方式:暗装","插座安装、接线","个","4","22.
52001953125","90.
080078125","""512","030411006013","接线盒","(1)名称:开关盒(2)材质:钢质(3)安装形式:暗装","本体安装","个","53","7.
0400048828125","373.
1203125","""513","030404034005","照明开关","(1)规格:250V/10A(2)名称:单联单控开关(带夜灯)(3)安装方式:暗装","插座安装、接线","个","17","20.
280009765625","344.
7603125","""514","030404034006","照明开关","(1)规格:250V/10A(2)名称:双联单","插座安装、接线","个","12","23.
29001953125","279.
48015625","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第62页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""控开关(带夜灯)(3)安装方式:暗装""515","030404034007","照明开关","(1)规格:250V/10A(2)名称:三联单控开关(带夜灯)(3)安装方式:暗装","插座安装、接线","个","5","29.
80001953125","149","""516","030404034008","照明开关","(1)规格:250V/10A(2)名称:四联单控开关(带夜灯)(3)安装方式:暗装","插座安装、接线","个","2","33.
8","67.
6","""517","030404034009","照明开关","(1)规格:250V/10A(2)名称:双触电感应开关(带消防线)","插座安装、接线","个","137","43.
9400390625","6019.
785","""518","030404034010","照明开关","(1)名称:残疾人开关","插座安装、接线","个","5","20.
72001953125","103.
600078125","""519","030411006014","接线盒","(1)名称:接线盒安装(暗装开关(插座)盒)","本体安装","个","173","7.
0400048828125","1217.
920625","""520","030412005003","荧光灯","(1)规格:1*28W(1*35W)(2)名称:单管荧光灯(3)安装形式:吸顶","本体安装","套","1","78.
01","78.
01","""521","030412005004","荧光灯","(1)规格:2*28W(2*35W)(2)名称:双管荧光灯(3)安装形式:吸顶","本体安装","套","58","107.
920078125","6259.
365","""522","030412005005","荧光灯","(1)规格:1*28W(1*35W)(2)名称:应急单管荧光灯(3)安装形式:吸顶","本体安装","套","27","157.
77","4259.
7925","""523","030412005006","荧光灯","(1)规格:2*28W(2*35W)(2)名称:应急双管荧光灯(3)安装形式:吸顶","本体安装","套","6","187.
69015625","1126.
14","""524","030412004007","装饰灯","(1)名称:疏散指示灯(2)规格:5W","本体安装","套","46","117.
690078125","5413.
745","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第63页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价","""525","030412001004","普通灯具","(1)类型:24W(2)名称:胶木螺口灯座","本体安装","套","61","38.
05","2321.
05","""526","030412004008","装饰灯","(1)名称:安全出口灯(2)型号:5W","本体安装","套","83","121.
960078125","10122.
685","""527","030412001005","普通灯具","(1)名称:井道应急壁灯(2)型号:5W","本体安装","套","6","78.
07","468.
4203125","""528","030412001006","普通灯具","(1)名称:半球形防潮吸顶灯LED(18W/10W)","本体安装","套","11","176.
33015625","1939.
63125","""529","030412004009","装饰灯","(1)名称:LED吸顶灯(带应急端口)(2)型号:18W","本体安装","套","31","287.
54","8913.
745","""530","030412004010","装饰灯","(1)名称:LED吸顶灯(带应急端口)(2)型号:10W","本体安装","套","55","267.
61015625","14718.
55","""531","030412004011","装饰灯","(1)名称:应急灯(2)型号:2*5W","本体安装","套","59","120.
660078125","7118.
945","""532","030411006015","接线盒","(1)名称:灯头盒(2)材质:钢质(3)安装形式:暗装","本体安装","个","444","6.
2300048828125","2766.
1225","""533","030904003004","按钮","(1)名称:出入口目标识别设备(出入门按钮)","安装、校接线、编码、调试","个","11","13.
850009765625","152.
350078125","""534","030904003005","按钮","(1)名称:残疾人呼叫按钮","安装、校接线、编码、调试","个","1","34.
2","34.
2","""535","030404031001","小电器","(1)名称:排气扇接线盒","本体安装、焊、压接线端子、接线","个/套/台/","5","80.
1400390625","400.
7003125","""536","030412004012","装饰灯","(1)名称:火灾禁入警示器","本体安装","套","1","117.
690078125","117.
690078125","""537","030904004001","警铃","(1)名称:呼叫电铃","安装、校接线、编码、调试","个","1","134.
840078125","134.
840078125","""538","030414002002","送配电装置系统","(1)名称:输配电装置系统调试(≤1kV交流供电)","系统调试","系统","26","320.
21","8325.
46","""539","030414004001","自动投入装置","(1)自动投入装置系统调试(备用电源自动投入装置)","调试","系统/台","11","1292.
35","14215.
85","""540","030409005002","避雷网","(1)避雷网安装Φ12圆钢沿混凝土块敷设","避雷网制作、安装、跨接、混凝土块制作、补刷(喷)油漆","m","676.
850625","38","25720.
3","""541","030409005003","避雷网","(1)名称:避雷网安装(沿混凝土块","避雷网制作、安装、跨","m","1895.
70125","24.
38001953125","46217.
17","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第64页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""敷设)","接、混凝土块制作、补刷(喷)油漆""542","030409008002","等电位端子箱、测试板","(1)名称:等电位装置安装(等电位端子盒安装)","本体安装","台/块","2","52.
1200390625","104.
240078125","""智能照明工程"分项工程(17安装)""543","030404017040","配电箱","(1)规格:智能照明控制箱0.
6KVa-36L(2)名称:成套配电箱安装(3)安装方式:嵌入式","本体安装、基础型钢制作、安装、焊、压接线端子、补刷(喷)油漆、接地","台","1","13702.
89","13702.
89","""544","030411001033","配管","(1)规格:SC15(2)名称:钢管(3)接地要求:刷油防腐接地(4)配置形式:砖、混凝土结构暗配","电线管路敷设、钢索架设(拉紧装置安装)、预留沟槽、.
接地","m","6772.
73","14.
970009765625","101387.
77","""545","030411001034","配管","(1)名称:金属软管敷设(内径≤16mm每根长≤0.
5m)","电线管路敷设、钢索架设(拉紧装置安装)、预留沟槽、.
接地","m","27","45.
3700390625","1224.
990625","""546","030411006016","接线盒","(1)接线盒安装(暗装接线盒)(2)普通开关、按钮安装(空白面板安装)","本体安装","个","27","10.
1500048828125","274.
05015625","""547","030411004040","配线","(1)规格:WDZN-RVS-2*2.
5(2)名称:穿多芯软导线","配线、钢索架设(拉紧装置安装)、支持体(夹板、绝缘子、槽板等)安装","m","6910.
99","4.
88000244140625","33725.
63","""548","030411004041","配线","(1)规格:WDZN-RVS-2*2.
5(2)名称:穿多芯软导线","配线、钢索架设(拉紧装置安装)、支持体(夹板、绝缘子、槽板等)安装","m","3744.
2325","4.
57000244140625","17111.
13","""549","030412004013","装饰灯","(1)名称:疏散照明灯3W/DC36V额定光通量250lm(2)安装形式:吸顶式(靠墙柱时壁装,距地2.
5m)","本体安装","套",,,,"""550","030412004014","装饰灯","(1)名称:疏散照明灯5W/DC36V额定光通量500lm(2)安装形式:吸顶式(靠墙柱时壁装,距地2.
5m)","本体安装","套","136","317","43112","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第65页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价","""551","030412004015","装饰灯","(1)名称:疏散照明灯7W/DC36V额定光通量750lm(2)安装形式:吸顶式(靠墙柱时壁装,距地2.
5m)","本体安装","套",,,,"""552","030412004016","装饰灯","(1)名称:疏散照明灯9W/DC36V额定光通量1000lm(2)安装形式:吸顶式(靠墙柱时壁装,距地2.
5m)","本体安装","套","33","345.
6703125","11407.
11","""553","030412004017","装饰灯","(1)名称:疏散照明灯15W/DC36V额定光通量1500lm(2)安装形式:吸顶式(靠墙柱时壁装,距地2.
5m)","本体安装","套",,,,"""554","030412004018","装饰灯","(1)名称:疏散出口灯1.
0W/DC36V(2)安装形式:门洞上方10cm嵌装","本体安装","套","25","295.
20015625","7380","""555","030412004019","装饰灯","(1)名称:安全出口标志灯1.
0W/DC36V(2)安装形式:门洞上方10cm嵌装","本体安装","套","35","295.
20015625","10332","""556","030412004020","装饰灯","(1)名称:禁止入内标志灯1.
0W/DC36V(2)安装形式:门洞上方10cm嵌装","本体安装","套","5","295.
20015625","1476","""557","030412004021","装饰灯","(1)名称:出口/禁止入内标志灯1.
0W/DC36V(2)安装形式:门洞上方10cm嵌装","本体安装","套",,,,"""558","030412004022","装饰灯","(1)名称:多信息复合标志灯1.
0W/DC36V(双面)(2)安装形式:悬挂至距地3米","本体安装","套","19","295.
1","5606.
905","""559","030412004023","装饰灯","(1)名称:楼层标志灯1.
0W/DC36V(2)安装形式:距地2.
5m","本体安装","套","37","290.
92015625","10764.
05","""560","030412004024","装饰灯","(1)名称:方向标志灯0.
5W/DC36V(2)安装形式:地面嵌装","本体安装","套","222","295.
20015625","65534.
44","""561","030412004025","装饰灯","(1)名称:方向标","本体安装","套","50","290.
92015625","14546","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第66页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""志灯1.
0W/DC36V(2)安装形式:距地0.
3m""562","030412004026","装饰灯","(1)名称:方向标志灯1.
0W/DC36V(2)安装形式:悬挂至距地3m","本体安装","套","46","295.
1","13574.
61","""563","030411006017","接线盒","(1)名称:接线盒安装(接线盒暗装难燃聚氯乙烯暗装灯头盒)","本体安装","个","608","6.
2300048828125","3787.
8425","""消防电工程"分项工程(17安装)""564","030411003009","桥架","(1)名称:钢制桥架(2)规格:MR-(150+75+75)*100(3)接地要求:防腐接地","本体安装、接地","m","341.
8803125","112.
760078125","38550.
39","""565","030411003010","桥架","(1)名称:钢制桥架(2)规格:MR-(100+50+50)*100(3)接地要求:防腐接地","本体安装、接地","m","491.
9103125","89.
020078125","43789.
83","""566","030413001004","铁构件","(1)名称:桥架支撑架制作安装(2)材质:型钢(3)防腐、刷油","制作、安装、补刷(喷)油漆","kg","365.
2003125","15.
400009765625","5624.
085","""567","030411001035","配管","(1)规格:SC20(2)名称:钢管(3)接地要求:刷油防腐接地(4)配置形式:砖、混凝土结构暗配","电线管路敷设、钢索架设(拉紧装置安装)、预留沟槽、.
接地","m","8291.
445","17.
710009765625","146841.
4","""568","030411001036","配管","(1)规格:SC15(2)名称:钢管(3)接地要求:刷油防腐接地(4)配置形式:砖、混凝土结构暗配","电线管路敷设、钢索架设(拉紧装置安装)、预留沟槽、.
接地","m","478.
6703125","14.
970009765625","7165.
69","""569","030411001037","配管","(1)规格:SC32(2)名称:钢管(3)接地要求:刷油防腐接地(4)配置形式:砖、混凝土结构暗配","电线管路敷设、钢索架设(拉紧装置安装)、预留沟槽、.
接地","m","35.
16","27.
60001953125","970.
420625","""570","030411001038","配管","(1)规格:SC25(2)名称:钢管(3)接地要求:刷油防腐接地(4)配置形式:砖","电线管路敷设、钢索架设(拉紧装置安装)、预留沟槽、.
接地","m","21.
99001953125","22.
76001953125","500.
4903125","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第67页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""混凝土结构暗配""571","030411004042","配线","(1)名称:穿多芯软导线(2)规格:ZBN-RVVP-2*2.
5","配线、钢索架设(拉紧装置安装)、支持体(夹板、绝缘子、槽板等)安装","m","3605.
9525","8.
4800048828125","30578.
46","""572","030411004043","配线","(1)名称:电气配线(2)型号:ZBN-RVS(3)规格:2*1.
0mm2(4)材质:铜芯(5)配线部位:管内","配线、钢索架设(拉紧装置安装)、支持体(夹板、绝缘子、槽板等)安装","m","6281.
41","2.
77000244140625","17399.
51","""573","030411004044","配线","(1)名称:电气配线(2)型号:WDZN-BYJ(3)规格:2.
5mm2(4)材质:铜芯(5)配线部位:管内","配线、钢索架设(拉紧装置安装)、支持体(夹板、绝缘子、槽板等)安装","m","1436.
01125","3.
46000244140625","4968.
5925","""574","030411004045","配线","(1)名称:电气配线(2)型号:ZBN-BV(3)规格:2.
5mm2(4)材质:铜芯(5)配线部位:管内","配线、钢索架设(拉紧装置安装)、支持体(夹板、绝缘子、槽板等)安装","m","6274.
605","3.
06000244140625","19200.
29","""575","030411004046","配线","(1)规格:ZBN-RVVP-2*1.
5(2)名称:穿多芯软导线","配线、钢索架设(拉紧装置安装)、支持体(夹板、绝缘子、槽板等)安装","m","2015.
80125","5.
06","10199.
95","""576","030411004047","配线","(1)名称:消防电话通讯线(2)型号:ZBN-RVVP(3)规格:2*1.
0mm2(4)材质:铜芯(5)配线部位:管内","配线、钢索架设(拉紧装置安装)、支持体(夹板、绝缘子、槽板等)安装","m","543.
5","3.
97000244140625","2157.
7","""577","030411004048","配线","(1)名称:电气配线(2)型号:ZBN-RVVP(3)规格:2*2.
5mm2(4)材质:铜芯(5)配线部位:管内","配线、钢索架设(拉紧装置安装)、支持体(夹板、绝缘子、槽板等)安装","m","744.
790625","8.
4800048828125","6315.
825","""578","030411004049","配线","(1)名称:电气配线","配线、钢索架设(拉紧装","m","9009.
46","3.
26000244140625","29370.
84","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第68页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""2)型号:ZBN-BV(3)规格:2.
5mm2(4)材质:铜芯(5)配线部位:槽内","置安装)、支持体(夹板、绝缘子、槽板等)安装""579","030411004050","配线","(1)名称:电气配线(2)型号:ZBN-RVS(3)规格:2*1.
0mm2(4)材质:铜芯(5)配线部位:槽内","配线、钢索架设(拉紧装置安装)、支持体(夹板、绝缘子、槽板等)安装","m","1728.
62125","2.
52000122070313","4356.
1225","""580","030411004051","配线","(1)名称:电气配线(2)型号:ZBN-RVS(3)规格:2*15mm2(4)材质:铜芯(5)配线部位:槽内","配线、钢索架设(拉紧装置安装)、支持体(夹板、绝缘子、槽板等)安装","m","2777.
1725","3.
23000244140625","8970.
265","""581","030411004052","配线","(1)名称:消防广播线(2)型号:ZBN-RVVP(3)规格:2*1.
5mm2(4)材质:铜芯(5)配线部位:槽内","配线、钢索架设(拉紧装置安装)、支持体(夹板、绝缘子、槽板等)安装","m","5822.
15","4.
69","27305.
88","""582","030408002004","控制电缆","(1)名称:控制电缆敷设(2)型号:ZBN-KVV(3)规格:8*1.
5(4)材质:铜质(5)电压等级(kV):0.
6/1kV","电缆敷设、揭(盖)盖板","m","1551.
41125","15.
970009765625","24776.
02","""583","030408002005","控制电缆","(1)名称:控制电缆敷设(2)型号:ZBN-KVV(3)规格:12*1.
5(4)材质:铜质(5)电压等级(kV):0.
6/1kV","电缆敷设、揭(盖)盖板","m","1442.
38125","20.
26","29222.
62","""584","030408002006","控制电缆","(1)名称:控制电缆敷设(2)型号:ZBN-KVV(3)规格:8*1.
5(4)材质:铜质(5)电压等级(kV):0.
6/1kV","电缆敷设、揭(盖)盖板","m","266.
70015625","15.
970009765625","4259.
2025","""585","030408002007","控制电缆","(1)名称:控制电缆敷设(2)型号:ZBN-KVV(3)规格:2*2.
5(4)材质:铜质(5)电压等级(kV):0.
6/1kV","电缆敷设、揭(盖)盖板","m","2563.
25","8.
6500048828125","22172.
11","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第69页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价","""586","030408002008","控制电缆","(1)名称:控制电缆敷设(2)型号:ZBN-KVV(3)规格:2*1.
5(4)材质:铜质(5)电压等级(kV):0.
6/1kV","电缆敷设、揭(盖)盖板","m","45.
1200390625","7.
2400048828125","326.
67015625","""587","030904008004","模块(模块箱)","(1)总线隔离器","安装、校接线、编码、调试","个/台","72","288.
9","20800.
81","""588","030904001002","点型探测器","(1)名称:智能感烟探测器(含通用底座)","底座安装、探头安装、校接线、编码、探测器调试","个","999","96.
410078125","96313.
59","""589","030904001003","点型探测器","(1)名称:感温探测器(含通用底座)","底座安装、探头安装、校接线、编码、探测器调试","个","92","85.
75","7889","""590","030411005004","接线箱","(1)名称:消防接线箱","本体安装","个","12","275","3300","""591","080609004004","模块","(1)门禁模块","安装、调试、连接、运输","台","35","207.
27015625","7254.
45","""592","030904006002","消防报警电话插孔(电话)","(1)名称:消防固定电话","安装、校接线、编码、调试","个/部","12","2099.
09125","25189.
08","""593","030411006018","接线盒","(1)名称:接线盒(2)材质:钢制(3)规格:86H50(4)安装形式:暗装","本体安装","个","1751","6.
8700048828125","12029.
37","""594","080609004005","模块","(1)单输入模块","安装、调试、连接、运输","台","12","318.
01015625","3816.
1225","""595","080609004006","模块","(1)单输入单输出模块","安装、调试、连接、运输","台","156","380.
6603125","59382.
96","""596","030904007002","消防广播(扬声器)","(1)名称:消防广播(扬声器)安装(扬声器吸顶式(3W-5W))","安装、校接线、编码、调试","个","137","101.
260078125","13872.
62","""597","030904005002","声光报警器","(1)名称:声光报警器(2)安装方式:墙面安装","安装、校接线、编码、调试","个","97","179.
49015625","17410.
53","""598","030904003006","按钮","(1)名称:手动报警按钮(2)安装方式:墙面安装","安装、校接线、编码、调试","个","33","142.
070078125","4688.
31","""599","030904003007","按钮","(1)名称:手动报警按钮(带消防电话插孔)(2)安装方式:墙","安装、校接线、编码、调试","个","39","142.
070078125","5540.
73","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第70页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""面安装""600","030904003008","按钮","(1)名称:按钮安装(消火栓报警按钮)(2)安装方式:墙面安装","安装、校接线、编码、调试","个","92","285.
70015625","26284.
42","""601","030905001002","自动报警系统调试","(1)自动报警系统调试(512点以内)","系统调试","系统","1","20475.
63","20475.
63","""602","闽030705013004","消防控制装置","(1)消防控制装置接线(正压送风阀排烟阀防火阀)(2)接线采用金属软管保护","","台","74","34.
48","2551.
52125","""603","闽030705013005","消防控制装置","(1)消防控制装置接线消防设施电控箱(2)接线采用金属软管保护","","台","28","32.
58001953125","912.
240625","""604","闽030705013006","消防控制装置","(1)消防控制装置接线(水流指示器)(2)接线采用金属软管保护","","台","6","22.
11001953125","132.
660078125","""605","030905003004","防火控制装置调试","(1)名称:防火控制装置调试(消防电梯调试)","调试","个","2","1067.
050625","2134.
10125","""606","030905003005","防火控制装置调试","(1)名称:防火控制装置调试(一般客用电梯调试)","调试","个","2","1002.
800625","2005.
60125","""607","030905001003","自动报警系统调试","(1)自动报警系统调试(512点以内)","系统调试","系统","1","21453.
63","21453.
63","""608","030904013001","联动控制主机","(1)名称:联动控制主机","安装、校接线、调试","台","3","10166.
565","30499.
7","""609","030904013002","联动控制主机","(1)名称:手动操作盘","安装、校接线、调试","台","1","11025.
29","11025.
29","""610","030904014001","消防广播及对讲电话主机(柜)","(1)名称:总线制消防电话主机","安装、校接线、调试","台","1","6529.
87","6529.
87","""611","030904014002","消防广播及对讲电话主机(柜)","(1)名称:总线制消防广播主机","安装、校接线、调试","台","1","7069.
77","7069.
77","""612","030904015002","火灾报警控制微机(CRT)","(1)名称:消防控制室图形显示装置(彩色CRT系统)","安装、调试","台","1","31815.
21","31815.
21","""613","030904016001","备用电源及电池主机(柜)","","安装、调试","套","1","6243.
57","6243.
57","""防火门监控"分项工程(17安装)""614","030411001039","配管","(1)规格:SC20(2)名称:钢管(3)接地要求:刷油防腐接地(4)配置形式:砖、混凝土结构暗配","电线管路敷设、钢索架设(拉紧装置安装)、预留沟槽、.
接地","m","387.
6603125","17.
710009765625","6865.
465","""615","030411001040","配管","(1)名称:金属软","电线管路敷","m","20","53.
8600390625","1077.
200625","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第71页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""管敷设(内径≤20mm每根长≤0.
5m)","设、钢索架设(拉紧装置安装)、预留沟槽、.
接地""616","030411004053","配线","(1)名称:电气配线(2)型号:WDZN-BYJ(3)规格:2.
5mm2(4)材质:铜芯(5)配线部位:管内","配线、钢索架设(拉紧装置安装)、支持体(夹板、绝缘子、槽板等)安装","m","775.
320625","4","3101.
2825","""617","030411004054","配线","(1)名称:电气配线(2)型号:WDZN-BYJ(3)规格:2.
5mm2(4)材质:铜芯(5)配线部位:槽内","配线、钢索架设(拉紧装置安装)、支持体(夹板、绝缘子、槽板等)安装","m","666.
120625","3.
51000244140625","2338.
08125","""618","030411004055","配线","(1)名称:电气配线(2)型号:WDZN-RVS(3)规格:2*2.
5mm2(4)材质:铜芯(5)配线部位:管内","配线、钢索架设(拉紧装置安装)、支持体(夹板、绝缘子、槽板等)安装","m","387.
6603125","4.
88000244140625","1891.
78125","""619","030411004056","配线","(1)名称:电气配线(2)型号:WDZN-RVS(3)规格:2*2.
5mm2(4)材质:铜芯(5)配线部位:槽内","配线、钢索架设(拉紧装置安装)、支持体(夹板、绝缘子、槽板等)安装","m","333.
0603125","4.
4","1465.
46125","""620","080609004007","模块","(1)名称:常闭防火门现场监控器模块","安装、调试、连接、运输","台","34","318.
01015625","10812.
34","""621","080609004008","模块","(1)名称:常开防火门场监控器模块","安装、调试、连接、运输","台","6","427.
5","2565","""622","030411006019","接线盒","(1)名称:接线盒(2)材质:钢制(3)规格:86H50(4)安装形式:暗装","本体安装","个","40","6.
8700048828125","274.
80015625","""623","030507001002","入侵探测设备","(1)名称:防火门门磁开关(用于常闭防火门监视,内置通讯模块具有门磁开关功能)","本体安装、单体调试","套","34","420.
9903125","14313.
66","""624","030507007002","出入口执行机构设备","(1)名称:防火门","本体安装、","台","6","624.
9803125","3749.
8825","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第72页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""电动闭门器(2)用于常开防火门监视及控制,内置通讯模块,具有门磁开关电磁释放器机械闭门器功能","单体调试""625","030905003006","防火控制装置调试","(1)防火控制装置调试(电动防火门(窗))","调试","个","40","57.
3800390625","2295.
2","""626","闽030705013007","消防控制装置","(1)消防控制装置接线电动防火门(2)接线采用金属软管保护","","个","40","31.
20001953125","1248","""627","030904012001","火灾报警系统控制主机","(1)名称:防火门监控主机JB-QB-LL2001","安装、校接线、调试","台","1","9823.
96","9823.
96","""漏电火灾报警监控系统"分项工程(17安装)""628","030411001041","配管","(1)规格:SC20(2)名称:钢管(3)接地要求:砖、混凝土结构暗配(4)配置形式:刷油防腐接地","电线管路敷设、钢索架设(拉紧装置安装)、预留沟槽、.
接地","m","52.
7800390625","18.
820009765625","993.
320625","""629","030411004057","配线","(1)名称:电气配线(2)型号:ZB-RVSP(3)规格:2*2.
5mm2(4)材质:铜芯(5)配线部位:管内","配线、钢索架设(拉紧装置安装)、支持体(夹板、绝缘子、槽板等)安装","m","841.
630625","11.
510009765625","9687.
165","""630","030503006004","传感器","(1)温度传感器","本体安装和连接、通电检查、单体调整测试、系统联调","支","19","259.
59","4932.
2125","""631","030503006005","传感器","(1)剩余电流传感器","本体安装和连接、通电检查、单体调整测试、系统联调","支","19","853.
110625","16209.
09","""632","030904012002","火灾报警系统控制主机","(1)名称:电气火灾监控主机HS-S1000","安装、校接线、调试","台","1","9825.
05","9825.
05","""设备电源监控系统"分项工程(17安装)""633","030411001042","配管","(1)规格:SC20(2)名称:钢管(3)接地要求:砖、混凝土结构暗配(4)配置形式:刷油防腐接地","电线管路敷设、钢索架设(拉紧装置安装)、预留沟槽、.
接地","m","5.
04000244140625","18.
820009765625","94.
850078125","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第73页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价","""634","030503006006","传感器","(1)电压信号传感器","本体安装和连接、通电检查、单体调整测试、系统联调","支","3","655.
680625","1967.
04125","""635","030411004058","配线","(1)名称:电气配线(2)型号:WDZN-BYJ(F)(3)规格:2.
5mm2(4)材质:铜芯(5)配线部位:槽内","配线、钢索架设(拉紧装置安装)、支持体(夹板、绝缘子、槽板等)安装","m","491.
1603125","3.
51000244140625","1723.
97125","""636","030411004059","配线","(1)名称:电气配线(2)型号:WDZN-BYJ(F)(3)规格:2.
5mm2(4)材质:铜芯(5)配线部位:管内","配线、钢索架设(拉紧装置安装)、支持体(夹板、绝缘子、槽板等)安装","m","88.
874","3.
46000244140625","307.
5","""637","030411004060","配线","(1)名称:电气配线(2)型号:WDZN-RVS(3)规格:2*2.
5mm2(4)材质:铜芯(5)配线部位:槽内","配线、钢索架设(拉紧装置安装)、支持体(夹板、绝缘子、槽板等)安装","m","77.
9800390625","4.
4","343.
1103125","""638","030411004061","配线","(1)名称:电气配线(2)型号:WDZN-RVS(3)规格:2*2.
5mm2(4)材质:铜芯(5)配线部位:管内","配线、钢索架设(拉紧装置安装)、支持体(夹板、绝缘子、槽板等)安装","m","44.
3700390625","4.
88000244140625","216.
53015625","""639","030408002009","控制电缆","(1)名称:控制电缆敷设(2)型号:ZBN-KVV(3)规格:4*2.
5(4)材质:铜质(5)电压等级(kV):0.
6/1kV","电缆敷设、揭(盖)盖板","m","563.
5203125","16.
69","9405.
15","""640","030904012003","火灾报警系统控制主机","(1)名称:消防设备电源状态监控主机ZXHA","安装、校接线、调试","台","1","9767.
585","9767.
585","""气体灭火系统"分项工程(17安装)""641","030411001043","配管","(1)规格:SC40(2)名称:钢管(3)接地要求:刷油防腐接地(4)配置形式:砖、混凝土结构暗配","电线管路敷设、钢索架设(拉紧装置安装)、预留沟槽、.
接地","m","13.
220009765625","37.
39001953125","494.
3003125","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第74页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价","""642","030411001044","配管","(1)规格:SC20(2)名称:钢管(3)接地要求:刷油防腐接地(4)配置形式:砖、混凝土结构暗配","电线管路敷设、钢索架设(拉紧装置安装)、预留沟槽、.
接地","m","143.
77","17.
710009765625","2546.
17125","""643","030411004062","配线","(1)名称:电气配线(2)型号:WDZN-BYJ(3)规格:2.
5mm2(4)材质:铜芯(5)配线部位:管内","配线、钢索架设(拉紧装置安装)、支持体(夹板、绝缘子、槽板等)安装","m","298.
89015625","4","1195.
560625","""644","030411004063","配线","(1)名称:电气配线(2)型号:ZBN-RVS(3)规格:2*1.
5mm2(4)材质:铜芯(5)配线部位:管内","配线、钢索架设(拉紧装置安装)、支持体(夹板、绝缘子、槽板等)安装","m","163.
93015625","3.
5","573.
7603125","""645","030408001019","电力电缆","(1)名称:铜芯电力电缆敷设(2)型号:WDZN-KYJV(3)规格:12*2.
5(4)敷设方式、部位:管内(5)电压等级(kV):0.
6/1KV","电缆敷设、揭(盖)盖板","m","191.
26015625","31.
71001953125","6064.
85","""646","030904005003","声光报警器","(1)名称:声光报警器(2)安装方式:墙面安装","安装、校接线、编码、调试","个","8","179.
49015625","1435.
92125","""647","030904001004","点型探测器","(1)名称:感温探测器(含通用底座)","底座安装、探头安装、校接线、编码、探测器调试","个","11","85.
75","943.
25","""648","030412004027","装饰灯","(1)放气指示灯","本体安装","套","4","117.
690078125","470.
7603125","""649","030904003009","按钮","(1)名称:紧急启停按钮","安装、校接线、编码、调试","个","4","16.
120009765625","64.
4800390625","""650","030904009001","区域报警控制箱","(1)气体灭火现场控制器","本体安装、校接线、摇测绝缘电阻、排线、绑扎、导线标识、显示器安装、调试","台","8","4513.
89","36111.
12","""651","030411006020","接线盒","(1)名称:接线盒安装(暗装接线盒)","本体安装","个","56","6.
2100048828125","347.
7603125","""652","030904007003","消防广播(扬声器)","(1)名称:消防广","安装、校接","个","6","103.
820078125","622.
92","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第75页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""播(扬声器)安装(扬声器吸顶式(3W-5W))","线、编码、调试""653","030904006003","消防报警电话插孔(电话)","(1)名称:消防电话分机(2)安装方式:墙面安装","安装、校接线、编码、调试","个/部","2","97.
530078125","195.
06015625","""无管网灭火系统"分项工程(17安装)""654","030902009001","无管网气体灭火装置","(1)配电房1(2)采用AQR5/SL(S型热气溶胶灭火装置)每套灭火剂用量为80kg(3)组合方式单台,具体尺寸:900*400*800mm","安装、调试","套","8","5933.
27","47466.
16","""655","030902009002","无管网气体灭火装置","(1)配电房2(2)采用AQR5/SL(S型热气溶胶灭火装置)每套灭火剂用量为60kg(3)组合方式单台,具体尺寸:900*400*800mm","安装、调试","套","6","4725.
0725","28350.
42","""656","030905004001","气体灭火系统装置调试","(1)类型:气体灭火系统装置调试(2)安装部位:试验容器规格70L","模拟喷气试验、备用灭火器贮存容器切换操作试验、气体试喷","点","6","757.
870625","4547.
2225","""657","030905004002","气体灭火系统装置调试","(1)类型:气体灭火系统装置调试(2)安装部位:试验容器规格90L","模拟喷气试验、备用灭火器贮存容器切换操作试验、气体试喷","点","8","943.
490625","7547.
925","""消火栓水工程"分项工程(17安装)""658","030901002003","消火栓钢管","(1)安装部位:室内(2)材质、规格:内外壁热浸镀锌钢管DN150(P=1.
0MPa)(3)连接形式:沟槽式连接(4)压力试验及冲洗设计要求:管道冲洗、试压(5)管道标识设计要求:红色","管道及管件安装、钢管镀锌、压力试验、冲洗、管道标识","m","734.
260625","234.
14015625","171919.
64","""659","030901002004","消火栓钢管","(1)安装部位:室内(2)材质、规格:内外壁热浸镀锌钢管DN100(P=1.
0MPa)","管道及管件安装、钢管镀锌、压力试验、冲洗、管道标识","m","212.
08015625","157.
64","33432.
29","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第76页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""3)连接形式:沟槽式连接(4)压力试验及冲洗设计要求:管道冲洗、试压(5)管道标识设计要求:红色""660","030901002005","消火栓钢管","(1)安装部位:室内(2)材质、规格:内外壁热浸镀锌钢管DN65(P=1.
0MPa)(3)连接形式:沟槽式连接(4)压力试验及冲洗设计要求:管道冲洗、试压(5)管道标识设计要求:红色","管道及管件安装、钢管镀锌、压力试验、冲洗、管道标识","m","571.
1603125","94.
240078125","53826.
12","""661","031002003019","套管","(1)名称、类型:一般钢套管制作安装DN100","制作、安装、除锈、刷油","个","6","91.
880078125","551.
2803125","""662","030413003023","打洞(孔)","(1)名称:预留孔洞(混凝土楼板)DN100","开孔、洞、恢复处理","个","6","11.
270009765625","67.
6200390625","""663","031002003020","套管","(1)名称、类型:一般钢套管制作安装DN150","制作、安装、除锈、刷油","个","2","148.
39","296.
78","""664","030413003024","打洞(孔)","(1)名称:预留孔洞(混凝土楼板)DN150","开孔、洞、恢复处理","个","2","14.
780009765625","29.
56001953125","""665","031002003021","套管","(1)名称、类型:一般钢套管制作安装DN65","制作、安装、除锈、刷油","个","2","50.
5","101","""666","030413003025","打洞(孔)","(1)名称:预留孔洞(混凝土楼板)DN65","开孔、洞、恢复处理","个","2","8.
8600048828125","17.
720009765625","""667","031003002001","螺纹法兰阀门","(1)止回阀DN150","安装、电气接线、调试","个","3","1776.
69125","5330.
07","""668","031003002002","螺纹法兰阀门","(1)闸阀DN150","安装、电气接线、调试","个","27","1158.
220625","31271.
94","""669","031003002003","螺纹法兰阀门","(1)闸阀DN100","安装、电气接线、调试","个","28","623.
67","17462.
76","""670","031003002004","螺纹法兰阀门","(1)安全阀DN150","安装、电气接线、调试","个","3","3310","9930","""671","030901010003","室内消火栓","(1)嵌墙安装(2)室内消火栓单栓采用SG24B65Z-J铝合金箱,箱内配DN65消火栓口一个,衬胶水龙带(L=25m,直径65mm)一条,QZ19水枪一支,","箱体及消火栓安装、配件安装","套","50","1356.
23125","67811.
5","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第77页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""3)消防软管卷盘一19软管长30m,安装详15S202-13(4)每个消火栓处设有消防报警按钮.
"672","030901013002","灭火器","(1)手提式磷酸铵盐干粉灭火器MF/ABC4","设置","组","134","300.
02015625","40202.
68","""673","010101007005","管沟土方","(1)管道挖土方(管道挖填土方管道公称直径200mm以内1m深)","排地表水、土方开挖、围护(挡土板)、支撑、运输、回填","m","13.
960009765625","84.
400078125","1178.
220625","""674","031201001008","管道刷油","(1)油漆品种:热沥青(2)涂刷遍数、漆膜厚度:两遍","除锈、调配、涂刷","m2","7.
2350048828125","38.
3","277.
1","""675","031201001009","管道刷油","(1)油漆品种:调和漆、红丹漆(2)涂刷遍数、漆膜厚度:两遍","除锈、调配、涂刷","m2","594.
104","17.
290009765625","10272.
065","""676","030901012001","消防水泵接合器","(1)SQS150水泵接合器DN150","安装、安装","套","3","3005.
9025","9017.
7","""677","030905002002","水灭火控制装置调试","(1)水灭火控制装置调试(消火栓灭火系统)","调试","点","92","220.
34015625","20271.
29","""喷淋工程"分项工程(17安装)""678","030901001005","水喷淋钢管","(1)安装部位:室内(2)材质、规格:内外壁热浸镀锌钢管DN150(P=1.
0MPa)(3)连接形式:沟槽式连接(4)压力试验及冲洗设计要求:管道冲洗、试压(5)管道标识设计要求:红色","管道及管件安装、钢管镀锌、压力试验、冲洗、管道标识","m","843.
130625","234.
14015625","197410.
46","""679","030901001006","水喷淋钢管","(1)安装部位:室内(2)材质、规格:内外壁热浸镀锌钢管DN100(P=1.
0MPa)(3)连接形式:沟槽式连接(4)压力试验及冲洗设计要求:管道冲洗、试压(5)管道标识设计要求:红色","管道及管件安装、钢管镀锌、压力试验、冲洗、管道标识","m","214.
44015625","157.
64","33804.
34","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第78页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价","""680","030901001007","水喷淋钢管","(1)安装部位:室内(2)材质、规格:内外壁热浸镀锌钢管DN80(P=1.
0MPa)(3)连接形式:沟槽式连接(4)压力试验及冲洗设计要求:管道冲洗、试压(5)管道标识设计要求:红色","管道及管件安装、钢管镀锌、压力试验、冲洗、管道标识","m","781.
850625","111.
190078125","86933.
9","""681","030901001008","水喷淋钢管","(1)安装部位:室内(2)材质、规格:内外壁热浸镀锌钢管DN65(P=1.
0MPa)(3)连接形式:沟槽式连接(4)压力试验及冲洗设计要求:管道冲洗、试压(5)管道标识设计要求:红色","管道及管件安装、钢管镀锌、压力试验、冲洗、管道标识","m","457.
0103125","94.
240078125","43068.
62","""682","030901001009","水喷淋钢管","(1)安装部位:室内(2)材质、规格:内外壁热浸镀锌钢管DN50(P=1.
0MPa)(3)连接形式:螺纹连接(4)压力试验及冲洗设计要求:管道冲洗、试压(5)管道标识设计要求:红色","管道及管件安装、钢管镀锌、压力试验、冲洗、管道标识","m","835.
230625","95.
980078125","80165.
38","""683","030901001010","水喷淋钢管","(1)安装部位:室内(2)材质、规格:内外壁热浸镀锌钢管DN40(P=1.
0MPa)(3)连接形式:螺纹连接(4)压力试验及冲洗设计要求:管道冲洗、试压(5)管道标识设计要求:红色","管道及管件安装、钢管镀锌、压力试验、冲洗、管道标识","m","384.
4003125","72.
2700390625","27780.
59","""684","030901001011","水喷淋钢管","(1)安装部位:室内(2)材质、规格:内外壁热浸镀锌钢管DN32(P=1.
0MPa)","管道及管件安装、钢管镀锌、压力试验、冲洗、管道标识","m","1496.
85125","63.
7800390625","95469.
09","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第79页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""3)连接形式:螺纹连接(4)压力试验及冲洗设计要求:管道冲洗、试压(5)管道标识设计要求:红色""685","030901001012","水喷淋钢管","(1)安装部位:室内(2)材质、规格:内外壁热浸镀锌钢管DN25(P=1.
0MPa)(3)连接形式:螺纹连接(4)压力试验及冲洗设计要求:管道冲洗、试压(5)管道标识设计要求:红色","管道及管件安装、钢管镀锌、压力试验、冲洗、管道标识","m","5516.
27","52.
2600390625","288280.
27","""686","031002001005","管道支架","(1)材质:型钢(2)管架形式:一般管道支架","制作、安装","kg","4030.
512","17.
83","71864.
03","""687","031201003005","金属结构刷油","(1)除锈级别:轻锈(2)油漆品种:红丹防锈漆调和漆(3)结构类型:金属结构(4)涂刷遍数、漆膜厚度:各两遍","除锈、调配、涂刷","kg","4030.
512","2.
26","9108.
96","""688","031201001010","管道刷油","(1)油漆品种:调和漆、红丹漆(2)涂刷遍数、漆膜厚度:两遍","除锈、调配、涂刷","m2","1833.
986","17.
890009765625","32810.
01","""689","031003001014","螺纹阀门","(1)类型:铜质截止阀(2)规格、压力等级:DN50(P=1.
6MPa)(3)连接形式:螺纹连接","安装、电气接线、调试","个","5","279.
5","1397.
5","""690","031003001015","螺纹阀门","(1)类型:铜质截止阀(2)规格、压力等级:DN25(P=1.
6MPa)(3)连接形式:螺纹连接","安装、电气接线、调试","个","6","44.
6900390625","268.
14015625","""691","031003001016","螺纹阀门","(1)类型:自动排气阀(2)规格、压力等级:DN50(P=1.
6MPa)(3)连接形式:螺纹连接","安装、电气接线、调试","个","4","281.
65","1126.
6","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第80页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价","""692","030901004001","报警装置","(1)名称:ZSFU150湿式报警阀(2)型号、规格:DN150(P=1.
6MPa)(3)配沟槽式法兰、精制六角带帽螺栓带垫","安装、电气接线、调试","组","4","3628.
9525","14515.
81","""693","031003003001","焊接法兰阀门","(1)类型:信号阀(2)规格、压力等级:DN150(P=1.
6MPa)(3)连接形式:沟槽法兰连接(4)带启闭标志","安装、电气接线、调试","个","14","1585.
58125","22198.
12","""694","031003003002","焊接法兰阀门","(1)类型:闸阀(2)规格、压力等级:DN150(P=1.
6MPa)(3)连接形式:沟槽法兰连接(4)带启闭标志","安装、电气接线、调试","个","8","1519.
41125","12155.
29","""695","030901006001","水流指示器","(1)规格、型号:水流指示器DN150(P=1.
0MPa)(2)连接形式:沟槽法兰连接","安装、电气接线、调试","个","6","854.
340625","5126.
0425","""696","030901007001","减压孔板","(1)材质、规格:减压孔板DN150(P=1.
0MPa)(2)连接形式:沟槽法兰连接(3)直径43~75","安装、电气接线、调试","个","5","366.
4403125","1832.
20125","""697","030901008001","末端试水装置","(1)规格:末端试水装置DN25A型(P=1.
0MPa)(2)组装形式:(成套含试水接头、铜质截止阀)","安装、电气接线、调试","组","4","252.
96015625","1011.
840625","""698","030601002004","压力仪表","(1)名称:压力表(2)型号:型号为Y-100,表的量程为工作压力的2.
0-2.
5倍(3)压力表弯材质、规格:铜质(4)挠性管材质、规格:铜质(5)调试要求:符合规范及设计要求(6)脱脂要求:符合规范及设计要求","本体安装、压力表弯制作、安装、挠性管安装、取源部件配合安装、单体校验调整、脱脂、支架制作、安装","台","6","117.
450078125","704.
700625","""699","030901003002","水喷淋(雾)喷头","(1)安装部位:室内(2)材质、型号、","安装、装饰盘安装、严密性试验","个","3114","48.
6600390625","151527.
24","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第81页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""规格:直立型喷头DN25,K=80(3)装饰盘设计要求:距顶板底75~150mm""700","030817005001","钢制排水漏斗制作安装","(1)形式、材质:钢制试水漏斗(2)口径规格:DN80","制作、安装","个","4","148.
73","594.
92","""701","030905002003","水灭火控制装置调试","(1)水灭火控制装置调试(自动喷水灭火系统)","调试","点","6","312.
80015625","1876.
80125","""通风排烟工程"分项工程(17安装)""702","030108003001","轴流通风机","(1)名称:斜流风机(2)型号:GXF-II-4B(3)规格:L=15320m3/h,H=404Pa,r=1450rpm,N=3KW,81dB(A)(4)落地式安装","本体安装、拆装检查、减振台座制作、安装、二次灌浆、单机试运转、补刷(喷)油漆","台","1","4920.
0125","4920.
0125","""703","030108003002","轴流通风机","(1)名称:斜流风机(2)型号:GXF-II-5A-2(3)规格:风量:5009m3/h,功率0.
75kW,全压:337Pa,转速1450rpm,效率:0.
66,噪声2203m3/h,风压>840Pa","安装","个","1","3473.
7325","3473.
7325","""1604","030703020006","消声器","(1)名称:阻抗式消声器(2)规格:600*500*250(3)支架形式、材质:支架制作安装","消声器制作、消声器安装、支架制作安装","个","1","1898.
04125","1898.
04125","""战时给水"分项工程(17安装)""1605","031001007011","复合管","(1)安装部位:室内(2)介质:给水(3)材质、规格:内衬塑外镀锌给水管DN25","管道安装、管件安装、塑料卡固定、压力试验、吹扫、冲洗、警示带","m","46.
8400390625","59.
0200390625","2764.
5","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第188页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""4)连接形式:螺纹连接(5)压力试验及吹、洗设计要求:水压试验及水冲洗消毒","铺设""1606","031001007012","复合管","(1)安装部位:室内(2)介质:给水(3)材质、规格:内衬塑外镀锌给水管DN32(4)连接形式:螺纹连接(5)压力试验及吹、洗设计要求:水压试验及水冲洗消毒","管道安装、管件安装、塑料卡固定、压力试验、吹扫、冲洗、警示带铺设","m","25.
38001953125","80.
68","2047.
66125","""1607","031001006019","塑料管","(1)安装部位:室内(2)介质:给水(3)材质、规格:内衬塑外镀锌给水管DN40(4)连接形式:螺纹连接(5)压力试验及吹、洗设计要求:水压试验及水冲洗消毒","管道安装、管件安装、塑料卡固定、阻火圈安装、压力试验、吹扫、冲洗、警示带铺设","m","13.
360009765625","76.
7300390625","1025.
11","""1608","031001007013","复合管","(1)安装部位:室内(2)介质:给水(3)材质、规格:内衬塑外镀锌给水管DN50(4)连接形式:螺纹连接(5)压力试验及吹、洗设计要求:水压试验及水冲洗消毒","管道安装、管件安装、塑料卡固定、压力试验、吹扫、冲洗、警示带铺设","m","40.
03001953125","90.
010078125","3603.
1025","""1609","031001007014","复合管","(1)安装部位:室内(2)介质:给水(3)材质、规格:内衬塑外镀锌给水管DN65(4)压力试验及吹、洗设计要求:水压试验及水冲洗消毒","管道安装、管件安装、塑料卡固定、压力试验、吹扫、冲洗、警示带铺设","m","1","111.
860078125","111.
860078125","""1610","031201001016","管道刷油","(1)油漆品种:调和漆(2)涂刷遍数、漆膜厚度:各两遍","除锈、调配、涂刷","m2","18.
091","9.
0900048828125","164.
45015625","""1611","030815001002","管架制作安装","(1)管道支架制作","制作、安装","kg","39.
532","17.
680009765625","698.
930625","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第189页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""安装(2)材质:型钢(3)管架形式:一般管架","、弹簧管架物理性试验""1612","031201003015","金属结构刷油","(1)除锈级别:轻锈(2)油漆品种:红丹防锈漆调和漆(3)结构类型:金属结构(4)涂刷遍数、漆膜厚度:红丹防锈漆调和漆各两遍","除锈、调配、涂刷","kg","39.
532","2.
27000122070313","89.
740078125","""1613","031002003040","套管","(1)名称、类型:刚性防水套管制作安装(2)材质:普通钢板(3)规格:主管公称直径DN70","制作、安装、除锈、刷油","个","1","285.
30015625","285.
30015625","""1614","030807001001","低压螺纹阀门","(1)名称:防护闸阀(2)型号、规格:DN25(P=1.
25MPa)(3)连接形式:螺纹连接","安装、操纵装置安装、壳体压力试验、解体检查及研磨、调试","个","2","67.
1700390625","134.
340078125","""1615","030807001002","低压螺纹阀门","(1)名称:防护闸阀(2)型号、规格:DN70(P=1.
25MPa)(3)连接形式:螺纹连接","安装、操纵装置安装、壳体压力试验、解体检查及研磨、调试","个","1","412.
3403125","412.
3403125","""1616","030807001003","低压螺纹阀门","(1)名称:弹性密封闸阀(2)型号、规格:DN50(P=1.
25MPa)(3)连接形式:螺纹连接","安装、操纵装置安装、壳体压力试验、解体检查及研磨、调试","个","1","254.
96015625","254.
96015625","""1617","030807001004","低压螺纹阀门","(1)名称:截止阀(2)型号、规格:DN25(P=1.
25MPa)(3)连接形式:螺纹连接","安装、操纵装置安装、壳体压力试验、解体检查及研磨、调试","个","1","47.
9600390625","47.
9600390625","""1618","031004014025","给、排水附(配)件","(1)名称:水龙头(2)型号、规格:DN25(P=1.
25MPa)(3)连接形式:螺纹连接","安装","个","8","14.
770009765625","118.
160078125","""水泵房"单位工程(17安装)""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第190页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价","""给水系统"分项工程(17安装)""1619","030801001001","低压碳钢管","(1)材质:内外壁热浸镀锌钢管(2)规格:DN150(P=1.
6MPa)(3)连接形式、焊接方法:沟槽式连接(4)压力试验、吹扫与清洗设计要求:水压试验及水冲洗消毒","安装、压力试验、吹扫、清洗、脱脂","m","2.
34000122070313","195.
01015625","456.
3203125","""1620","030801001002","低压碳钢管","(1)材质:内外壁热浸镀锌钢管(2)规格:DN200(P=1.
6MPa)(3)连接形式、焊接方法:沟槽式连接(4)压力试验、吹扫与清洗设计要求:水压试验及水冲洗消毒","安装、压力试验、吹扫、清洗、脱脂","m","8.
7","186.
29015625","1620.
72125","""1621","030801001003","低压碳钢管","(1)材质:钢塑复合管(2)规格:DN300(P=1.
6MPa)(3)连接形式、焊接方法:沟槽式连接(4)压力试验、吹扫与清洗设计要求:水压试验及水冲洗消毒","安装、压力试验、吹扫、清洗、脱脂","m","21.
30001953125","340.
5103125","7252.
865","""1622","030801001004","低压碳钢管","(1)材质:钢塑复合管(2)规格:DN100(P=1.
6MPa)(3)连接形式、焊接方法:螺纹连接(4)压力试验、吹扫与清洗设计要求:管道冲洗、试压","安装、压力试验、吹扫、清洗、脱脂","m","14.
470009765625","189.
18015625","2737.
4325","""1623","030801001005","低压碳钢管","(1)材质:钢塑复合管(2)规格:DN15(P=1.
6MPa)(3)连接形式、焊接方法:螺纹连接(4)压力试验、吹扫与清洗设计要求:水压试验及水冲洗消毒","安装、压力试验、吹扫、清洗、脱脂","m","1","51.
0500390625","51.
0500390625","""1624","030807003007","低压法兰阀门","(1)名称:闸阀(2)型号、规格:DN100(P=1.
6MPa","安装、操纵装置安装、壳体压力试","个","4","916.
160625","3664.
6425","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第191页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""3)连接形式:沟槽法兰连接(4)带启闭标志","验、解体检查及研磨、调试""1625","030807003008","低压法兰阀门","(1)名称:闸阀(2)型号、规格:DN300(P=1.
6MPa)(3)连接形式:沟槽法兰连接(4)带启闭标志","安装、操纵装置安装、壳体压力试验、解体检查及研磨、调试","个","3","5375.
81","16127.
43","""1626","030804001004","低压碳钢管件","(1)材质:低压碳钢(2)规格:沟槽式90度弯头DN150(3)连接形式:沟槽式连接","安装、三通补强圈制作、安装","个","2","476.
4603125","952.
920625","""1627","030804001005","低压碳钢管件","(1)材质:低压碳钢(2)规格:沟槽式90度弯头DN200(3)连接形式:沟槽式连接","安装、三通补强圈制作、安装","个","2","749.
210625","1498.
42125","""1628","030804001006","低压碳钢管件","(1)材质:低压碳钢(2)规格:沟槽式90度弯头DN300(3)连接形式:沟槽式连接","安装、三通补强圈制作、安装","个","5","1835.
07125","9175.
35","""1629","030804001007","低压碳钢管件","(1)材质:低压碳钢(2)规格:沟槽式异径三通DN300*250(3)连接形式:沟槽式连接","安装、三通补强圈制作、安装","个","1","1835.
07125","1835.
07125","""1630","030804001008","低压碳钢管件","(1)材质:低压碳钢(2)规格:沟槽式正三通DN100(3)连接形式:沟槽式连接","安装、三通补强圈制作、安装","个","1","287.
59","287.
59","""1631","031003001027","螺纹阀门","(1)名称:浮球阀(2)型号、规格:DN15(P=1.
6MPa)(3)连接形式:螺纹连接","安装、电气接线、调试","个","2","13.
910009765625","27.
82001953125","""1632","031003001028","螺纹阀门","(1)名称:遥控浮球阀组(2)型号、规格:DN15(P=1.
6MPa)(3)连接形式:螺纹连接(4)阀门检查接线","安装、电气接线、调试","个","2","40.
34","80.
68","""1633","031002003041","套管","(1)类型:刚性防水套管","制作、安装、除锈、刷","个","1","341.
1003125","341.
1003125","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第192页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""2)材质:普通钢板(3)规格:主管公称直径DN100","油""1634","031002003042","套管","(1)类型:柔性防水套管(2)材质:普通钢板(3)规格:主管公称直径DN100","制作、安装、除锈、刷油","个","5","639.
7103125","3198.
5525","""1635","031002003043","套管","(1)类型:柔性防水套管(2)材质:普通钢板(3)规格:主管公称直径DN50","制作、安装、除锈、刷油","个","4","409.
4203125","1637.
68125","""1636","031002003044","套管","(1)类型:柔性防水套管(2)材质:普通钢板(3)规格:主管公称直径DN300","制作、安装、除锈、刷油","个","6","1405.
29125","8431.
745","""1637","闽030617010001","吸水喇叭口及支架制作、安装","(1)形式、材质:钢质吸水喇叭口(2)口径规格:DN200*150","","个","2","381.
1303125","762.
260625","""1638","031004014026","给、排水附(配)件","(1)名称:钢丝网罩(2)型号、规格:DN100","安装","个","1","12.
340009765625","12.
340009765625","""1639","030817005003","钢制排水漏斗制作安装","(1)名称:钢制排水漏斗制作安装(2)型号、规格:DN50","制作、安装","个","2","84.
510078125","169.
02015625","""1640","031003012002","倒流防止器","(1)名称:倒流防止器(2)型号、规格:DN100(P=1.
6MPa)(3)连接形式:螺纹连接","安装","套","1","3233.
6825","3233.
6825","""1641","030815001003","管架制作安装","(1)材质:型钢(2)管架形式:一般管架(3)弹性吊架、弹性托架安装","制作、安装、弹簧管架物理性试验","kg","73.
252","21.
20001953125","1552.
94125","""1642","031201003016","金属结构刷油","(1)除锈级别:轻锈(2)油漆品种:红丹防锈漆调和漆(3)结构类型:金属结构(4)涂刷遍数、漆膜厚度:红丹防锈漆调和漆各两","除锈、调配、涂刷","kg","73.
252","2.
27000122070313","166.
28015625","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第193页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""遍""1643","031201001017","管道刷油","(1)油漆品种:红丹防锈漆、调和漆(2)涂刷遍数、漆膜厚度:各两遍","除锈、调配、涂刷","m2","35.
292","17.
890009765625","631.
3703125","""1644","031006003001","无负压给水设备","(1)加压一区变频恒压供水(2)供水主泵:G17-6两用一备,电机功率:4kw,单台水泵流量:17m3/h,单台水泵扬程:17m,设备流量:42m3/h,出口压力:35m(3)供水小流量泵:G17-6一用,电机功率:2.
2kw,单台水泵流量:9m3/h,单台水泵扬程:17m,设备流量:42m3/h,出口压力:35m","设备安装、安装、调试、减震装置制作、安装","套","1","70370.
16","70370.
16","""消火栓水"分项工程(17安装)""1645","030109001003","离心式泵","(1)名称:室外消火栓加压泵(2)型号:XBD6/20-100(3)规格:Q=20L/s,H=57m,N=30kw,一用一备(4)减振装置形式、数量:含减震垫等(5)灌浆配合比:地脚螺栓孔灌浆","本体安装、泵拆装检查、电动机安装、二次灌装、单机试运转、补刷(喷)油漆","台","1","85512.
87","85512.
87","""1646","031006002001","稳压给水设备","(1)名称:消防稳压泵(2)型号:50FL12-15*8(3)规格:Q=12M3/h,H=120m一用一备,N=7.
5KW,立式气压罐有效容积不小于150L(4)减振装置形式、数量:含减震垫等(5)灌浆配合比:地脚螺栓孔灌浆","设备安装、安装、调试、减震装置制作、安装","套","1","38119.
56","38119.
56","""1647","030801001006","低压碳钢管","(1)材质:内外壁热浸镀锌钢管(2)规格:DN250(P=1.
6MPa)(3)连接形式、焊接方法:沟槽式连","安装、压力试验、吹扫、清洗、脱脂","m","3.
5","257.
96","902.
860625","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第194页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""接(4)压力试验、吹扫与清洗设计要求:管道冲洗、试压(5)架空管道外应注明管道名称和水流方向标识""1648","030801001007","低压碳钢管","(1)材质:内外壁热浸镀锌钢管(2)规格:DN150(P=1.
6MPa)(3)连接形式、焊接方法:沟槽式连接(4)压力试验、吹扫与清洗设计要求:管道冲洗、试压(5)架空管道外应注明管道名称和水流方向标识","安装、压力试验、吹扫、清洗、脱脂","m","45.
0900390625","195.
01015625","8793","""1649","030801001008","低压碳钢管","(1)材质:内外壁热浸镀锌钢管(2)规格:DN100(P=1.
6MPa)(3)连接形式、焊接方法:沟槽式连接(4)压力试验、吹扫与清洗设计要求:管道冲洗、试压(5)架空管道外应注明管道名称和水流方向标识","安装、压力试验、吹扫、清洗、脱脂","m","17.
230009765625","118.
980078125","2050.
03","""1650","030801001009","低压碳钢管","(1)材质:内外壁热浸镀锌钢管(2)规格:DN80(P=1.
6MPa)(3)连接形式、焊接方法:沟槽式连接(4)压力试验、吹扫与清洗设计要求:管道冲洗、试压(5)架空管道外应注明管道名称和水流方向标识","安装、压力试验、吹扫、清洗、脱脂","m","6.
4400048828125","95.
160078125","612.
83","""1651","030801001010","低压碳钢管","(1)材质:内外壁热浸镀锌钢管(2)规格:DN65(P=1.
6MPa)(3)连接形式、焊接方法:沟槽式连接(4)压力试验、吹","安装、压力试验、吹扫、清洗、脱脂","m","4.
05000244140625","79.
7000390625","322.
79","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第195页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""扫与清洗设计要求:管道冲洗、试压(5)架空管道外应注明管道名称和水流方向标识""1652","030804001009","低压碳钢管件","(1)材质:低压碳钢(2)规格:正三通DN150(3)连接形式:沟槽式连接","安装、三通补强圈制作、安装","个","7","483.
4803125","3384.
3625","""1653","030804001010","低压碳钢管件","(1)材质:低压碳钢(2)规格:沟槽式90度弯头DN150(3)连接形式:沟槽式连接","安装、三通补强圈制作、安装","个","12","476.
4603125","5717.
525","""1654","030804001011","低压碳钢管件","(1)材质:低压碳钢(2)规格:沟槽式同心异径三通DN100*65(3)连接形式:沟槽式连接","安装、三通补强圈制作、安装","个","1","287.
62015625","287.
62015625","""1655","030804001012","低压碳钢管件","(1)材质:低压碳钢(2)规格:沟槽式90度弯头DN65(3)连接形式:沟槽式连接","安装、三通补强圈制作、安装","个","2","160.
090078125","320.
18015625","""1656","030804001013","低压碳钢管件","(1)材质:低压碳钢(2)规格:沟槽式同心大小头DN80*50(3)连接形式:沟槽式连接","安装、三通补强圈制作、安装","个","2","231.
05015625","462.
1003125","""1657","030804001014","低压碳钢管件","(1)材质:低压碳钢(2)规格:沟槽式偏心大小头DN80*50(3)连接形式:沟槽式连接","安装、三通补强圈制作、安装","个","3","231.
05015625","693.
150625","""1658","030804001015","低压碳钢管件","(1)材质:低压碳钢(2)规格:沟槽式异径三通DN100*80(3)连接形式:沟槽式连接","安装、三通补强圈制作、安装","个","2","287.
59","575.
18","""1659","030804001016","低压碳钢管件","(1)材质:低压碳钢(2)规格:沟槽式90度弯头DN100(3)连接形式:沟","安装、三通补强圈制作、安装","个","3","272.
88015625","818.
640625","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第196页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""槽式连接""1660","030804001017","低压碳钢管件","(1)材质:低压碳钢(2)规格:沟槽式90度弯头DN100(3)连接形式:沟槽式连接","安装、三通补强圈制作、安装","个","2","272.
88015625","545.
7603125","""1661","030804001018","低压碳钢管件","(1)材质:低压碳钢(2)规格:沟槽式同心大小头DN150*100(3)连接形式:沟槽式连接","安装、三通补强圈制作、安装","个","2","483.
4803125","966.
960625","""1662","030804001019","低压碳钢管件","(1)材质:低压碳钢(2)规格:沟槽式异径三通DN150*100(3)连接形式:沟槽式连接","安装、三通补强圈制作、安装","个","1","455.
1603125","455.
1603125","""1663","030804001020","低压碳钢管件","(1)材质:低压碳钢(2)规格:沟槽式90度弯头DN250(3)连接形式:沟槽式连接","安装、三通补强圈制作、安装","个","1","1363.
88125","1363.
88125","""1664","030804001021","低压碳钢管件","(1)材质:低压碳钢(2)规格:沟槽式90度弯头DN250*100(3)连接形式:沟槽式连接","安装、三通补强圈制作、安装","个","2","1363.
88125","2727.
7625","""1665","030804001022","低压碳钢管件","(1)材质:低压碳钢(2)规格:沟槽式90度弯头DN80(3)连接形式:沟槽式连接","安装、三通补强圈制作、安装","个","2","212.
34015625","424.
6803125","""1666","030807003009","低压法兰阀门","(1)名称:闸阀(2)型号、规格:DN100(P=1.
6MPa)(3)连接形式:沟槽法兰连接(4)带启闭标志","安装、操纵装置安装、壳体压力试验、解体检查及研磨、调试","个","7","916.
160625","6413.
125","""1667","030807003010","低压法兰阀门","(1)名称:闸阀(2)型号、规格:DN65(P=1.
6MPa)(3)连接形式:沟槽法兰连接(4)带启闭标志","安装、操纵装置安装、壳体压力试验、解体检查及研磨、调试","个","1","564.
56","564.
56","""1668","030807003011","低压法兰阀门","(1)名称:闸阀(2)型号、规格:DN150(P=1.
6MPa","安装、操纵装置安装、壳体压力试","个","7","1505.
5","10538.
5","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第197页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""3)连接形式:沟槽法兰连接(4)带启闭标志","验、解体检查及研磨、调试""1669","030807003012","低压法兰阀门","(1)名称:缓闭式止回阀(2)型号、规格:DN150(P=1.
6MPa)(3)连接形式:沟槽法兰连接(4)带启闭标志","安装、操纵装置安装、壳体压力试验、解体检查及研磨、调试","个","2","1393.
79125","2787.
5825","""1670","030807003013","低压法兰阀门","(1)名称:缓闭式止回阀(2)型号、规格:DN80(P=1.
6MPa)(3)连接形式:沟槽法兰连接(4)带启闭标志","安装、操纵装置安装、壳体压力试验、解体检查及研磨、调试","个","2","739.
640625","1479.
28125","""1671","030807003014","低压法兰阀门","(1)名称:闸阀(2)型号、规格:DN80(P=1.
6MPa)(3)连接形式:沟槽法兰连接(4)带启闭标志","安装、操纵装置安装、壳体压力试验、解体检查及研磨、调试","个","4","711.
630625","2846.
5225","""1672","030807003015","低压法兰阀门","(1)名称:闸阀(2)型号、规格:DN250(P=1.
6MPa)(3)连接形式:沟槽法兰连接(4)带启闭标志","安装、操纵装置安装、壳体压力试验、解体检查及研磨、调试","个","2","4148.
5125","8297.
025","""1673","030807003016","低压法兰阀门","(1)名称:水锤消除器(2)型号、规格:DN150(P=1.
6MPa)(3)连接形式:沟槽法兰连接(4)带启闭标志","安装、操纵装置安装、壳体压力试验、解体检查及研磨、调试","个","2","3963.
2925","7926.
585","""1674","030807005001","低压安全阀门","(1)名称:安全泄压阀(2)型号、规格:DN100(P=1.
8MPa)(3)连接形式:沟槽法兰连接","安装、壳体压力试验、解体检查及研磨、调试","个","1","2091.
7","2091.
7","""1675","030601004002","流量仪表","(1)名称:流量开关(2)型号、规格:最大流程为60L/S(3)连接形式:沟槽法兰连接(4)带启闭标志","配合安装、节流装置配合安装、辅助容器制作、安装、挠性管安装、取源部件配合安装、单体调试、脱脂、支架制","台","1","1135.
450625","1135.
450625","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第198页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""作、安装、保护(温)箱安装(包括开孔)、.
防雨罩制作、安装""1676","030601004003","流量仪表","(1)名称:流量开关(2)型号、规格:最大流程为94L/S(3)连接形式:沟槽法兰连接(4)带启闭标志","配合安装、节流装置配合安装、辅助容器制作、安装、挠性管安装、取源部件配合安装、单体调试、脱脂、支架制作、安装、保护(温)箱安装(包括开孔)、.
防雨罩制作、安装","台","1","1846.
22125","1846.
22125","""1677","030601002007","压力仪表","(1)名称:压力表(2)型号:型号为Y-100,表的量程为工作压力的2.
0-2.
5倍(3)压力表弯材质、规格:铜质(4)挠性管材质、规格:铜质(5)调试要求:符合规范及设计要求(6)脱脂要求:符合规范及设计要求","本体安装、压力表弯制作、安装、挠性管安装、取源部件配合安装、单体校验调整、脱脂、支架制作、安装","台","7","266.
24015625","1863.
68125","""1678","030601002008","压力仪表","(1)压力仪表(压力开关)","本体安装、压力表弯制作、安装、挠性管安装、取源部件配合安装、单体校验调整、脱脂、支架制作、安装","台","1","99.
090078125","99.
090078125","""1679","031003010003","软接头(软管)","(1)材质:可曲挠软接头(2)规格:DN250(P=1.
6MPa)(3)连接形式:法兰连接","安装","个","2","1435.
70125","2871.
4025","""1680","031003010004","软接头(软管)","(1)材质:可曲挠软接头(2)规格:DN150(P=1.
6MPa)(3)连接形式:法","安装","个","2","584.
25","1168.
5","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第199页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""兰连接""1681","031003010005","软接头(软管)","(1)材质:可曲挠软接头(2)规格:DN80(P=1.
6MPa)(3)连接形式:法兰连接","安装","个","4","289.
06015625","1156.
240625","""1682","030815001004","管架制作安装","(1)材质:型钢(2)管架形式:一般管架(3)弹性吊架、弹性托架安装","制作、安装、弹簧管架物理性试验","kg","78.
976","31.
20001953125","2464.
05","""1683","031201003017","金属结构刷油","(1)除锈级别:轻锈(2)油漆品种:红丹防锈漆调和漆(3)结构类型:金属结构(4)涂刷遍数、漆膜厚度:红丹防锈漆调和漆各两遍","除锈、调配、涂刷","kg","78.
976","2.
27000122070313","179.
28015625","""1684","031201001018","管道刷油","(1)油漆品种:红丹防锈漆、调和漆(2)涂刷遍数、漆膜厚度:各两遍","除锈、调配、涂刷","m2","35.
292","17.
890009765625","631.
3703125","""1685","031002003045","套管","(1)类型:柔性防水套管(2)材质:普通钢板(3)规格:主管公称直径DN100","制作、安装、除锈、刷油","个","1","639.
7103125","639.
7103125","""喷淋系统"分项工程(17安装)""1686","030109001004","离心式泵","(1)名称:自动喷水加压泵(2)型号:XBD6/40-150D/3(3)规格:Q=40L/sH=71M,一用一备,N=45KW(4)减振装置形式、数量:含减震垫等(5)灌浆配合比:地脚螺栓孔灌浆","本体安装、泵拆装检查、电动机安装、二次灌装、单机试运转、补刷(喷)油漆","台","1","43999.
57","43999.
57","""1687","030801001011","低压碳钢管","(1)材质:内外壁热浸镀锌钢管(2)规格:DN250(P=1.
6MPa)(3)连接形式、焊接方法:沟槽式连接(4)压力试验、吹扫与清洗设计要","安装、压力试验、吹扫、清洗、脱脂","m","3.
62000244140625","257.
96","933.
820625","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第200页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""求:管道冲洗、试压(5)架空管道外应注明管道名称和水流方向标识""1688","030801001012","低压碳钢管","(1)材质:内外壁热浸镀锌钢管(2)规格:DN150(P=1.
6MPa)(3)连接形式、焊接方法:沟槽式连接(4)压力试验、吹扫与清洗设计要求:管道冲洗、试压(5)架空管道外应注明管道名称和水流方向标识","安装、压力试验、吹扫、清洗、脱脂","m","72.
24","195.
01015625","14087.
53","""1689","030801001013","低压碳钢管","(1)材质:内外壁热浸镀锌钢管(2)规格:DN100(P=1.
6MPa)(3)连接形式、焊接方法:沟槽式连接(4)压力试验、吹扫与清洗设计要求:管道冲洗、试压(5)架空管道外应注明管道名称和水流方向标识","安装、压力试验、吹扫、清洗、脱脂","m","17.
300009765625","118.
980078125","2058.
35125","""1690","030801001014","低压碳钢管","(1)材质:内外壁热浸镀锌钢管(2)规格:DN65(P=1.
6MPa)(3)连接形式、焊接方法:沟槽式连接(4)压力试验、吹扫与清洗设计要求:管道冲洗、试压(5)架空管道外应注明管道名称和水流方向标识","安装、压力试验、吹扫、清洗、脱脂","m","4.
05000244140625","79.
7000390625","322.
79","""1691","030804001023","低压碳钢管件","(1)材质:低压碳钢(2)规格:沟槽式90度弯头DN250*100(3)连接形式:沟槽式连接","安装、三通补强圈制作、安装","个","2","1363.
88125","2727.
7625","""1692","030804001024","低压碳钢管件","(1)材质:低压碳钢(2)规格:沟槽式90度弯头DN65","安装、三通补强圈制作、安装","个","2","160.
090078125","320.
18015625","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第201页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""3)连接形式:沟槽式连接""1693","030804001025","低压碳钢管件","(1)材质:低压碳钢(2)规格:正三通DN150(3)连接形式:沟槽式连接","安装、三通补强圈制作、安装","个","12","483.
4803125","5801.
765","""1694","030804001026","低压碳钢管件","(1)材质:低压碳钢(2)规格:沟槽式90度弯头DN150(3)连接形式:沟槽式连接","安装、三通补强圈制作、安装","个","22","476.
4603125","10482.
12","""1695","030804001027","低压碳钢管件","(1)材质:低压碳钢(2)规格:沟槽式同心大小头DN150*100(3)连接形式:沟槽式连接","安装、三通补强圈制作、安装","个","2","483.
4803125","966.
960625","""1696","030804001028","低压碳钢管件","(1)材质:低压碳钢(2)规格:沟槽式同心异径三通DN100*65(3)连接形式:沟槽式连接","安装、三通补强圈制作、安装","个","1","287.
62015625","287.
62015625","""1697","030804001029","低压碳钢管件","(1)材质:低压碳钢(2)规格:沟槽式90度弯头DN100(3)连接形式:沟槽式连接","安装、三通补强圈制作、安装","个","7","272.
88015625","1910.
16125","""1698","030807003017","低压法兰阀门","(1)名称:闸阀(2)型号、规格:DN150(P=1.
6MPa)(3)连接形式:沟槽法兰连接(4)带启闭标志","安装、操纵装置安装、壳体压力试验、解体检查及研磨、调试","个","27","1505.
5","40648.
5","""1699","030804001030","低压碳钢管件","(1)材质:低压碳钢(2)规格:沟槽式正三通DN100(3)连接形式:沟槽法兰连接","安装、三通补强圈制作、安装","个","2","287.
59","575.
18","""1700","030804001031","低压碳钢管件","(1)材质:低压碳钢(2)规格:沟槽式异径三通DN150*100(3)连接形式:沟槽式连接","安装、三通补强圈制作、安装","个","2","455.
1603125","910.
320625","""1701","030807003018","低压法兰阀门","(1)名称:闸阀(2)型号、规格:D","安装、操纵装置安装、","个","2","4148.
5125","8297.
025","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第202页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""N250(P=1.
6MPa)(3)连接形式:沟槽法兰连接(4)带启闭标志","壳体压力试验、解体检查及研磨、调试""1702","030807003019","低压法兰阀门","(1)名称:闸阀(2)型号、规格:DN100(P=1.
6MPa)(3)连接形式:沟槽法兰连接(4)带启闭标志","安装、操纵装置安装、壳体压力试验、解体检查及研磨、调试","个","5","916.
160625","4580.
8025","""1703","030807003020","低压法兰阀门","(1)名称:信号阀(2)型号、规格:DN100(P=1.
6MPa)(3)连接形式:沟槽法兰连接(4)带启闭标志","安装、操纵装置安装、壳体压力试验、解体检查及研磨、调试","个","10","1030.
75","10307.
5","""1704","030807003021","低压法兰阀门","(1)名称:雨淋阀(2)型号、规格:DN100(P=1.
6MPa)(3)连接形式:沟槽法兰连接(4)带启闭标志","安装、操纵装置安装、壳体压力试验、解体检查及研磨、调试","个","1","2542.
63125","2542.
63125","""1705","030807003022","低压法兰阀门","(1)名称:水锤消除器(2)型号、规格:DN150(P=1.
6MPa)(3)连接形式:沟槽法兰连接(4)带启闭标志","安装、操纵装置安装、壳体压力试验、解体检查及研磨、调试","个","2","3963.
2925","7926.
585","""1706","030807003023","低压法兰阀门","(1)名称:试水阀(2)型号、规格:DN65(P=1.
6MPa)(3)连接形式:沟槽法兰连接(4)带启闭标志","安装、操纵装置安装、壳体压力试验、解体检查及研磨、调试","个","1","564.
56","564.
56","""1707","031003010006","软接头(软管)","(1)材质:可曲挠软接头(2)规格:DN250(P=1.
6MPa)(3)连接形式:法兰连接","安装","个","2","1435.
70125","2871.
4025","""1708","031003010007","软接头(软管)","(1)材质:可曲挠软接头(2)规格:DN150(P=1.
6MPa)(3)连接形式:法兰连接","安装","个","2","584.
25","1168.
5","""1709","030601004004","流量仪表","(1)名称:流量开关(2)型号、规格:最大流程为94L/","配合安装、节流装置配合安装、辅助容器制作","台","4","1846.
22125","7384.
885","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第203页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""S(3)连接形式:沟槽法兰连接(4)带启闭标志","、安装、挠性管安装、取源部件配合安装、单体调试、脱脂、支架制作、安装、保护(温)箱安装(包括开孔)、.
防雨罩制作、安装""1710","030601004005","流量仪表","(1)名称:流量开关(2)型号、规格:最大流程为60L/S(3)连接形式:沟槽法兰连接(4)带启闭标志","配合安装、节流装置配合安装、辅助容器制作、安装、挠性管安装、取源部件配合安装、单体调试、脱脂、支架制作、安装、保护(温)箱安装(包括开孔)、.
防雨罩制作、安装","台","1","1135.
450625","1135.
450625","""1711","030807005002","低压安全阀门","(1)名称:安全泄压阀(2)型号、规格:DN100(P=1.
8MPa)(3)连接形式:沟槽法兰连接","安装、壳体压力试验、解体检查及研磨、调试","个","1","2091.
7","2091.
7","""1712","030901004002","报警装置","(1)名称:湿式报警装置(2)型号、规格:DN150(P=1.
0MPa)(3)配沟槽式法兰、精制六角带帽螺栓带垫","安装、电气接线、调试","组","4","3628.
9525","14515.
81","""1713","030601002009","压力仪表","(1)名称:压力表(2)型号:型号为Y-100,表的量程为工作压力的2.
0-2.
5倍(3)压力表弯材质、规格:铜质(4)挠性管材质、规格:铜质(5)调试要求:符合规范及设计要求(6)脱脂要求:符合规范及设计要求","本体安装、压力表弯制作、安装、挠性管安装、取源部件配合安装、单体校验调整、脱脂、支架制作、安装","台","9","266.
24015625","2396.
16125","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第204页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价","""1714","031002003046","套管","(1)类型:柔性防水套管(2)材质:普通钢板(3)规格:主管公称直径DN100","制作、安装、除锈、刷油","个","1","639.
7103125","639.
7103125","""1715","031002003047","套管","(1)类型:刚性防水套管(2)材质:普通钢板(3)规格:主管公称直径DN100","制作、安装、除锈、刷油","个","4","341.
1003125","1364.
40125","""1716","030815001005","管架制作安装","(1)材质:型钢(2)管架形式:一般管架(3)弹性吊架、弹性托架安装","制作、安装、弹簧管架物理性试验","kg","109.
798","32.
01001953125","3514.
6325","""1717","031201003018","金属结构刷油","(1)除锈级别:轻锈(2)油漆品种:红丹防锈漆调和漆(3)结构类型:金属结构(4)涂刷遍数、漆膜厚度:红丹防锈漆调和漆各两遍","除锈、调配、涂刷","kg","78.
976","2.
27000122070313","179.
28015625","""1718","031201001019","管道刷油","(1)油漆品种:红丹防锈漆、调和漆(2)涂刷遍数、漆膜厚度:各两遍","除锈、调配、涂刷","m2","35.
292","17.
890009765625","631.
3703125","""充电桩系统"单项工程(17房屋建筑与装饰)""安装工程"单位工程(17安装)""充电桩系统"分项工程(17安装)""1719","030416004001","电动汽车充电桩配电系统","(1)名称:快充充电桩","低压柜出线端至末端充电桩之间的柜箱、线缆、线缆载体、充电桩等设备材料安装、敷设、套管、设备支架基础制安、系统调试、成品保护、单价措施项目","点位","5","40330","201650","""1720","030416004002","电动汽车充电桩配电系统","(1)名称:慢充充电桩","低压柜出线端至末端充电桩之间的柜箱、线缆、线缆载体、充电桩等","点位","24","4578","109872","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第205页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""设备材料安装、敷设、套管、设备支架基础制安、系统调试、成品保护、单价措施项目""变配电设备"单项工程(17房屋建筑与装饰)""变配电工程"单位工程(17安装)""变配电工程"分项工程(17安装)""1721","030402017001","高压成套配电柜","(1)规格:550*1650*2200(2)名称:高压馈线柜G1/G8(3)基础型钢形式、规格:10#槽钢(4)母线配置方式:单母线","本体安装、调试、基础型钢制作、安装、补刷(喷)油漆、接地","台","2","71002.
49","142004.
98","""1722","030402017002","高压成套配电柜","(1)规格:550*1650*2200(2)名称:高压PT柜G2/G7(3)基础型钢形式、规格:10#槽钢(4)母线配置方式:单母线","本体安装、调试、基础型钢制作、安装、补刷(喷)油漆、接地","台","2","36967.
24","73934.
48","""1723","030402017003","高压成套配电柜","(1)规格:550*1650*2200(2)名称:高压进线柜G3/G6(3)基础型钢形式、规格:10#槽钢(4)母线配置方式:单母线","本体安装、调试、基础型钢制作、安装、补刷(喷)油漆、接地","台","2","88998.
39","177996.
78","""1724","030402017004","高压成套配电柜","(1)规格:550*1650*2200(2)名称:高压联络柜G4(3)基础型钢形式、规格:10#槽钢(4)母线配置方式:单母线","本体安装、调试、基础型钢制作、安装、补刷(喷)油漆、接地","台","1","72566.
63","72566.
63","""1725","030402017005","高压成套配电柜","(1)规格:550*1650*2200(2)名称:高压隔离柜G5(3)基础型钢形式、规格:10#槽钢(4)母线配置方式:单母线","本体安装、调试、基础型钢制作、安装、补刷(喷)油漆、接地","台","1","15841.
94","15841.
94","""1726","030404004001","低压开关柜(屏)","(1)规格:800*1000*2200(2)名称:低压出线柜1AA1(3)基础型钢形式","本体安装、基础型钢制作、安装、端子板安装、焊、压接","台","1","46782.
52","46782.
52","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第206页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""规格:10#槽钢","线端子、盘柜配线、端子接线、屏边安装、补刷(喷)油漆、接地""1727","030404004002","低压开关柜(屏)","(1)规格:1000*1000*2200(2)名称:低压进线柜1AA2(3)基础型钢形式、规格:10#槽钢","本体安装、基础型钢制作、安装、端子板安装、焊、压接线端子、盘柜配线、端子接线、屏边安装、补刷(喷)油漆、接地","台","1","79643.
88","79643.
88","""1728","030404004003","低压开关柜(屏)","(1)规格:1000*1000*2200(2)名称:低压进线柜1AA3(3)基础型钢形式、规格:10#槽钢","本体安装、基础型钢制作、安装、端子板安装、焊、压接线端子、盘柜配线、端子接线、屏边安装、补刷(喷)油漆、接地","台","1","79643.
88","79643.
88","""1729","030404004004","低压开关柜(屏)","(1)规格:800*1000*2200(2)名称:低压出线柜1AA4、2AA2(3)基础型钢形式、规格:10#槽钢","本体安装、基础型钢制作、安装、端子板安装、焊、压接线端子、盘柜配线、端子接线、屏边安装、补刷(喷)油漆、接地","台","2","46782.
52","93565.
04","""1730","030404004005","低压开关柜(屏)","(1)规格:800*1000*2200(2)名称:低压出线柜1AA5(3)基础型钢形式、规格:10#槽钢","本体安装、基础型钢制作、安装、端子板安装、焊、压接线端子、盘柜配线、端子接线、屏边安装、补刷(喷)油漆、接地","台","1","46782.
52","46782.
52","""1731","030402017006","高压成套配电柜","(1)规格:1000*1000*2200(2)名称:低压电容柜1AA12/13、2AA11/12(3)基础型钢形式、规格:10#槽钢(4)母线配置方式","本体安装、调试、基础型钢制作、安装、补刷(喷)油漆、接地","台","4","31881.
29","127525.
16","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第207页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""单母线""1732","030404004006","低压开关柜(屏)","(1)规格:800*1000*2200(2)名称:有源滤波柜1AA13(3)基础型钢形式、规格:10#槽钢","本体安装、基础型钢制作、安装、端子板安装、焊、压接线端子、盘柜配线、端子接线、屏边安装、补刷(喷)油漆、接地","台","1","32698.
63","32698.
63","""1733","030404004007","低压开关柜(屏)","(1)规格:800*1000*2200(2)名称:低压联络柜1AA14(3)基础型钢形式、规格:10#槽钢","本体安装、基础型钢制作、安装、端子板安装、焊、压接线端子、盘柜配线、端子接线、屏边安装、补刷(喷)油漆、接地","台","1","79643.
88","79643.
88","""1734","030404004008","低压开关柜(屏)","(1)规格:1000*1000*2200(2)名称:低压进线柜2AA1(3)基础型钢形式、规格:10#槽钢","本体安装、基础型钢制作、安装、端子板安装、焊、压接线端子、盘柜配线、端子接线、屏边安装、补刷(喷)油漆、接地","台","1","79643.
88","79643.
88","""1735","030404004009","低压开关柜(屏)","(1)规格:800*1000*2200(2)名称:低压出线柜2AA4(3)基础型钢形式、规格:10#槽钢","本体安装、基础型钢制作、安装、端子板安装、焊、压接线端子、盘柜配线、端子接线、屏边安装、补刷(喷)油漆、接地","台","1","46782.
52","46782.
52","""1736","030404004010","低压开关柜(屏)","(1)规格:800*1000*2200(2)名称:低压出线柜2AA3(3)基础型钢形式、规格:10#槽钢","本体安装、基础型钢制作、安装、端子板安装、焊、压接线端子、盘柜配线、端子接线、屏边安装、补刷(喷)油漆、接地","台","1","46782.
52","46782.
52","""1737","030404004011","低压开关柜(屏)","(1)规格:1000*10","本体安装、","台","2","79643.
88","159287.
76","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第208页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""00*2200(2)名称:低压进线柜1AA1/4AA1(3)基础型钢形式、规格:10#槽钢","基础型钢制作、安装、端子板安装、焊、压接线端子、盘柜配线、端子接线、屏边安装、补刷(喷)油漆、接地""1738","030404004012","低压开关柜(屏)","(1)规格:800*1000*2200(2)名称:低压出线柜1AA2(3)基础型钢形式、规格:10#槽钢","本体安装、基础型钢制作、安装、端子板安装、焊、压接线端子、盘柜配线、端子接线、屏边安装、补刷(喷)油漆、接地","台","1","46782.
52","46782.
52","""1739","030404004013","低压开关柜(屏)","(1)规格:1000*1000*2200(2)名称:低压电容柜3AA9/4AA8(3)基础型钢形式、规格:10#槽钢","本体安装、基础型钢制作、安装、端子板安装、焊、压接线端子、盘柜配线、端子接线、屏边安装、补刷(喷)油漆、接地","台","2","30351.
86","60703.
72","""1740","030404004014","低压开关柜(屏)","(1)规格:800*1000*2200(2)名称:有源滤波柜3AA10/4AA9(3)基础型钢形式、规格:10#槽钢","本体安装、基础型钢制作、安装、端子板安装、焊、压接线端子、盘柜配线、端子接线、屏边安装、补刷(喷)油漆、接地","台","2","32698.
63","65397.
26","""1741","030404004015","低压开关柜(屏)","(1)规格:800*1000*2200(2)名称:低压联络柜4AA10(3)基础型钢形式、规格:10#槽钢","本体安装、基础型钢制作、安装、端子板安装、焊、压接线端子、盘柜配线、端子接线、屏边安装、补刷(喷)油漆、接地","台","1","79643.
88","79643.
88","""1742","030404004016","低压开关柜(屏)","(1)规格:800*1000*2200(2)名称:低压出线柜4AA2","本体安装、基础型钢制作、安装、端子板安装","台","1","46782.
52","46782.
52","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第209页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""3)基础型钢形式、规格:10#槽钢","、焊、压接线端子、盘柜配线、端子接线、屏边安装、补刷(喷)油漆、接地""1743","030404004017","低压开关柜(屏)","(1)规格:550*1650*2200(2)名称:高压站用变柜G1/G11(3)基础型钢形式、规格:10#槽钢","本体安装、基础型钢制作、安装、端子板安装、焊、压接线端子、盘柜配线、端子接线、屏边安装、补刷(喷)油漆、接地","台","2","99204.
98","198409.
96","""1744","030404004018","低压开关柜(屏)","(1)规格:550*1650*2200(2)名称:高压PT柜G2/G12(3)基础型钢形式、规格:10#槽钢","本体安装、基础型钢制作、安装、端子板安装、焊、压接线端子、盘柜配线、端子接线、屏边安装、补刷(喷)油漆、接地","台","2","35437.
8","70875.
6","""1745","030404004019","低压开关柜(屏)","(1)规格:800*1000*2200(2)名称:低压出线柜2AA3(3)基础型钢形式、规格:10#槽钢","本体安装、基础型钢制作、安装、端子板安装、焊、压接线端子、盘柜配线、端子接线、屏边安装、补刷(喷)油漆、接地","台","4","87468.
95","349875.
8","""1746","030404004020","低压开关柜(屏)","(1)规格:550*1650*2200(2)名称:低压出线柜2AA3(3)基础型钢形式、规格:10#槽钢","本体安装、基础型钢制作、安装、端子板安装、焊、压接线端子、盘柜配线、端子接线、屏边安装、补刷(喷)油漆、接地","台","12","69473.
05","833676.
6","""1747","030404004021","低压开关柜(屏)","(1)规格:1000*800*2200(2)名称:低压双电源进线柜E1AA(3)基础型钢形式、规格:10#槽钢","本体安装、基础型钢制作、安装、端子板安装、焊、压接线端子、盘柜配线、端","台","1","54606.
54","54606.
54","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第210页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""子接线、屏边安装、补刷(喷)油漆、接地""1748","030404004022","低压开关柜(屏)","(1)规格:1000*800*2200(2)名称:低压出线柜E2AA(3)基础型钢形式、规格:10#槽钢","本体安装、基础型钢制作、安装、端子板安装、焊、压接线端子、盘柜配线、端子接线、屏边安装、补刷(喷)油漆、接地","台","1","46782.
52","46782.
52","""1749","030404004023","低压开关柜(屏)","(1)规格:800*800*2200(2)名称:低压进线柜J1AA(3)基础型钢形式、规格:10#槽钢","本体安装、基础型钢制作、安装、端子板安装、焊、压接线端子、盘柜配线、端子接线、屏边安装、补刷(喷)油漆、接地","台","1","79643.
88","79643.
88","""1750","030404004024","低压开关柜(屏)","(1)规格:800*800*2200(2)名称:低压出线柜1AA/3AA(3)基础型钢形式、规格:10#槽钢","本体安装、基础型钢制作、安装、端子板安装、焊、压接线端子、盘柜配线、端子接线、屏边安装、补刷(喷)油漆、接地","台","1","46782.
52","46782.
52","""1751","030404004025","低压开关柜(屏)","(1)规格:800*800*2200(2)名称:低压双电源柜2AA(3)基础型钢形式、规格:10#槽钢","本体安装、基础型钢制作、安装、端子板安装、焊、压接线端子、盘柜配线、端子接线、屏边安装、补刷(喷)油漆、接地","台","1","54606.
54","54606.
54","""1752","030404004026","低压开关柜(屏)","(1)规格:800*800*2200(2)名称:低压进线柜J3AA(3)基础型钢形式、规格:10#槽钢","本体安装、基础型钢制作、安装、端子板安装、焊、压接线端子、盘柜配线、端子接线、屏边安装、补刷(喷)油漆","台","1","79643.
88","79643.
88","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第211页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""接地""1753","030404004027","低压开关柜(屏)","(1)规格:800*800*2200(2)名称:低压双电源柜7AA(3)基础型钢形式、规格:10#槽钢","本体安装、基础型钢制作、安装、端子板安装、焊、压接线端子、盘柜配线、端子接线、屏边安装、补刷(喷)油漆、接地","台","1","54606.
54","54606.
54","""1754","030404004028","低压开关柜(屏)","(1)规格:800*800*2200(2)名称:低压出线柜8AA(3)基础型钢形式、规格:10#槽钢","本体安装、基础型钢制作、安装、端子板安装、焊、压接线端子、盘柜配线、端子接线、屏边安装、补刷(喷)油漆、接地","台","1","46782.
52","46782.
52","""1755","030404004029","低压开关柜(屏)","(1)规格:800*800*2200(2)名称:低压进线柜J4AA(3)基础型钢形式、规格:10#槽钢","本体安装、基础型钢制作、安装、端子板安装、焊、压接线端子、盘柜配线、端子接线、屏边安装、补刷(喷)油漆、接地","台","1","79643.
88","79643.
88","""1756","030404004030","低压开关柜(屏)","(1)规格:800*800*2200(2)名称:低压双电源柜9AA(3)基础型钢形式、规格:10#槽钢","本体安装、基础型钢制作、安装、端子板安装、焊、压接线端子、盘柜配线、端子接线、屏边安装、补刷(喷)油漆、接地","台","1","54606.
54","54606.
54","""1757","030403006001","低压封闭式插接母线槽","(1)型号:TMCS(2)容量(A):2000A(3)规格:2000A/5W(4)名称:低压封闭式母线(5)安装部位:室内(6)线制:单线","母线安装、补刷(喷)油漆","m","4.
78000244140625","5968.
85","28531.
1","""1758","030403006002","低压封闭式插接母线槽","(1)型号:TMCS(2)容量(A):1000","母线安装、补刷(喷)油","m","12.
760009765625","3907.
3425","49857.
66","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第212页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""A(3)规格:1000A/5W(4)名称:低压封闭式母线(5)安装部位:室内(6)线制:单线","漆""1759","030403006003","低压封闭式插接母线槽","(1)型号:TMCS(2)容量(A):1000A(3)规格:1000A/5W(4)名称:耐火型母线槽(5)安装部位:室内(6)线制:单线","母线安装、补刷(喷)油漆","m","9.
3400048828125","4122.
0525","38499.
95","""1760","030414008001","母线","(1)(1)母线系统调试(电压≤1kV)","调试","段","5","356.
0203125","1780.
10125","""1761","030403003001","带形母线","(1)(1)矩形铜母线安装(每相一片截面≤1000mm2)(仅计安装费)","母线安装、穿通板制作、安装、支持绝缘子、穿墙套管的耐压试验、安装、引下线安装、伸缩节安装、过渡板安装、刷分相漆","m","157.
64","44.
2300390625","6972.
425","""1762","030113008001","柴油发电机组","(1)名称:柴油发电机组400KW","本体安装、二次灌浆、单机试运转、补刷(喷)油漆","台","1","395578.
08","395578.
08","""1763","030401002001","干式变压器","(1)名称:干式变压器(2)型号:SCB9(3)容量(kV·A):1000KVA(4)干燥要求:IP20罩带风机(5)基础型钢形式、规格:-100x48x5.
3","本体安装、基础型钢制作、安装、温控箱安装、接地、网门保护门制作、安装、补刷(喷)油漆","台","2","156288.
45","312576.
9","""1764","030401002002","干式变压器","(1)名称:干式变压器(2)型号:SCB9(3)容量(kV·A):500KVA(4)干燥要求:IP20罩带风机(5)基础型钢形式、规格:-100x48x5.
3","本体安装、基础型钢制作、安装、温控箱安装、接地、网门保护门制作、安装、补刷(喷)油漆","台","2","100117.
37","200234.
74","""1765","030403007001","始端箱、分线箱","(1)(1)封闭母线","本体安装、","台","8","272.
57015625","2180.
56125","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第213页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""槽线箱安装(始端箱电流≤2000A)(安装费)","补刷(喷)油漆""1766","030403007002","始端箱、分线箱","(1)(1)封闭母线槽线箱安装(始端箱电流≤2000A)","本体安装、补刷(喷)油漆","台","2","395.
9803125","791.
960625","""1767","030414001001","电力变压器系统","(1)变压器系统调试(容量≤2000kV·A)","系统调试","系统","2","4548.
8325","9097.
665","""1768","030414004002","自动投入装置","(1)(1)自动投入装置系统调试(备用电源自动投入装置)增加遥调","调试","系统/台","1","1292.
35","1292.
35","""1769","030414002003","送配电装置系统","(1)名称:输配电装置系统调试(2)电压等级(kV):≤1kV交流供电","系统调试","系统","2","320.
21","640.
42","""1770","BC001","变配电房规范化建设标准","(1)(1)站名牌,50X35cm不锈钢板制作,并带有国家电网公司标志(2)(2)安全标识牌子,200X160mm"禁止烟火"(3)(3)安全标识牌子,200X160mm"未经许可不得入内"(4)(4)安全标识牌子,200X160mm"必须带安全帽"(5)(5)安全标识牌子,200X160mm"注意通风"(6)(6)紧急出口标识牌,350X300mm"紧急出口"(7)(7)模拟图板,120X100cm不锈钢板边框,白底红线红字,开关能体现开、合状态(8)(8)标示牌,24.
5X24.
5cm"在此工作"(9)(9)标示牌,10X20cm"禁止合闸,有人工作"(10)(10)标示牌,10X20cm"禁止合闸,线路有人工作"(11)(11)标示牌,20X24.
5cm"止步,高压危险"(12)(12)灭火器2","","项","1","37019.
02","37019.
02","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第214页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""瓶装(4瓶装)(灭火器箱上侧应悬挂灭火器标志牌,并编号注明几支)(13)(13)桌子(14)(14)椅子(15)(15)水桶(16)(16)拖把(17)(17)扫把(18)(18)绝缘垫100X50X0.
5cm(19)(19)绝缘鞋(20)(20)绝缘手套(21)(21)橱柜(22)(22)绝缘人字梯1.
5m(23)(23)安全围栏,可伸缩式围栏(24)(24)油漆用于警示线、阻塞线(25)(25)油漆用于地面(26)(26)防火复合板91cm*91cm(27)(27)凝固型防火泥298ml(28)(28)防火密封胶298ml(29)(29)电缆专用堵漏剂(30)(30)老鼠粘(31)(31)高压接地短路线JDX1-10接地线25平;接地线3*1.
5+2.
5(32)(32)低压接地短路线JDX10-25-4-1-0.
4接地线25平;接地线4*1.
5+2.
5(33)(33)高压试电笔(34)(34)玻璃钢短路器""电梯工程"单项工程(17房屋建筑与装饰)""安装工程"单位工程(17安装)""电梯工程"分项工程(17安装)""1771","030107001001","交流电梯","(1)担架电梯(无机房、无障碍电梯)DT1~4载重:1000kg;速度:1.
5m/s;井道净尺寸:2100X2500;停站数:5;","本体安装、电梯电气安装、调试、辅助项目安装、单机试运转及调试、补刷(喷)","部","4","231700","926800","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第215页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""基坑深度:1.
7m;顶层高度:5.
0m","油漆""1772","030107001002","交流电梯","(1)货梯DT5~6载重:2000kg;速度:1.
00m/s;井道净尺寸:2700X3200;停站数:3;基坑深度:1.
7m;顶层高度:4.
5m","本体安装、电梯电气安装、调试、辅助项目安装、单机试运转及调试、补刷(喷)油漆","部","2","198500","397000","""1773","030107001003","交流电梯","(1)客梯(无障碍电梯)DT7载重:1000kg;速度:1.
5m/s;井道净尺寸:2300X2300;停站数:4;基坑深度:1.
7m;顶层高度:4.
5m","本体安装、电梯电气安装、调试、辅助项目安装、单机试运转及调试、补刷(喷)油漆","部","1","180200","180200","""1774","030107001004","交流电梯","(1)客梯DT8载重:1000kg;速度:1.
5m/s;井道净尺寸:2300X2300;停站数:4;基坑深度:1.
7m;顶层高度:4.
5m","本体安装、电梯电气安装、调试、辅助项目安装、单机试运转及调试、补刷(喷)油漆","部","1","173500","173500","""1775","030107001005","交流电梯","(1)自动扶梯提升高度:4.
2m,额定速度:0.
65m/s;倾角:30°","本体安装、电梯电气安装、调试、辅助项目安装、单机试运转及调试、补刷(喷)油漆","部","4","212200","848800","""智能化工程"单项工程(17房屋建筑与装饰)""智能化工程"单位工程(17安装)""停车场管理系统"分项工程(17安装)""1776","030507016001","停车场管理设备","(1)高速道闸(含:机械控制主机、道闸控制主板、工业级电源、碳纤维圆杆)(2)抬杆速度、落杆速度为1-2秒.
(3)可装配3米铝合金圆杆、分段式碳纤维杆、八角杆.
道闸控制器内置高灵敏的升优先和遇阻反弹功能,控制器集成了地感、红外防砸接口,也可以选配带压力","本体安装、单体调试","台","2","9044.
685","18089.
37","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第216页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""波检测的防砸杆.
(4)配备开关控制盒、遥控器、RS485命令三种控制闸机升降的方式.
"1777","030507016002","停车场管理设备","(1)车辆检测器(2)工作电压110VAC/60HZ,220VAC/50HZ(可选)相对湿度<90%无冷凝(3)功率<2W温度补偿自动补偿,最高50℃/H(4)继电器输出7A/250VAC连接类型11针插脚,DIN导轨(5)频率范围20KHZ至200KHZ防护等级IP30(6)反映时间50ms探测环引线≤10米,总电阻小于10Ω,每米双绞20次(7)灵敏度0.
01%至0.
1%分三级可调电磁兼容符合EN50081-1及EN50082-2(8)探测环电感量极限值40uH至1000uH,理想值80uH至300uH(9)工作温度-35至+70℃存储温度-40至+85℃","本体安装、单体调试","套","2","1455.
02125","2910.
0425","""1778","030507016003","停车场管理设备","(1)超值卡口摄像机主机KT-vpp-bc-23(2)出入口补光抓拍一体机,LED屏显示与语音播报","本体安装、单体调试","台","2","22230.
85","44461.
7","""1779","030507016004","停车场管理设备","(1)超值卡口摄像机辅机KT-vpp-bc-24(2)出入口补光抓拍一体机","本体安装、单体调试","台","2","18372.
45","36744.
9","""1780","030501013001","网络服务器","(1)岗亭收费电脑T4900V(2)I5-84008G256G固态","本体安装、插件安装、接信号线、电源线、地线","台","1","5356.
65","5356.
65","""1781","030507016005","停车场管理设备","(1)收费岗亭","本体安装、","套","1","4794.
6325","4794.
6325","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第217页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""2)1200*1500*2400","单体调试""1782","030501017001","软件","(1)车牌识别软件V5.
1.
0.
8_en","安装、调试、试运行","套","1","5171.
19","5171.
19","""1783","030507006001","出入口控制设备","(1)信息显示屏(2)室内¢5.
0室内双色显示屏","本体安装、单体调试","台","2","2426.
8","4853.
6","""视频监控系统"分项工程(17安装)""1784","030507008001","监控摄像设备","(1)高清彩色半球摄像机IPC-L302-IR(2)网络红外半球形摄像机;1080P高清;200万像素分辨率以上;定焦,数字宽动态、三码流、9:16走廊模式;支持H.
265视频编码格式","本体安装、单体调试","台","10","1309.
060625","13090.
61","""1785","030507008002","监控摄像设备","(1)高清彩色枪式摄像机IPC-L202-IR(2)网络红外枪式一体机;1080P高清;200万像素分辨率以上;定焦,数字宽动态、三码流、9:16走廊模式;支持H.
265视频编码格式(3)支架安装","本体安装、单体调试","台","10","1458.
61125","14586.
1","""1786","030507008003","监控摄像设备","(1)高清电梯半球摄像机IPC-L302-IR(2)网络红外半球形摄像机;1080P高清;200万像素分辨率以上;定焦,数字宽动态、三码流、9:16走廊模式;支持H.
265视频编码格式","本体安装、单体调试","台","4","1309.
060625","5236.
2425","""","","机房消控中心""1787","030507009001","视频控制设备","(1)安防综合管理服务器VMS-B260-A16(2)接入管理2000台设备,4000路视频通道,16盘位存储.
接入1024Mbps、存储1024Mbps、转发1024Mbps.
","本体安装、单体调试","台","1","45746.
43","45746.
43","""1788","030507013001","录像设备","(1)名称:32路硬","本体安装、","台","4","908.
790625","3635.
1625","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第218页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""盘录像机","单体调试""1789","030501004002","存储设备","(1)网络存储专用硬盘4T","本体安装、单体调试","台","32","761.
180625","24357.
78","""1790","030507009002","视频控制设备","(1)控制键盘KB-B100-N(2)支持显示屏(3)四维摇杆控制(4)具有键盘锁定功能(5)具备多级用户权限设置(6)支持键盘级联功能(7)可进行单台或多台设备的联网控制","本体安装、单体调试","台","1","4974.
6825","4974.
6825","""1791","030507009003","视频控制设备","(1)流媒体转发服务器VMS-B260-A16(2)支持接入1024Mbps、存储1024Mbps、转发1024Mbps(3)支持标准ONVIF、GB/T28181协议(4)支持设备主从级联扩展,性能、容量线性增加(5)3个千兆以太网口、1个PCIe插槽支持多种扩展网口卡","本体安装、单体调试","台","1","45014.
38","45014.
38","""1792","030507014001","显示设备","(1)尺寸:55吋(对角线),单元尺寸(W*H*D):1213.
5*684.
3*119.
8mm,光源类型LED.
(2)显示单元间拼接缝隙≤3.
5mm.
(3)物理分辨率≥1920*1080,亮度≥500cd㎡,对比度≥1400:1,响应时间≤12ms,采用直下式LED背光源.
背光源使用寿命≥50000小时.
(4)显示单元应可提供RS232串口控制,并可通过远程控制信号处理接口总路数≥6路:支持VIDEO接口、S-VIDEO接口、YPRPB接口、HDMI","本体安装、单体调试","台","6","26518.
92","159113.
52","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第219页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""接口、DVI接口、VGA信号.
(5)定制拼接支架,材料符合RoHS规范""1793","030507014002","显示设备","(1)拼接屏控制器ADU8612-E(2)12路DVI视频输出接口,4路本地高清输入口.
单口解码能力最高可达16*1080P@30最大解码分辨率为1200W支持开窗、漫游、画中画功能","本体安装、单体调试","台","1","56503.
77","56503.
77","""1794","031101069001","网管小型机、网管工作站","(1)PC工作站(含客户端管理软件)(2)I5-84008G256G固态,客户端管理软件.
","安装、调测","套","1","7707.
99","7707.
99","""1795","030501010001","收发器","(1)光纤收发器机架MIT-2014FE(2)双电源,14槽位,5V供电","本体安装、单体调试","台","2","1516.
18125","3032.
3625","""1796","030504001001","服务器","(1)平台管理服务器(仅计安装费)","安装调试","台","1","516.
3803125","516.
3803125","""1797","030504001002","服务器","(1)流媒体服务器(仅计安装费)","安装调试","台","1","516.
3803125","516.
3803125","""1798","030504001003","服务器","(1)数据服务器(仅计安装费)","安装调试","台","1","516.
3803125","516.
3803125","""","","管材及辅材""1799","030411001086","配管","(1)材质:套接紧定式镀锌钢导管(2)规格:JDG20(3)名称:配管(4)接地要求:防腐、接地(5)配置形式:明配","电线管路敷设、钢索架设(拉紧装置安装)、预留沟槽、.
接地","m","2291.
59125","18.
930009765625","43379.
8","""1800","030413001009","铁构件","(1)材质:型钢(2)名称:一般铁构件制作安装","制作、安装、补刷(喷)油漆","kg","355.
196","17.
660009765625","6272.
765","""1801","030411001087","配管","(1)材质:金属软管(2)规格:内径≤20mm每根长≤1m(3)名称:配管(4)配置形式:明配","电线管路敷设、钢索架设(拉紧装置安装)、预留沟槽、.
接地","m","259","46.
9000390625","12147.
1","""1802","030411006036","接线盒","(1)材质:钢制(2)规格:86H50+GB(3)名称:接线盒+","本体安装","个","259","7.
5500048828125","1955.
45125","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第220页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""盖板(4)安装形式:暗装""1803","030411004107","配线","(1)材质:铜(2)规格:-2X1.
0(3)名称:多芯软导线(4)型号:RVV(5)配线形式:管内穿线(6)配线部位:室内","配线、钢索架设(拉紧装置安装)、支持体(夹板、绝缘子、槽板等)安装","m","72.
2200390625","3.
68000244140625","265.
77015625","""1804","030411004108","配线","(1)材质:铜(2)规格:-2X1.
0(3)名称:多芯软导线(4)型号:RVV(5)配线形式:线槽配线(6)配线部位:室内","配线、钢索架设(拉紧装置安装)、支持体(夹板、绝缘子、槽板等)安装","m","239.
72015625","3.
37000244140625","807.
860625","""1805","030411004109","配线","(1)材质:铜(2)规格:-2X0.
5(3)名称:多芯软导线(4)型号:ZR-RVV(5)配线形式:管内穿线(6)配线部位:室内","配线、钢索架设(拉紧装置安装)、支持体(夹板、绝缘子、槽板等)安装","m","61.
8500390625","3.
06000244140625","189.
26015625","""1806","030411004110","配线","(1)材质:铜(2)规格:-2X0.
5(3)名称:多芯软导线(4)型号:ZR-RVV(5)配线形式:线槽配线(6)配线部位:室内","配线、钢索架设(拉紧装置安装)、支持体(夹板、绝缘子、槽板等)安装","m","257.
26015625","3.
04000244140625","782.
070625","""1807","030411004111","配线","(1)材质:铜(2)规格:-2X0.
5(3)名称:多芯软导线(4)型号:ZR-RVV(5)配线形式:管内穿线(6)配线部位:室内","配线、钢索架设(拉紧装置安装)、支持体(夹板、绝缘子、槽板等)安装","m","19.
140009765625","3.
06000244140625","58.
5700390625","""1808","030502005001","双绞线缆","(1)规格:UTP6(2)名称:双绞线缆(3)敷设方式:线槽配线","敷设、标记、卡接","m","12870.
97","5.
4100048828125","69631.
89","""1809","030502005002","双绞线缆","(1)规格:UTP6(2)名称:双绞线缆(3)敷设方式:管","敷设、标记、卡接","m","2421.
61125","5.
5600048828125","13464.
15","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第221页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""内穿线""","","系统调试""1810","030507017001","安全防范分系统调试","(1)名称:安全防范分系统调试(2)类别:电视监控系统(3)通道数:314","各分系统调试","系统","1","21605.
94","21605.
94","""计算机网络系统"分项工程(17安装)""1811","030501012002","交换机","(1)24口接入交换机(2)S5720-28P-LI-AC(24个10/100/1000Base-T以太网端口,4个千兆SFP,交流供电)(3)光模块-eSFP-GE-单模模块(1310nm,10km,LC)","本体安装、单体调试","台","5","7268.
87","36344.
35","""电梯五方通话"分项工程(17安装)""","","五方通话系统""1812","030411001088","配管","(1)名称:焊接钢管(2)规格:SC20(3)配置形式:暗敷(4)接地要求:符合规范及设计要求(5)暗埋管道刨沟槽及修复","电线管路敷设、钢索架设(拉紧装置安装)、预留沟槽、.
接地","m","12.
710009765625","17.
710009765625","225.
09015625","""1813","030411001089","配管","(1)名称:电气配管(2)材质:金属软管(3)规格:DN20,长度0.
5米以内(4)配置形式:明配(5)接地要求:符合规范及设计要求","电线管路敷设、钢索架设(拉紧装置安装)、预留沟槽、.
接地","m","0.
5","46.
3600390625","23.
18001953125","""1814","030411006037","接线盒","(1)名称:接线盒(含空白面板)(桥架过线盒)(2)材质:铁质(3)规格:86H50(4)安装形式:暗装","本体安装","个","1","10","10","""1815","030411006038","接线盒","(1)名称:接线底座(2)材质:钢制(3)规格:86H50(4)安装形式:暗装","本体安装","个","1","6.
3900048828125","6.
3900048828125","""1816","030411004112","配线","(1)名称:绝缘导","配线、钢索","m","13.
510009765625","20.
63001953125","278.
71","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第222页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""线(2)型号:WDZB1-RYYP(3)规格:12x1.
5mm2(4)材质:铜芯(5)配线部位:管内穿放","架设(拉紧装置安装)、支持体(夹板、绝缘子、槽板等)安装""1817","030411004113","配线","(1)名称:绝缘导线(2)型号:WDZB1-RYYP(3)规格:12x1.
5mm2(4)材质:铜芯(5)配线部位:线槽内穿放","配线、钢索架设(拉紧装置安装)、支持体(夹板、绝缘子、槽板等)安装","m","85.
550078125","17.
680009765625","1512.
52125","""门禁对讲系统"分项工程(17安装)""","","梯位住在访客对讲电话系统""1818","030411003028","桥架","(1)材质:钢制(2)规格:MR(3)名称:安防桥架(4)型号:-100X100(5)接地要求:防腐接地","本体安装、接地","m","720.
480625","86.
5","62321.
52","""1819","030413001010","铁构件","(1)材质:型钢(2)名称:桥架支撑架制作安装(3)防腐、刷油","制作、安装、补刷(喷)油漆","kg","315.
868","16.
660009765625","5262.
365","""1820","031201003019","金属结构刷油","(1)结构类型:金属钢结构(2)除锈级别:轻绣(3)油漆品种:红丹防锈漆调和漆(4)涂刷遍数、漆膜厚度:红丹防锈漆调和漆各两遍","除锈、调配、涂刷","kg","315.
868","2.
27000122070313","717.
020625","""1821","080807013003","防火堵洞(隔板)、孔洞封堵","(1)名称:防火圈、防火包安装(阻火包安装)(2)防火堵料(电缆密封填料楼板5根以下电缆)","封堵、清理、运输","处","25","1729.
25","43231.
25","""1822","080807013004","防火堵洞(隔板)、孔洞封堵","(1)名称:电缆防火设施安装(防火隔板安装)","封堵、清理、运输","m2","0.
405000305175781","200.
91015625","81.
3700390625","""1823","030411001090","配管","(1)材质:JDG管(2)规格:外径≤32mm(3)名称:电气配","电线管路敷设、钢索架设(拉紧装置安装)、预留","m","596.
3603125","21.
55001953125","12851.
57","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第223页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""管(4)接地要求:防腐、接地(5)配置形式:暗配","沟槽、.
接地""1824","030411001091","配管","(1)材质:半硬质塑料管(2)规格:PVC16(3)名称:电气配管(4)接地要求:防腐、接地(5)配置形式:暗配","电线管路敷设、钢索架设(拉紧装置安装)、预留沟槽、.
接地","m","1737.
12125","9.
28","16120.
47","""1825","030411004114","配线","(1)材质:铜芯(2)规格:-3X1.
5(3)名称:电气配线(4)型号:RVVP(5)配线形式:管内穿线","配线、钢索架设(拉紧装置安装)、支持体(夹板、绝缘子、槽板等)安装","m","1737.
12125","10.
520009765625","18274.
5","""1826","030508001001","家居控制系统设备安装","(1)名称:可视对讲门口主机(2)规格:JB-2000IIIMGLC","本体安装、单体调试","台","4","241.
82015625","967.
280625","""1827","030508001002","家居控制系统设备安装","(1)名称:访客对讲户内机","本体安装、单体调试","台","336","164.
09015625","55134.
28","""1828","030507007004","出入口执行机构设备","(1)名称:电磁锁","本体安装、单体调试","台","4","69.
0500390625","276.
20015625","""1829","030414007001","不间断电源","(1)名称:可视对讲系统电源箱","调试","台","4","537.
2303125","2148.
92125","""1830","030904001006","点型探测器","(1)名称:可燃气体探测器","底座安装、探头安装、校接线、编码、探测器调试","个","168","135.
05","22688.
42","""1831","030904003013","按钮","(1)名称:紧急呼叫按钮","安装、校接线、编码、调试","个","168","29.
5","4956","""1832","030411006039","接线盒","(1)名称:接线盒安装(可视对讲门口主机接线盒)","本体安装","个","4","8.
12","32.
48","""1833","030411006040","接线盒","(1)名称:接线盒安装(访客对讲户内机接线盒)","本体安装","个","336","8.
12","2728.
3225","""1834","030411006041","接线盒","","本体安装","个","168","8.
3400048828125","1401.
12125","""巡更系统"分项工程(17安装)""1835","030504003001","通讯接口输入输出设备","(1)通讯座","本体安装、调试","个","1","1397.
43125","1397.
43125","""1836","030504003002","通讯接口输入输出设备","(1)巡更棒","本体安装、调试","个","3","1223.
420625","3670.
2625","""1837","030504003003","通讯接口输入输出设备","(1)巡更钮","本体安装、调试","个","20","44.
9800390625","899.
600625","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第224页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价","""1838","030501017003","软件","","安装、调试、试运行","套","1","6224.
285","6224.
285","""1839","030507017002","安全防范分系统调试","(1)名称:安全防范分系统调试(2)类别:电子巡更(3)通道数:24","各分系统调试","系统","1","2833.
1325","2833.
1325","""光纤入户系统"分项工程(17安装)""","","通信系统""1840","030411003029","桥架","(1)材质:钢制(2)规格:MR(3)名称:通信桥架(4)型号:-200X100(5)接地要求:防腐接地","本体安装、接地","m","72.
5","130.
210078125","9440.
23","""1841","030411003030","桥架","(1)材质:钢制(2)规格:MR(3)名称:通信桥架(4)型号:50*50(5)接地要求:防腐接地","本体安装、接地","m","727.
440625","56.
7300390625","41267.
67","""1842","030413001011","铁构件","(1)材质:型钢(2)名称:桥架支撑架制作安装(3)防腐、刷油","制作、安装、补刷(喷)油漆","kg","309.
236","16.
640009765625","5145.
69","""1843","031201003020","金属结构刷油","(1)结构类型:金属钢结构(2)除锈级别:轻绣(3)油漆品种:红丹防锈漆调和漆(4)涂刷遍数、漆膜厚度:红丹防锈漆调和漆各两遍","除锈、调配、涂刷","kg","309.
236","2.
27000122070313","701.
970625","""1844","080807013005","防火堵洞(隔板)、孔洞封堵","(1)名称:防火圈、防火包安装(阻火包安装)(2)防火堵料(电缆密封填料楼板5根以下电缆)","封堵、清理、运输","处","25","1729.
25","43231.
25","""1845","080807013006","防火堵洞(隔板)、孔洞封堵","(1)名称:电缆防火设施安装(防火隔板安装)","封堵、清理、运输","m2","0.
405000305175781","200.
91015625","81.
3700390625","""1846","030411001092","配管","(1)材质:半硬质塑料管(2)规格:PVC20(3)名称:电气配管(4)接地要求:防腐、接地(5)配置形式:暗","电线管路敷设、钢索架设(拉紧装置安装)、预留沟槽、.
接地","m","2181.
16125","10.
940009765625","23861.
89","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第225页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""配""1847","030411005012","接线箱","(1)AX-BS01(2)信息配线箱(3)暗装","本体安装","个","39","263.
02015625","10257.
78","""1848","030502005003","双绞线缆","(1)规格:UTP-5e(2)名称:双绞线缆(3)敷设方式:管内穿放","敷设、标记、卡接","m","1009.
737","4.
89","4937.
61","""1849","030411005013","接线箱","(1)名称:梯位配线箱","本体安装","个","4","156.
720078125","626.
8803125","""1850","030411005014","接线箱","(1)名称:光纤分配箱","本体安装","个","19","156.
720078125","2977.
6825","""有线电视系统"分项工程(17安装)""","","有线电视系统""1851","030411003031","桥架","(1)材质:钢制(2)规格:MR(3)名称:有线电视系统桥架(4)型号:-200X100(5)接地要求:防腐接地","本体安装、接地","m","72.
5","130.
210078125","9440.
23","""1852","030411003032","桥架","(1)材质:钢制(2)规格:MR(3)名称:有线电视系统桥架(4)型号:50*50(5)接地要求:防腐接地","本体安装、接地","m","724.
080625","56.
7300390625","41077.
06","""1853","030413001012","铁构件","(1)材质:型钢(2)名称:桥架支撑架制作安装(3)防腐、刷油","制作、安装、补刷(喷)油漆","kg","308.
049","16.
65","5129.
02","""1854","031201003021","金属结构刷油","(1)结构类型:金属钢结构(2)除锈级别:轻绣(3)油漆品种:红丹防锈漆调和漆(4)涂刷遍数、漆膜厚度:红丹防锈漆调和漆各两遍","除锈、调配、涂刷","kg","308.
049","2.
27000122070313","699.
270625","""1855","080807013007","防火堵洞(隔板)、孔洞封堵","(1)名称:防火圈、防火包安装(阻火包安装)(2)防火堵料(电缆密封填料楼板5根以下电缆)","封堵、清理、运输","处","25","1729.
25","43231.
25","""1856","080807013008","防火堵洞(隔板)、孔洞封堵","(1)名称:电缆防火设施安装(防火隔板安装)","封堵、清理、运输","m2","0.
405000305175781","200.
91015625","81.
3700390625","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第226页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价","""1857","030411001093","配管","(1)材质:半硬质塑料管(2)规格:PVC20(3)名称:电气配管(4)接地要求:防腐、接地(5)配置形式:暗配","电线管路敷设、钢索架设(拉紧装置安装)、预留沟槽、.
接地","m","939.
927","10.
940009765625","10282.
8","""1858","030505005001","敷设射频同轴电缆","(1)规格:SYWV-75-5(2)名称:视频同轴电缆(3)敷设方式:管内穿放","线缆敷设","m","1913.
76125","5.
9200048828125","11329.
46","""1859","030411005015","接线箱","(1)名称:有线电视分配箱TVA","本体安装","个","4","156.
720078125","626.
8803125","""1860","030411005016","接线箱","(1)名称:有线电视分配箱TV","本体安装","个","19","156.
720078125","2977.
6825","""电子周界防护系统"分项工程(17安装)""1861","030507002002","入侵报警控制器","","本体安装、单体调试","套","1","12813.
57","12813.
57","""1862","030411005017","接线箱","(1)名称:报警联动控制箱(含单防区模块、呼出模块及DC12V电源)","本体安装","个","17","156.
720078125","2664.
2425","""1863","030507001004","入侵探测设备","","本体安装、单体调试","套","17","1161.
510625","19745.
67","""1864","030411001098","配管","(1)名称:焊接钢管(2)规格:SC20(3)配置形式:暗敷(4)接地要求:符合规范及设计要求(5)暗埋管道刨沟槽及修复","电线管路敷设、钢索架设(拉紧装置安装)、预留沟槽、.
接地","m","1740","17.
660009765625","30728.
42","""1865","030411004115","配线","(1)材质:铜(2)规格:-2X1.
5(3)名称:多芯软导线(4)型号:RVV(5)配线形式:管内穿线(6)配线部位:室内","配线、钢索架设(拉紧装置安装)、支持体(夹板、绝缘子、槽板等)安装","m","870","7.
3600048828125","6403.
205","""1866","030411004116","配线","(1)材质:铜(2)规格:-3X2.
5(3)名称:多芯软导线(4)型号:RVV(5)配线形式:管内穿线(6)配线部位:室","配线、钢索架设(拉紧装置安装)、支持体(夹板、绝缘子、槽板等)安装","m","870","7.
4800048828125","6507.
605","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第227页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""内""室外安装工程"单项工程(17房屋建筑与装饰)""室外安装工程"单位工程(17安装)""电气工程"分项工程(17安装)""1867","030404017083","配电箱","(1)配电箱AP1-JG","本体安装、基础型钢制作、安装、焊、压接线端子、补刷(喷)油漆、接地","台","1","12171.
58","12171.
58","""1868","030411001094","配管","(1)钢管敷设暗敷SC150","电线管路敷设、钢索架设(拉紧装置安装)、预留沟槽、.
接地","m","110.
880078125","173.
38015625","19224.
37","""1869","030411001095","配管","(1)钢管敷设暗敷SC100","电线管路敷设、钢索架设(拉紧装置安装)、预留沟槽、.
接地","m","186.
68015625","112.
650078125","21029.
5","""1870","030411001096","配管","(1)钢管敷设暗敷SC32","电线管路敷设、钢索架设(拉紧装置安装)、预留沟槽、.
接地","m","1370.
10625","32.
92001953125","45103.
86","""1871","030411001097","配管","(1)钢管敷设暗敷SC25","电线管路敷设、钢索架设(拉紧装置安装)、预留沟槽、.
接地","m","330.
0703125","27.
54001953125","9090.
13","""1872","030408001051","电力电缆","(1)室内铜芯电力电缆敷设YJY-0.
6/1KV-4X50+1x25","电缆敷设、揭(盖)盖板","m","10","174.
01015625","1740.
10125","""1873","030408001052","电力电缆","(1)室内铜芯电力电缆敷设YJV-3*4","电缆敷设、揭(盖)盖板","m","339.
0903125","19.
480009765625","6605.
47","""1874","030408001053","电力电缆","(1)室内铜芯电力电缆敷设YJV-5*4","电缆敷设、揭(盖)盖板","m","971.
585625","25.
92001953125","25183.
48","""1875","030408006045","电力电缆头","(1)1KV以下室内干包式铜芯电力电缆YJY-0.
6/1KV-4X50+1x25","电力电缆头头制作、电缆电缆头安装、接地","个","1","151.
73","151.
73","""1876","030412007001","一般路灯","(1)路灯LED70W(2)C25浇制杆塔基础(杆塔单基预拌非泵送普通混凝土量≤10m3)(3)塔器地脚螺栓制作(直径20mm以内)(4)现浇混凝土(圆钢筋φ10以内","基础制作、安装、立灯杆、杆座安装、灯架及灯具安装、焊、压接线端子、补刷(喷)油漆、灯杆编号、接地","套","8","3004.
9425","24039.
54","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第228页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价","""1877","030412007003","一般路灯","(1)路灯LED70W(2)C25浇制杆塔基础(杆塔单基预拌非泵送普通混凝土量≤10m3)(3)塔器地脚螺栓制作(直径20mm以内)(4)现浇混凝土(圆钢筋φ10以内)","基础制作、安装、立灯杆、杆座安装、灯架及灯具安装、焊、压接线端子、补刷(喷)油漆、灯杆编号、接地","套","4","1916.
20125","7664.
805","""1878","030411006042","接线盒","(1)接线盒安装(接线盒暗装难燃聚氯乙烯暗装灯头盒)","本体安装","个","12","6.
1300048828125","73.
5600390625","""","","预埋强电管""1879","040101002001","挖沟槽土方","(1)人工挖沟槽土方(三类土槽深2m以内)人工辅助开挖比例≤5%(2)小型挖掘机挖土(小型挖掘机挖槽坑土方不装车三类土)土石方项目工程量在2000m3以内","排地表水、土方开挖、围护(挡土板)及拆除、基底钎探、场内运输","m3","606.
721","6.
5600048828125","3980.
0925","""1880","040103001001","填方","(1)槽、坑回填土(夯实机夯实)","运输、回填、压实","m3","606.
721","10.
12","6140.
025","""","","预埋通信管""1881","040101002002","挖沟槽土方","(1)人工挖沟槽土方(三类土槽深2m以内)人工辅助开挖比例≤5%(2)小型挖掘机挖土(小型挖掘机挖槽坑土方不装车三类土)土石方项目工程量在2000m3以内","排地表水、土方开挖、围护(挡土板)及拆除、基底钎探、场内运输","m3","83.
725078125","6.
5600048828125","549.
2403125","""1882","040103001002","填方","(1)槽、坑回填土(夯实机夯实)","运输、回填、压实","m3","68.
237","10.
12","690.
560625","""1883","040103002001","余方弃置","(1)人工装、运土方(人工装车土方)(2)自卸汽车运土(载重10t以内运距3km以内)","余方点装料运输至弃置点","m3","5.
292","25.
53001953125","135.
100078125","""1884","040305001001","垫层","(1)C15垫层(预拌非泵送普通混凝土)","垫层铺筑","m3","6.
033","316.
44015625","1909.
08125","""1885","040305001002","垫层","(1)垫层(碎石)","垫层铺筑","m3","6.
033","251.
87015625","1519.
53125","""","","手孔井""1886","040504001001","砌筑井SK1","(1)C15排水井垫","垫层铺筑、","座","1","1636.
58125","1636.
58125","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第229页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""层(预拌非泵送普通混凝土)(2)砌筑井壁(砖砌井壁矩形)(3)井盖、井箅安装(检查井井盖、座普通铸铁)","模板制作、安装、拆除、混凝土拌和、运输、浇筑、养护、砌筑、勾缝、抹面、井圈、井盖安装、盖板安装、踏步安装、防水、止水""1887","040504001002","砌筑井SK2","(1)C15排水井垫层(预拌非泵送普通混凝土)(2)砌筑井壁(砖砌井壁矩形)(3)井盖、井箅安装(检查井井盖、座普通铸铁)","垫层铺筑、模板制作、安装、拆除、混凝土拌和、运输、浇筑、养护、砌筑、勾缝、抹面、井圈、井盖安装、盖板安装、踏步安装、防水、止水","座","4","1274.
060625","5096.
2425","""1888","040504001003","砌筑井SK3","(1)C15排水井垫层(预拌非泵送普通混凝土)(2)砌筑井壁(砖砌井壁矩形)(3)井盖、井箅安装(检查井井盖、座普通铸铁)","垫层铺筑、模板制作、安装、拆除、混凝土拌和、运输、浇筑、养护、砌筑、勾缝、抹面、井圈、井盖安装、盖板安装、踏步安装、防水、止水","座","8","914.
480625","7315.
845","""给水工程"分项工程(17安装)""","","给水系统""1889","031001006020","塑料管","(1)聚乙烯复合管DN150,电熔双密封连接(2)管道消毒、冲洗(公称直径150mm以内)","管道安装、管件安装、塑料卡固定、阻火圈安装、压力试验、吹扫、冲洗、警示带铺设","m","627.
3903125","171.
45015625","107566.
02","""1890","031001006021","塑料管","(1)聚乙烯复合管DN100,电熔双密封连接(2)管道消毒、冲洗(公称直径100mm以内)","管道安装、管件安装、塑料卡固定、阻火圈安装、压力试验、吹扫、冲洗、警示带铺设","m","19.
220009765625","177.
86015625","3418.
4725","""1891","031001006022","塑料管","(1)聚乙烯复合管","管道安装、","m","31.
75","58.
9200390625","1870.
71125","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第230页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""DN65,电熔双密封连接(2)管道消毒、冲洗(公称直径65mm以内)","管件安装、塑料卡固定、阻火圈安装、压力试验、吹扫、冲洗、警示带铺设""1892","031003020001","成品水表箱","(1)阀门箱","箱体安装、墙体修凿","个","1","218.
70015625","218.
70015625","""1893","031003002005","螺纹法兰阀门","(1)闸阀DN100","安装、电气接线、调试","个","2","628.
2303125","1256.
460625","""1894","031003002006","螺纹法兰阀门","(1)闸阀DN150","安装、电气接线、调试","个","13","1011.
200625","13145.
61","""1895","031003002007","螺纹法兰阀门","(1)闸阀DN65","安装、电气接线、调试","个","2","400.
3603125","800.
720625","""1896","031003002008","螺纹法兰阀门","(1)闸阀DN70","安装、电气接线、调试","个","2","421.
1103125","842.
220625","""1897","031003002009","螺纹法兰阀门","(1)止回阀DN100","安装、电气接线、调试","个","1","760.
510625","760.
510625","""1898","031003002010","螺纹法兰阀门","(1)止回阀DN150","安装、电气接线、调试","个","1","1260.
970625","1260.
970625","""1899","031003002011","螺纹法兰阀门","(1)止回阀DN65","安装、电气接线、调试","个","1","427.
0103125","427.
0103125","""1900","031003008001","除污器(过滤器)","(1)过滤器DN150","安装","组","2","4828.
02","9656.
04","""1901","031003013001","水表","(1)LXL-70N消防水表","组装","组/个","1","1630.
83125","1630.
83125","""1902","031003013002","水表","(1)LXL-100N消防水表","组装","组/个","1","2004.
39125","2004.
39125","""1903","031003013003","水表","(1)LXL-150N消防水表","组装","组/个","2","3468.
8525","6937.
705","""1904","031003011001","法兰","(1)螺纹法兰安装(公称直径65mm以内)","安装","副/片","3","109.
390078125","328.
1703125","""1905","031003011002","法兰","(1)螺纹法兰安装(公称直径80mm以内)","安装","副/片","2","134.
52","269.
04","""1906","031003011003","法兰","(1)螺纹法兰安装(公称直径100mm以内)","安装","副/片","4","187.
60015625","750.
400625","""1907","031003011004","法兰","(1)螺纹法兰安装(公称直径150mm以内)","安装","副/片","18","268.
33015625","4829.
94","""1908","031003012003","倒流防止器","(1)倒流防止器DN70","安装","套","1","1303.
16","1303.
16","""1909","031003012004","倒流防止器","(1)倒流防止器DN150","安装","套","1","3208.
3525","3208.
3525","""1910","031003010008","软接头(软管)","(1)可曲挠橡胶接头DN70","安装","个/组","1","227.
88015625","227.
88015625","""1911","031003010009","软接头(软管)","(1)可曲挠橡胶接头DN150","安装","个/组","3","584.
25","1752.
75","""1912","030901012003","消防水泵接合器","(1)低区室内消防","安装、","套","3","1438.
97125","4316.
9125","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第231页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""栓系统水泵接合器DN100","安装""1913","030901012004","消防水泵接合器","(1)高区室内消防栓系统水泵接合器DN100","安装、安装","套","3","1438.
97125","4316.
9125","""1914","030901011001","室外消火栓","(1)室外消防栓DN150","安装、配件安装","套","6","1451.
65125","8709.
905","""1915","030901014001","自喷系统水泵接合器","(1)自喷系统水泵接合器DN100","本体安装、调试","台","3","1311.
64125","3934.
9225","""1916","040504001004","阀门井05S502-41","(1)排水井垫层(混凝土)(2)砌筑井壁(砖砌井壁圆形)(3)C25预拌非泵送普通混凝土半地下室池底(平池底厚度50cm以内)(4)C25现浇预拌非泵送普通混凝土井室盖板(预拌非泵送普通混凝土井室盖板)(5)现浇混凝土(圆钢筋φ10以内)(6)井盖、井箅安装(检查井井盖、座普通铸铁)","垫层铺筑、模板制作、安装、拆除、混凝土拌和、运输、浇筑、养护、砌筑、勾缝、抹面、井圈、井盖安装、盖板安装、踏步安装、防水、止水","座","6","12446.
3","74677.
8","""1917","040504001005","水表井1通05S502-53","(1)排水井垫层(混凝土)(2)砌筑井壁(砖砌井壁圆形)(3)C25预拌非泵送普通混凝土半地下室池底(平池底厚度50cm以内)(4)C25现浇预拌非泵送普通混凝土井室盖板(预拌非泵送普通混凝土井室盖板)(5)现浇混凝土(圆钢筋φ10以内)(6)井盖、井箅安装(检查井井盖、座普通铸铁)","垫层铺筑、模板制作、安装、拆除、混凝土拌和、运输、浇筑、养护、砌筑、勾缝、抹面、井圈、井盖安装、盖板安装、踏步安装、防水、止水","座","1","11151.
61","11151.
61","""1918","040504001006","水表井3通05S502-53","(1)排水井垫层(混凝土)(2)砌筑井壁(砖砌井壁圆形)(3)C25预拌非泵送普通混凝土半地下室池底(平池底厚度50cm以内","垫层铺筑、模板制作、安装、拆除、混凝土拌和、运输、浇筑、养护、砌筑、勾缝、抹面、","座","1","11151.
61","11151.
61","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第232页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""4)C25现浇预拌非泵送普通混凝土井室盖板(预拌非泵送普通混凝土井室盖板)(5)现浇混凝土(圆钢筋φ10以内)(6)井盖、井箅安装(检查井井盖、座普通铸铁)","井圈、井盖安装、盖板安装、踏步安装、防水、止水""1919","040101002003","挖沟槽土方","(1)人工挖沟槽土方(三类土槽深2m以内)人工辅助开挖比例≤5%(2)小型挖掘机挖土(小型挖掘机挖槽坑土方不装车三类土)土石方项目工程量在2000m3以内","排地表水、土方开挖、围护(挡土板)及拆除、基底钎探、场内运输","m3","329.
554","6.
5600048828125","2161.
87125","""1920","040103001003","填方","(1)槽、坑回填土(夯实机夯实)","运输、回填、压实","m3","141.
238","10.
12","1429.
33125","""1921","040103001004","填方","(1)槽、坑回填砂(人工摊铺机械夯实)","运输、回填、压实","m3","129.
961","296.
03","38472.
35","""1922","040103002002","余方弃置","(1)人工装、运土方(人工装车土方)(2)自卸汽车运土(载重10t以内运距3km以内)","余方点装料运输至弃置点","m3","167.
211","25.
53001953125","4268.
9","""1923","040305001003","垫层","(1)垫层(砂)","垫层铺筑","m3","47.
079","388.
1603125","18274.
18","""排水工程"分项工程(17安装)""","","污水系统""1924","031001006028","塑料管","(1)室外塑料排水管(胶圈接口)PVC-U双壁波纹管DN250","管道安装、管件安装、塑料卡固定、阻火圈安装、压力试验、吹扫、冲洗、警示带铺设","m","401.
376","59.
75","23982.
22","""1925","031001006029","塑料管","(1)室外塑料排水管(胶圈接口)PVC-U双壁波纹管DN250S2","管道安装、管件安装、塑料卡固定、阻火圈安装、压力试验、吹扫、冲洗、警示带铺设","m","93.
600078125","63.
1200390625","5908.
03","""1926","031001006030","塑料管","(1)室外塑料排水管(胶圈接口)PVC-U双壁波纹管DN300","管道安装、管件安装、塑料卡固定、阻火圈安","m","14.
400009765625","79.
5300390625","1145.
230625","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第233页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""装、压力试验、吹扫、冲洗、警示带铺设""1927","040504003001","塑料检查井","(1)整体井池安装塑料井φ315(含复合井盖)(2)井盖、井箅安装(检查井井盖、座混凝土)","垫层铺筑、模板制作、安装、拆除、混凝土拌和、运输、浇筑、养护、检查井安装、井筒、井圈、井盖安装、钢筋制作安装","座","39","2212.
28","86278.
92","""1928","040504003002","塑料检查井","(1)整体井池安装塑料井φ450(含复合井盖)(2)井盖、井箅安装(检查井井盖、座混凝土)","垫层铺筑、模板制作、安装、拆除、混凝土拌和、运输、浇筑、养护、检查井安装、井筒、井圈、井盖安装、钢筋制作安装","座","1","5224.
23","5224.
23","""1929","040504008001","整体化粪池","(1)YJBH-13-II型玻璃钢化粪器有效容积100T","安装","座","1","111397","111397","""1930","040504008002","整体化粪池","(1)YJBH-13-II型玻璃钢化粪器有效容积100T","安装","套","1","310650","310650","""1931","031004019001","隔油器","(1)BSY-4成品隔油器单个过水能力18.
3m3/h","安装","个","2","6169.
845","12339.
69","""1932","040101002005","挖沟槽土方","(1)人工挖沟槽土方(三类土槽深2m以内)人工辅助开挖比例≤5%(2)小型挖掘机挖土(小型挖掘机挖槽坑土方不装车三类土)土石方项目工程量在2000m3以内","排地表水、土方开挖、围护(挡土板)及拆除、基底钎探、场内运输","m3","1005.
978","6.
5600048828125","6599.
225","""1933","040103001007","填方","(1)槽、坑回填土(夯实机夯实)","运输、回填、压实","m3","732.
132","10.
12","7409.
185","""1934","040103001008","填方","(1)槽、坑回填砂(人工摊铺机械夯实)","运输、回填、压实","m3","205.
044","296.
03","60699.
18","""1935","040103002004","余方弃置","(1)人工装、运土方(人工装车土方)(2)自卸汽车运土(载重10t以内运距3km以内)","余方点装料运输至弃置点","m3","273.
84","25.
53001953125","6991.
145","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第234页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价","""1936","040305001005","垫层","(1)垫层(砂)","垫层铺筑","m3","43.
392","388.
1603125","16843.
05","""","","雨水系统""1937","031001006031","塑料管","(1)室外塑料排水管(胶圈接口)PVC-U双壁波纹管DN200","管道安装、管件安装、塑料卡固定、阻火圈安装、压力试验、吹扫、冲洗、警示带铺设","m","169.
85015625","46.
6600390625","7925.
205","""1938","031001006032","塑料管","(1)室外塑料排水管(胶圈接口)PVC-U双壁波纹管DN300","管道安装、管件安装、塑料卡固定、阻火圈安装、压力试验、吹扫、冲洗、警示带铺设","m","96.
125","79.
5300390625","7644.
825","""1939","031001006033","塑料管","(1)室外塑料排水管(胶圈接口)PVC-U双壁波纹管DN400","管道安装、管件安装、塑料卡固定、阻火圈安装、压力试验、吹扫、冲洗、警示带铺设","m","112.
980078125","118.
780078125","13419.
77","""1940","031001006034","塑料管","(1)室外塑料排水管(胶圈接口)PVC-U双壁波纹管DN500","管道安装、管件安装、塑料卡固定、阻火圈安装、压力试验、吹扫、冲洗、警示带铺设","m","83.
765078125","171.
70015625","14382.
45","""1941","031001006035","塑料管","(1)室外塑料排水管(胶圈接口)PVC-U双壁波纹管DN600","管道安装、管件安装、塑料卡固定、阻火圈安装、压力试验、吹扫、冲洗、警示带铺设","m","23.
21501953125","288.
78","6704.
03","""1942","040504003003","塑料检查井","(1)整体井池安装塑料井φ450(含复合井盖)(2)井盖、井箅安装(检查井井盖、座普通铸铁)","垫层铺筑、模板制作、安装、拆除、混凝土拌和、运输、浇筑、养护、检查井安装、井筒、井圈、井盖安装、钢筋制作安装","座","5","6627.
105","33135.
5","""1943","040504003004","塑料检查井","(1)整体井池安装塑料井φ500(含复合井盖)","垫层铺筑、模板制作、安装、拆除","座","6","7999.
27","47995.
62","""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第235页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价",""2)井盖、井箅安装(检查井井盖、座普通铸铁)","、混凝土拌和、运输、浇筑、养护、检查井安装、井筒、井圈、井盖安装、钢筋制作安装""1944","040504003005","塑料检查井","(1)整体井池安装塑料井φ630(含复合井盖)(2)井盖、井箅安装(检查井井盖、座混凝土)","垫层铺筑、模板制作、安装、拆除、混凝土拌和、运输、浇筑、养护、检查井安装、井筒、井圈、井盖安装、钢筋制作安装","座","7","13109.
19","91764.
33","""1945","040504009002","雨水口","(1)塑料雨水篦成套(2)井盖、井箅安装(雨水井混凝土箅(盖)座)","垫层铺筑、模板制作、安装、拆除、混凝土拌和、运输、浇筑、养护、砌筑、勾缝、抹面、雨水箅子安装、钢筋制作安装、脚手架搭拆","座","16.
5","2520.
45","41587.
43","""1946","040101002006","挖沟槽土方","(1)人工挖沟槽土方(三类土槽深2m以内)人工辅助开挖比例≤5%(2)小型挖掘机挖土(小型挖掘机挖槽坑土方不装车三类土)土石方项目工程量在2000m3以内","排地表水、土方开挖、围护(挡土板)及拆除、基底钎探、场内运输","m3","838.
315625","6.
5600048828125","5499.
35","""1947","040103001009","填方","(1)槽、坑回填土(夯实机夯实)","运输、回填、压实","m3","932.
890625","10.
12","9440.
85","""1948","040103001010","填方","(1)槽、坑回填砂(人工摊铺机械夯实)","运输、回填、压实","m3","250.
99015625","296.
03","74300.
57","""1949","040103002005","余方弃置","(1)人工装、运土方(人工装车土方)(2)自卸汽车运土(载重10t以内运距3km以内)","余方点装料运输至弃置点","m3","345.
8703125","25.
53001953125","8830.
065","""1950","040305001006","垫层","(1)垫层(砂)","垫层铺筑","m3","45.
1000390625","388.
1603125","17506.
02","""暂列金额"单项工程(17房屋建筑与装饰)""暂列金额"单位工程(17房屋建筑与装饰)""分部分项工程模拟清单与计价表""工程名称:新潭城市广场"第236页共236页",,"""序号","项目编码","项目名称材料名称","项目特征规格型号","工作内容是否暂定","计量单位","工程量数量","金额(元)",,"",,,,,,,"综合单价主材单价","合价","""暂列金额"分项工程(17房屋建筑与装饰)""暂定部分"单项工程(17房屋建筑与装饰)""暂定金额专业工程"单位工程(17房屋建筑与装饰)""室外附属"分项工程(17房屋建筑与装饰)""合计"66089376.
8","""单价措施项目模拟清单与计价表""工程名称:新潭城市广场"第1页共12页",,"""序号","项目编码","项目名称","项目特征","工作内容","计量单位","工程量","金额(元)",,"",,,,,,,"综合单价","合价","""地上建筑"单项工程(17房屋建筑与装饰)""房屋建筑与装饰工程"单位工程(17房屋建筑与装饰)""砌筑工程"分项工程(17房屋建筑与装饰)""1","011701003001","砌筑脚手架","(1)服务对象:砌体(2)搭设高度:大于3.
6m","场内、场外材料搬运、搭、拆脚手架、斜道、上料平台、安全网的铺设、拆除脚手架后材料的堆放","m2","4043.
623","10.
510009765625","42498.
48","""2","011701003002","砌筑脚手架","(1)服务对象:砌体(2)搭设高度:小于3.
6m","场内、场外材料搬运、搭、拆脚手架、斜道、上料平台、安全网的铺设、拆除脚手架后材料的堆放","m2","8829.
758","3.
70000244140625","32670.
1","""3","011701010001","电梯井脚手架","(1)搭设方式:电梯井脚手架","场内、场外材料搬运、搭、拆脚手架、斜道、上料平台、安全网的铺设、拆除脚手架后材料的堆放","m3","532.
3503125","31.
80001953125","16928.
73","""混凝土工程"分项工程(17房屋建筑与装饰)""4","011702002001","柱模板","(1)支撑高度:不超过6m(2)构件形状:矩形","模板及支架制作、模板及支架安装、拆除、整理堆放及场内外运输、清理模板粘结物及模内杂物、刷隔离剂等","m2","5218.
1325","82.
670078125","431382.
81","""5","011702002002","柱模板","(1)支撑高度:不超过6m(2)构件形状:异形","模板及支架制作、模板及支架安装、拆除、整理堆放及场内外运输、清理模板粘结物及模内杂物、刷隔离剂等","m2","568.
733","123.
100078125","70011.
03","""6","011702002003","柱模板","(1)梯柱模板(2)支撑高度:不超过6m(3)构件形状:矩形","模板及支架制作、模板及支架安装、拆除、整理堆放及场内外运输、清理模板粘结物及模内杂物、刷隔离剂等","m2","97.
440078125","82.
670078125","8055.
365","""7","011702014001","有梁板模板","(1)有梁板模板","模板及支架制作、模板及支","m2","22583.
27","81.
8400390625","1848214.
82","""单价措施项目模拟清单与计价表""工程名称:新潭城市广场"第2页共12页",,"""序号","项目编码","项目名称","项目特征","工作内容","计量单位","工程量","金额(元)",,"",,,,,,,"综合单价","合价",""2)6m以内","架安装、拆除、整理堆放及场内外运输、清理模板粘结物及模内杂物、刷隔离剂等""8","011702030001","后浇带模板","(1)梁板","模板及支架制作、模板及支架安装、拆除、整理堆放及场内外运输、清理模板粘结物及模内杂物、刷隔离剂等","m2","306.
21","229.
09015625","70149.
65","""9","011702024001","楼梯模板","(1)楼梯类型:板式","模板及支架制作、模板及支架安装、拆除、整理堆放及场内外运输、清理模板粘结物及模内杂物、刷隔离剂等","m2","449.
2803125","187.
49015625","84235.
51","""10","011702003001","构造柱模板","(1)构造柱模板","模板及支架制作、模板及支架安装、拆除、整理堆放及场内外运输、清理模板粘结物及模内杂物、刷隔离剂等","m2","832.
134","101.
700078125","84628.
03","""11","011702008001","圈梁模板","(1)圈梁模板","模板及支架制作、模板及支架安装、拆除、整理堆放及场内外运输、清理模板粘结物及模内杂物、刷隔离剂等","m2","735.
424","68.
74","50553.
05","""12","011702009001","过梁模板","(1)过梁模板","模板及支架制作、模板及支架安装、拆除、整理堆放及场内外运输、清理模板粘结物及模内杂物、刷隔离剂等","m2","222.
249","90.
780078125","20175.
76","""13","011702016001","平板模板","(1)挑板(2)3.
6以内","模板及支架制作、模板及支架安装、拆除、整理堆放及场内外运输、清理模板粘结物及模内杂物、刷隔离剂等","m2","325.
157","68.
18","22169.
22","""14","011702011001","墙模板","(1)直行墙(2)地梁面或地下室顶板面至一楼地","模板及支架制作、模板及支架安装、拆除、整理堆放及","m2","160.
753","73.
35","11791.
23","""单价措施项目模拟清单与计价表""工程名称:新潭城市广场"第3页共12页",,"""序号","项目编码","项目名称","项目特征","工作内容","计量单位","工程量","金额(元)",,"",,,,,,,"综合单价","合价",""面之间墙体及室内地面低于室外地坪或者底部侧墙为挡土墙时,且高差≤600mm时,周边墙体用素混凝土浇筑","场内外运输、清理模板粘结物及模内杂物、刷隔离剂等""15","011702021001","栏板模板","(1)构件形状:栏板模板","模板及支架制作、模板及支架安装、拆除、整理堆放及场内外运输、清理模板粘结物及模内杂物、刷隔离剂等","m2","779.
993","72.
0900390625","56229.
7","""16","011702025001","其他现浇构件模板","(1)构件类型:压顶","模板及支架制作、模板及支架安装、拆除、整理堆放及场内外运输、清理模板粘结物及模内杂物、刷隔离剂等","m2","104.
557","71.
1100390625","7435.
05","""17","011702023001","雨篷、悬挑构件模板","(1)构件类型:雨蓬模板(2)支撑高度:3.
6以内","模板及支架制作、模板及支架安装、拆除、整理堆放及场内外运输、清理模板粘结物及模内杂物、刷隔离剂等","m2","23","122.
390078125","2814.
9725","""18","011701002001","外脚手架及垂直封闭安全网","(1)服务对象:外墙(2)搭设方式:落地式钢管(3)搭设高度:30m以内(4)脚手架材质:钢管(5)安全网材质:密目安全网(阻燃)","场内、场外材料搬运、搭、拆脚手架、斜道、上料平台、安全网的铺设、拆除脚手架后材料的堆放","m2","8242.
013","90.
840078125","748704.
46","""19","011701002002","外脚手架及垂直封闭安全网","(1)服务对象:屋面楼梯间外墙(2)搭设方式:落地式钢管(3)搭设高度:2.
6(4)脚手架材质:钢管(5)安全网材质:密目安全网(阻燃)","场内、场外材料搬运、搭、拆脚手架、斜道、上料平台、安全网的铺设、拆除脚手架后材料的堆放","m2","310.
541","54.
9400390625","17061.
13","""20","011705001001","大型机械设备进出场及安拆","","安拆费包括施","项","1","139183.
38","139183.
38","""单价措施项目模拟清单与计价表""工程名称:新潭城市广场"第4页共12页",,"""序号","项目编码","项目名称","项目特征","工作内容","计量单位","工程量","金额(元)",,"",,,,,,,"综合单价","合价",""工机械、设备在现场进行安装拆卸所需人工、材料、机械和试运转费用以及机械辅助设施的折旧、搭设、拆除等费用、进出场费包括施工机械、设备整体或分体自停放地点运至施工现场(或由一施工地点运至另一施工地点)、运离施工现场所发生的运输、装卸、辅助材料等费用、大型机械设备基础、大型机械检测费""21","011703001001","垂直运输","","垂直运输机械的使用费、垂直运输人工费用","项","1","1147337.
8","1147337.
8","""22","011704001001","超高施工加压水泵费","(1)框架结构(2)23.
9m7层","高层施工用水加压水泵的安装、拆除及工作台班","项","1","21502.
5","21502.
5","""屋面工程"分项工程(17房屋建筑与装饰)""钢筋工程"分项工程(17房屋建筑与装饰)""厨房卫生间防水"分项工程(17房屋建筑与装饰)""其他一般土建工程"分项工程(17房屋建筑与装饰)""门窗工程"分项工程(17房屋建筑与装饰)""楼地面工程"分项工程(17房屋建筑与装饰)""内墙柱面工程"分项工程(17房屋建筑与装饰)""外墙面工程"分项工程(17房屋建筑与装饰)""天棚工程"分项工程(17房屋建筑与装饰)""23","011701006001","满堂装饰脚手架","(1)服务对象(天棚和墙面或天棚):满堂装饰脚手架(2)服务高度:超过3.
6米","场内、场外材料搬运、搭、拆脚手架、斜道、上料平台、安全网的铺设、拆除脚手架后材料的堆放","m2","11585.
168","11.
100009765625","128595.
36","""其他装饰工程"分项工程(17房屋建筑与装饰)""主楼安装"单位工程(17安装)""水卫工程"分项工程(17安装)""24","031301017001","脚手架搭拆"项","1","9118.
81","9118.
81","""单价措施项目模拟清单与计价表""工程名称:新潭城市广场"第5页共12页",,"""序号","项目编码","项目名称","项目特征","工作内容","计量单位","工程量","金额(元)",,"",,,,,,,"综合单价","合价","""电气工程"分项工程(17安装)""25","031301017002","脚手架搭拆"项","1","10567.
97","10567.
97","""消防电工程"分项工程(17安装)""26","031301017003","脚手架搭拆"项","1","3989.
2725","3989.
2725","""防火门系统"分项工程(17安装)""27","031301017004","脚手架搭拆"项","1","869.
680625","869.
680625","""漏电火灾报警监控系统"分项工程(17安装)""28","031301017005","脚手架搭拆"项","1","19.
090009765625","19.
090009765625","""设备电源监控系统"分项工程(17安装)""29","031301017006","脚手架搭拆"项","1","80.
85","80.
85","""消防水工程"分项工程(17安装)""30","031301017007","脚手架搭拆"项","1","2063.
56125","2063.
56125","""喷淋工程"分项工程(17安装)""31","031301017008","脚手架搭拆"项","1","915.
370625","915.
370625","""智能照明工程"分项工程(17安装)""32","031301017009","脚手架搭拆"项","1","325.
33015625","325.
33015625","""抗震支架"分项工程(17安装)""裙楼安装"单位工程(17安装)""水卫工程"分项工程(17安装)""33","031301017010","脚手架搭拆"项","1","12910.
5","12910.
5","""电气工程"分项工程(17安装)""34","031301017011","脚手架搭拆"项","1","12770.
06","12770.
06","""智能照明工程"分项工程(17安装)""35","031301017012","脚手架搭拆"项","1","3062.
6525","3062.
6525","""消防电工程"分项工程(17安装)""36","031301017013","脚手架搭拆"项","1","18850.
45","18850.
45","""防火门监控"分项工程(17安装)""漏电火灾报警监控系统"分项工程(17安装)""设备电源监控系统"分项工程(17安装)""气体灭火系统"分项工程(17安装)""37","031301017014","脚手架搭拆"项","1","208.
64015625","208.
64015625","""无管网灭火系统"分项工程(17安装)""38","031301017015","脚手架搭拆"项","1","973.
220625","973.
220625","""消火栓水工程"分项工程(17安装)""39","031301017016","脚手架搭拆"项","1","7302.
245","7302.
245","""喷淋工程"分项工程(17安装)""40","031301017017","脚手架搭拆"项","1","27607.
95","27607.
95","""通风排烟工程"分项工程(17安装)""41","031301017018","脚手架搭拆"项","1","8572.
28","8572.
28","""空调水系统"分项工程(17安装)""42","031301017019","脚手架搭拆"项","1","2990.
0225","2990.
0225","""抗震支架"分项工程(17安装)""地下建筑"单项工程(17房屋建筑与装饰)""房屋建筑与装饰工程"单位工程(17房屋建筑与装饰)""单价措施项目模拟清单与计价表""工程名称:新潭城市广场"第6页共12页",,"""序号","项目编码","项目名称","项目特征","工作内容","计量单位","工程量","金额(元)",,"",,,,,,,"综合单价","合价","""土方工程"分项工程(17房屋建筑与装饰)""43","011705001002","大型机械设备进出场及安拆","","安拆费包括施工机械、设备在现场进行安装拆卸所需人工、材料、机械和试运转费用以及机械辅助设施的折旧、搭设、拆除等费用、进出场费包括施工机械、设备整体或分体自停放地点运至施工现场(或由一施工地点运至另一施工地点)、运离施工现场所发生的运输、装卸、辅助材料等费用、大型机械设备基础、大型机械检测费","项","1","8213.
165","8213.
165","""基坑支护工程"分项工程(17房屋建筑与装饰)""","","【内支撑】"44","011702005001","基础梁模板","(1)冠梁及支撑梁(2)现浇混凝土胶合板模板(基础无底模基础梁、地圈梁)","模板及支架制作、模板及支架安装、拆除、整理堆放及场内外运输、清理模板粘结物及模内杂物、刷隔离剂等","m2","654.
323","64.
04","41902.
84","""45","011702014002","有梁板模板","(1)传力板模板(2)3.
6以上","模板及支架制作、模板及支架安装、拆除、整理堆放及场内外运输、清理模板粘结物及模内杂物、刷隔离剂等","m2","79.
1","75.
6600390625","5984.
71","""46","011705001003","大型机械设备进出场及安拆","","安拆费包括施工机械、设备在现场进行安装拆卸所需人工、材料、机械和试运转费用以及机械辅助设施的折旧、搭设、拆除等费用、进出场费包括施工机械、设备整体或分体自停放地点运至施","项","1","57528.
61","57528.
61","""单价措施项目模拟清单与计价表""工程名称:新潭城市广场"第7页共12页",,"""序号","项目编码","项目名称","项目特征","工作内容","计量单位","工程量","金额(元)",,"",,,,,,,"综合单价","合价",""工现场(或由一施工地点运至另一施工地点)、运离施工现场所发生的运输、装卸、辅助材料等费用、大型机械设备基础、大型机械检测费""47","011706001001","成井","(1)机械钻孔(2)杂填土、细砂(3)400mm(4)φ219钢管,壁厚3mm(5)滤网","准备钻孔机械、埋设护筒、钻机就位;泥浆制作、固壁;成孔、出渣、清孔等、对接上、下井管(滤管),焊接,安放,下滤料,洗井,连接试抽等","m","220","370.
1903125","81441.
8","""48","01B001","封井","(1)金属管道切割(2)C30素混凝土(30微膨胀)(3)钢板封口(4)砂卵石","","口","20","461.
1303125","9222.
605","""49","011706002001","排水、降水","","管道安装、拆除,场内搬运等、抽水、值班、降水设备维修等","项","1","360624","360624","""混凝土工程"分项工程(17房屋建筑与装饰)""50","011702001001","基础模板","(1)筏板基础模板","模板及支架制作、模板及支架安装、拆除、整理堆放及场内外运输、清理模板粘结物及模内杂物、刷隔离剂等","m2","660.
150625","58.
8700390625","38863.
03","""51","011702033001","垫层模板","(1)构件类型:垫层(2)支撑高度:100mm","模板及支架制作、模板及支架安装、拆除、整理堆放及场内外运输、清理模板粘结物及模内杂物、刷隔离剂等","m2","213.
95015625","72.
3800390625","15485.
7","""52","010401001001","砖基础","(1)基础类型:砖胎膜(2)20厚1:2.
5水泥砂浆找平","砂浆制作、运输、砌砖、防潮层铺设、材料运输","m3","221.
13515625","694.
780625","153640.
18","""53","011201004007","立面砂浆找平层","(1)砖模抹灰(2)20厚1:2.
","基层清理、刷界面剂、砂浆","m2","542.
303","38.
17001953125","20699.
71","""单价措施项目模拟清单与计价表""工程名称:新潭城市广场"第8页共12页",,"""序号","项目编码","项目名称","项目特征","工作内容","计量单位","工程量","金额(元)",,"",,,,,,,"综合单价","合价",""5水泥砂浆","制作、运输、抹平找平""54","011702011002","墙模板","(1)外墙及水池侧墙(2)支撑高度:不超过6m(3)综合考虑止水螺栓","模板及支架制作、模板及支架安装、拆除、整理堆放及场内外运输、清理模板粘结物及模内杂物、刷隔离剂等","m2","2618.
52125","105.
510078125","276280.
05","""55","011702011003","墙模板","(1)地下室内墙(2)支撑高度:不超过6m(3)综合考虑止水螺栓","模板及支架制作、模板及支架安装、拆除、整理堆放及场内外运输、清理模板粘结物及模内杂物、刷隔离剂等","m2","2155.
45","77.
8300390625","167758.
67","""56","011702002004","柱模板","(1)支撑高度:不超过6m(2)构件形状:矩形","模板及支架制作、模板及支架安装、拆除、整理堆放及场内外运输、清理模板粘结物及模内杂物、刷隔离剂等","m2","1060.
16","86.
810078125","92032.
49","""57","011702014003","有梁板模板","(1)支撑高度:不超过6m","模板及支架制作、模板及支架安装、拆除、整理堆放及场内外运输、清理模板粘结物及模内杂物、刷隔离剂等","m2","6708.
025","87.
980078125","590171.
6","""58","011702006001","梁模板","(1)支撑高度:不超过6m(2)构件形状:矩形","模板及支架制作、模板及支架安装、拆除、整理堆放及场内外运输、清理模板粘结物及模内杂物、刷隔离剂等","m2","5.
5200048828125","114.
690078125","633.
0903125","""59","011702030002","后浇带模板","(1)基础(2)350mm","模板及支架制作、模板及支架安装、拆除、整理堆放及场内外运输、清理模板粘结物及模内杂物、刷隔离剂等","m2","87.
638","39.
99001953125","3504.
6425","""60","011702030003","后浇带模板","(1)外墙后浇带模板(2)4.
1m、5.
2m","模板及支架制作、模板及支架安装、拆除、整理堆放及场内外运输、清理模板粘结物及模内杂物、刷隔离剂等","m2","131.
765","65.
8900390625","8682","""单价措施项目模拟清单与计价表""工程名称:新潭城市广场"第9页共12页",,"""序号","项目编码","项目名称","项目特征","工作内容","计量单位","工程量","金额(元)",,"",,,,,,,"综合单价","合价","""61","011702030004","后浇带模板","(1)顶板后浇带模板(2)4.
1m、5.
2m","模板及支架制作、模板及支架安装、拆除、整理堆放及场内外运输、清理模板粘结物及模内杂物、刷隔离剂等","m2","113.
211","229.
09015625","25935.
51","""62","011702024002","楼梯模板","(1)楼梯类型:三跑板式","模板及支架制作、模板及支架安装、拆除、整理堆放及场内外运输、清理模板粘结物及模内杂物、刷隔离剂等","m2","51.
959","169.
05015625","8783.
67","""63","011702003002","构造柱模板","(1)构造柱模板","模板及支架制作、模板及支架安装、拆除、整理堆放及场内外运输、清理模板粘结物及模内杂物、刷隔离剂等","m2","56.
2200390625","101.
530078125","5708.
025","""64","011702008002","圈梁模板","(1)圈梁模板","模板及支架制作、模板及支架安装、拆除、整理堆放及场内外运输、清理模板粘结物及模内杂物、刷隔离剂等","m2","98.
990078125","68.
74","6804.
57","""65","011702009002","过梁模板","(1)过梁模板","模板及支架制作、模板及支架安装、拆除、整理堆放及场内外运输、清理模板粘结物及模内杂物、刷隔离剂等","m2","18.
25","90.
75","1656.
19125","""66","011702021002","栏板模板","(1)车道坡道栏板","模板及支架制作、模板及支架安装、拆除、整理堆放及场内外运输、清理模板粘结物及模内杂物、刷隔离剂等","m2","54.
1700390625","72.
0900390625","3905.
1225","""67","011702025002","其他现浇构件模板","(1)排水沟、集水坑模板","模板及支架制作、模板及支架安装、拆除、整理堆放及场内外运输、清理模板粘结物及模内杂物、刷隔离剂等","m2","223.
332","81.
5","18201.
56","""68","011701002003","外脚手架及垂直封闭安全网","(1)服务对象:外墙","场内、场外材料搬运、搭、","m2","1205.
550625","62.
25","75045.
49","""单价措施项目模拟清单与计价表""工程名称:新潭城市广场"第10页共12页",,"""序号","项目编码","项目名称","项目特征","工作内容","计量单位","工程量","金额(元)",,"",,,,,,,"综合单价","合价",""2)搭设方式:悬挑(3)搭设高度:67.
1m(4)脚手架材质:钢管(5)安全网材质:密目安全网(阻燃)","拆脚手架、斜道、上料平台、安全网的铺设、拆除脚手架后材料的堆放""69","011703001002","垂直运输","","垂直运输机械的使用费、垂直运输人工费用","项","1","100759.
95","100759.
95","""70","01B01001","排水、降水","","管道安装、拆除,场内搬运等、抽水、值班、降水设备维修等","项","1","11479.
86","11479.
86","""砌筑工程"分项工程(17房屋建筑与装饰)""71","011701003003","砌筑脚手架","(1)服务对象:砌体(2)搭设高度:大于3.
6m","场内、场外材料搬运、搭、拆脚手架、斜道、上料平台、安全网的铺设、拆除脚手架后材料的堆放","m2","1306.
341","10.
510009765625","13729.
65","""72","011701003004","砌筑脚手架","(1)服务对象:砌体(2)搭设高度:小于3.
6m","场内、场外材料搬运、搭、拆脚手架、斜道、上料平台、安全网的铺设、拆除脚手架后材料的堆放","m2","329.
534","3.
70000244140625","1219.
280625","""73","011701010002","电梯井脚手架","(1)电梯井脚手架","场内、场外材料搬运、搭、拆脚手架、斜道、上料平台、安全网的铺设、拆除脚手架后材料的堆放","m3","323.
845","31.
80001953125","10298.
27","""地下室防水"分项工程(17房屋建筑与装饰)""钢筋工程"分项工程(17房屋建筑与装饰)""装饰工程"分项工程(17房屋建筑与装饰)""74","011701006002","满堂装饰脚手架","(1)满堂脚手架(2)超过3.
6m","场内、场外材料搬运、搭、拆脚手架、斜道、上料平台、安全网的铺设、拆除脚手架后材料的堆放","m2","5196.
631","11.
100009765625","57682.
6","""单价措施项目模拟清单与计价表""工程名称:新潭城市广场"第11页共12页",,"""序号","项目编码","项目名称","项目特征","工作内容","计量单位","工程量","金额(元)",,"",,,,,,,"综合单价","合价","""其他装饰工程"分项工程(17房屋建筑与装饰)""其他地下室工程"分项工程(17房屋建筑与装饰)""门窗工程"分项工程(17房屋建筑与装饰)""地下室安装"单位工程(17安装)""电气工程"分项工程(17安装)""75","031301017020","脚手架搭拆"项","1","6908.
83","6908.
83","""消防电工程"分项工程(17安装)""76","031301017021","脚手架搭拆"项","1","7076.
37","7076.
37","""漏电火灾报警监控系统"分项工程(17安装)""77","031301017022","脚手架搭拆"项","1","289.
61015625","289.
61015625","""防火门系统"分项工程(17安装)""设备电源监控系统"分项工程(17安装)""78","031301017023","脚手架搭拆"项","1","210.
09015625","210.
09015625","""生活给水"分项工程(17安装)""79","031301017024","脚手架搭拆"项","1","878.
680625","878.
680625","""消火栓水"分项工程(17安装)""80","031301017025","脚手架搭拆"项","1","2184.
5","2184.
5","""喷淋工程"分项工程(17安装)""81","031301017026","脚手架搭拆"项","1","5094.
1225","5094.
1225","""集水坑排水"分项工程(17安装)""82","031301017027","脚手架搭拆"项","1","940.
580625","940.
580625","""消防车取水口"分项工程(17安装)""83","031301017028","脚手架搭拆"项","1","100.
520078125","100.
520078125","""排烟工程"分项工程(17安装)""84","031301017029","脚手架搭拆"项","1","4209.
35","4209.
35","""平时通风"分项工程(17安装)""85","031301017030","脚手架搭拆"项","1","1058.
1","1058.
1","""智能照明工程"分项工程(17安装)""86","031301017031","脚手架搭拆"项","1","3506.
5625","3506.
5625","""抗震支架"分项工程(17安装)""人防工程"单位工程(17安装)""电气工程"分项工程(17安装)""人防弱电"分项工程(17安装)""87","031301017032","脚手架搭拆"项","1","217.
13015625","217.
13015625","""战时通风"分项工程(17安装)""88","031301017033","脚手架搭拆"项","1","71.
4200390625","71.
4200390625","""战时给水"分项工程(17安装)""89","031301017034","脚手架搭拆"项","1","28.
98001953125","28.
98001953125","""水泵房"单位工程(17安装)""给水系统"分项工程(17安装)""90","031301017035","脚手架搭拆"项","1","243.
10015625","243.
10015625","""消火栓水"分项工程(17安装)""91","031301017036","脚手架搭拆"项","1","116.
340078125","116.
340078125","""喷淋系统"分项工程(17安装)""单价措施项目模拟清单与计价表""工程名称:新潭城市广场"第12页共12页",,"""序号","项目编码","项目名称","项目特征","工作内容","计量单位","工程量","金额(元)",,"",,,,,,,"综合单价","合价","""92","031301017037","脚手架搭拆"项","1","123.
840078125","123.
840078125","""充电桩系统"单项工程(17房屋建筑与装饰)""安装工程"单位工程(17安装)""充电桩系统"分项工程(17安装)""变配电设备"单项工程(17房屋建筑与装饰)""变配电工程"单位工程(17安装)""变配电工程"分项工程(17安装)""93","031301017038","脚手架搭拆"项","1",,,"""电梯工程"单项工程(17房屋建筑与装饰)""安装工程"单位工程(17安装)""电梯工程"分项工程(17安装)""智能化工程"单项工程(17房屋建筑与装饰)""智能化工程"单位工程(17安装)""停车场管理系统"分项工程(17安装)""视频监控系统"分项工程(17安装)""94","031301017039","脚手架搭拆"项","1","1790.
05125","1790.
05125","""计算机网络系统"分项工程(17安装)""电梯五方通话"分项工程(17安装)""门禁对讲系统"分项工程(17安装)""巡更系统"分项工程(17安装)""光纤入户系统"分项工程(17安装)""有线电视系统"分项工程(17安装)""电子周界防护系统"分项工程(17安装)""室外安装工程"单项工程(17房屋建筑与装饰)""室外安装工程"单位工程(17安装)""电气工程"分项工程(17安装)""给水工程"分项工程(17安装)""排水工程"分项工程(17安装)""暂列金额"单项工程(17房屋建筑与装饰)""暂列金额"单位工程(17房屋建筑与装饰)""暂列金额"分项工程(17房屋建筑与装饰)""暂定部分"单项工程(17房屋建筑与装饰)""暂定金额专业工程"单位工程(17房屋建筑与装饰)""室外附属"分项工程(17房屋建筑与装饰)""合计"7494452.
82","""总价措施项目清单与计价表",,,"",,,"工程名称:新潭城市广场",,,"第1页共1页""序号","项目名称","工作内容","金额(元)""1","安全文明施工费","","1760078""2","其他总价措施费","","216371""3","防尘措施费","","13069""合计",,,"1989518""其他项目清单与计价表",,,,"",,,,"工程名称:新潭城市广场",,,,"第1页共1页""序号","项目名称","项目内容","金额(元)","1","暂列金额","",,"2","专业工程暂估价","",,"3","总承包服务费","",,"1","远程监控系统租赁费","",,"2","工程噪音超标排污费","",,"3","渣土收纳费","",,"4","优质工程增加费","",,"5","缩短定额工期增加费","",,"6","模拟清单不可预见费","",,"7","暂定金额","","7500000","合计",,,"7500000","人工、主要材料设备、施工机械价格表",,,,,,"",,,,,,"工程名称:新潭城市广场",,,,,"第1页共6页","序号","名称、规格、型号","单位","数量","基准单价","金额","风险承包幅度(%)""一","人工","元""1","定额人工费","元"193984.
52","——""2","定额人工费","元"14182213.
86","——""3","塔机人工费","元"196650","——""二","主要材料设备""三","主要施工机械""1","电压比测试仪(变比电桥)","台班","15.
144","155.
89","2360.
8","0""2","交流稳压电源","台班","55","9","495","0""3","精密交直流稳压电源","台班","0.
033","69.
93","2.
31000122070312","0""4","三相精密测试电源","台班","15.
144","74.
6","1129.
740625","0""5","数字电桥","台班","32.
821","63.
7600390625","2092.
67125","0""6","直流稳压电源","台班","55","16.
6","913","0""7","电容分压器交直流高压测量系统TPFRC","台班","2.
112","122.
390078125","258.
49015625","0""8","电能校验仪","台班","13.
915009765625","45.
8700390625","638.
2803125","0""9","真有效值万用表工业用","台班","85.
040078125","6.
0300048828125","512.
7903125","0""10","万用表手持式","台班","558.
4803125","6.
8300048828125","3814.
4225","0""11","数字电压表","台班","0.
054","4.
35","0.
230000152587891","0""12","数字温度计","台班","2.
05","17.
08","35.
01001953125","0""13","相位表","台班","25.
248","10.
330009765625","260.
81015625","0""14","相序表","台班","4.
716","4.
05000244140625","19.
1","0""15","大电流发生器2000A","台班","28.
05001953125","30.
72001953125","861.
700625","0""16","标准差压发生器PASHEN","台班","0.
320000305175781","6.
1000048828125","1.
95000122070312","0""17","标准压力发生器2656","台班","0.
572","14.
050009765625","8.
04","0""18","多功能信号校验仪","台班","1.
45000122070312","133.
190078125","193.
13015625","0""19","直流高压发生器","台班","6.
317","110.
600078125","698.
660625","0""20","转速表","台班","27.
77501953125","17.
26","479.
4003125","0""21","变压器绕组变形测试仪","台班","3.
364","52.
9600390625","178.
16015625","0""22","变压器直流电阻测试仪","台班","6.
3400048828125","20.
01","126.
860078125","0""23","电感电容测试仪","台班","4.
20500244140625","9.
4400048828125","39.
7","0""24","高压绝缘电阻测试仪","台班","92.
171","39.
84","3672.
0925","0""25","交/直流低电阻测试仪","台班","11.
646","7.
9100048828125","92.
120078125","0""26","接地电阻测试仪","台班","4.
306","9.
72","41.
8500390625","0""27","接地电阻测试仪钳形","台班","0.
150000076293945","13.
310009765625","2","0""28","接地引下线导通电阻测试仪","台班","2","14.
550009765625","29.
10001953125","0""29","真空断路器测试仪","台班","5.
892","86.
340078125","508.
7203125","0""30","计时/计频器/校准器","台班","8.
412","170.
02015625","1430.
21125","0""31","数字频率计","台班","5.
046","30.
5","153.
900078125","0""32","超声波流量计","台班","34.
5","8.
03","277.
04","0""33","对讲机","台班","392.
125","5.
5100048828125","2160.
61125","0""34","示波器","台班","4.
716","10.
340009765625","48.
7600390625","0""人工、主要材料设备、施工机械价格表",,,,,,"",,,,,,"工程名称:新潭城市广场",,,,,"第2页共6页","序号","名称、规格、型号","单位","数量","基准单价","金额","风险承包幅度(%)""35","电缆测试仪","台班","54.
687","17.
08","934.
050625","0""36","光纤测试仪","台班","1","278.
84","278.
84","0""37","微机继电保护测试仪","台班","53.
847","213.
84015625","11514.
65","0""38","彩色监视器","台班","7.
4000048828125","4.
89","36.
19001953125","0""39","电动综合校验台","台班","1.
48000122070313","10.
840009765625","16.
040009765625","0""40","高压试验变压器配套操作箱、调压器","台班","13.
056","39.
58001953125","516.
7603125","0""41","气动综合校验台","台班","0.
192","5.
4600048828125","1.
05000061035156","0""42","全自动变比组别测试仪","台班","5.
046","18.
410009765625","92.
900078125","0""43","笔记本电脑","台班","43.
4600390625","10.
240009765625","445.
0303125","0""44","电动泵压力校验仪便携式","台班","0.
0800000762939453","42.
3200390625","3.
39000244140625","0""45","火灾探测器试验器","台班","135.
590078125","4.
27","578.
9703125","0""46","振荡器","台班","25.
248","18.
200009765625","459.
5103125","0""47","介损测试仪自动","台班","2.
112","51.
9900390625","109.
800078125","0""48","履带式单斗挖掘机液压斗容量1m3","台班","26.
584","1128.
85","30009.
43","0""49","履带式单斗挖掘机液压斗容量1.
25m3","台班","9.
4000048828125","1172.
270625","11019.
9","0""50","履带式单斗挖掘机液压斗容量1.
25m3","台班","80.
634","1172.
270625","94524.
55","0""51","履带式单斗挖掘机液压斗容量1.
6m3","台班","1","1453.
17125","1453.
17125","0""52","轮胎式单斗挖掘机液压斗容量0.
6m3","台班","11.
673","531.
05","6199.
17","0""53","静力压桩机(液压)压力4000kN","台班","0.
5","3359.
3125","1679.
66125","0""54","搅拌桩机(单轴)","台班","0.
5","430.
3703125","215.
19015625","0""55","三轴搅拌桩机轴径850mm","台班","51.
703","2575.
68","133169.
19","0""56","冲击钻机22型电动","台班","66.
4950390625","303.
58015625","20186.
61","0""57","冲击钻机22型电动","台班","85.
821","303.
58015625","26053.
58","0""58","钻孔机","台班","1.
637","20.
68001953125","33.
85001953125","0""59","电动滚筒式混凝土搅拌机出料容量400L","台班","56.
721","131.
120078125","7437.
305","0""60","单卧轴式混凝土搅拌机出料容量250L","台班","0.
298","183.
33015625","54.
6500390625","0""61","灰浆搅拌机拌筒容量200L","台班","6.
3150048828125","136.
64","862.
940625","0""62","灰浆搅拌机拌筒容量200L","台班","276.
957","136.
64","37843.
39","0""63","挤压式灰浆输送泵输送量3m3/h","台班","48.
737","155.
780078125","7592.
325","0""64","混凝土喷射机生产率5m3/h","台班","83.
663","223.
89015625","18731.
33","0""65","平板式混凝土振捣器","台班","38.
746","8.
97","347.
5503125","0""66","混凝土抹平机功率5.
5kW","台班","63.
337","21.
95001953125","1390.
25","0""67","履带式推土机功率75kW","台班","14.
661","761.
660625","11166.
46","0""68","履带式推土机功率75kW","台班","2.
832","761.
660625","2157.
13125","0""69","履带式推土机功率90kW","台班","1","841.
530625","841.
530625","0""70","履带式推土机功率105kW","台班","15.
912","890.
470625","14168.
85","0""71","载货汽车装载质量4t","台班","2.
67500244140625","372.
1403125","995.
550625","0""72","载货汽车装载质量5t","台班","25.
927","384.
6503125","9972.
91","0""73","载货汽车装载质量6t","台班","172.
996","404.
2603125","69935.
25","0""74","载货汽车装载质量6t","台班","0.
257","404.
2603125","103.
790078125","0""人工、主要材料设备、施工机械价格表",,,,,,"",,,,,,"工程名称:新潭城市广场",,,,,"第3页共6页","序号","名称、规格、型号","单位","数量","基准单价","金额","风险承包幅度(%)""75","载货汽车装载质量8t","台班","19.
827","466.
2003125","9243.
49","0""76","载货汽车装载质量10t","台班","2","518.
2903125","1036.
580625","0""77","载货汽车装载质量15t","台班","29.
163","763.
960625","22279.
46","0""78","自卸汽车装载质量4t","台班","100.
409","442.
9403125","44475","0""79","自卸汽车装载质量10t","台班","1060.
863","628.
2903125","666529.
46","0""80","平板拖车组装载质量10t","台班","0.
190000152587891","766.
25","145.
590078125","0""81","平板拖车组装载质量40t","台班","2","1354.
40125","2708.
8025","0""82","平板拖车组装载质量60t","台班","2","1555.
52125","3111.
0425","0""83","平板拖车组装载质量100t","台班","10.
283","2765.
75","28441.
31","0""84","机动翻斗车装载质量1t","台班","1.
52500122070312","153.
83","234.
58015625","0""85","油罐车罐容量5000L","台班","13.
612","459.
1503125","6249.
83","0""86","轨道平车装载质量10t","台班","5.
277","80.
68","425.
7703125","0""87","皮带运输机带长*带宽15*0.
5m","台班","0.
126","221.
5","27.
83001953125","0""88","履带式电动起重机提升质量5t","台班","11.
689","186.
44015625","2179.
27125","0""89","履带式起重机提升质量15t","台班","0.
315000152587891","641.
9003125","202.
25","0""90","履带式起重机提升质量30t","台班","330.
064","814.
710625","268906.
1","0""91","履带式起重机提升质量40t","台班","0.
177","1177.
570625","207.
88015625","0""92","轮胎式起重机提升质量16t","台班","4.
654","679.
280625","3161.
6725","0""93","汽车式起重机提升质量5t","台班","8.
418","332.
5203125","2799.
2425","0""94","汽车式起重机提升质量8t","台班","36.
938","621.
6203125","22961.
67","0""95","汽车式起重机提升质量10t","台班","1.
612","690.
820625","1113.
490625","0""96","汽车式起重机提升质量16t","台班","6.
418","816.
730625","5241.
86","0""97","汽车式起重机提升质量20t","台班","-1.
056","887.
740625","-937.
570625","0""98","汽车式起重机提升质量25t","台班","3.
254","941.
380625","3063.
5325","0""99","汽车式起重机提升质量40t","台班","7.
563","1376.
83125","10413.
49","0""100","门式起重机提升质量5t","台班","0.
004","263.
27015625","1.
05000061035156","0""101","门式起重机提升质量10t","台班","4.
428","347.
5503125","1539.
12125","0""102","门式起重机提升质量20t","台班","1.
65500122070313","521.
2803125","862.
740625","0""103","门式起重机提升质量30t","台班","0.
124","617.
9603125","76.
6300390625","0""104","叉式起重机提升质量5t","台班","2.
993","414.
6603125","1241.
240625","0""105","塔式起重机起重量6t","台班","0.
066","403.
6703125","26.
80001953125","0""106","电动双梁桥式起重机提升质量5t","台班","0.
538","174.
89015625","94.
020078125","0""107","电动卷扬机单筒快速牵引力10kN","台班","0.
588","133.
89","78.
7300390625","0""108","电动卷扬机单筒慢速牵引力50kN","台班","1.
351","147.
220078125","198.
83015625","0""109","电动葫芦单速提升质量2t","台班","0.
150000076293945","29.
68001953125","4.
45000244140625","0""110","吊装机械综合","台班","18.
735009765625","541.
5203125","10145.
605","0""111","自升式塔式起重机使用费起重力矩800kN·m以内","台·天","345","915","315675","0""112","变频调速双笼施工电梯使用费提升质量2*2t提升高度100m","部·天","440","385.
3203125","169540.
8","0""113","手动液压叉车","台班","10.
22","182.
74015625","1867.
60125","0""人工、主要材料设备、施工机械价格表",,,,,,"",,,,,,"工程名称:新潭城市广场",,,,,"第4页共6页","序号","名称、规格、型号","单位","数量","基准单价","金额","风险承包幅度(%)""114","小型工程车","台班","0.
311","534.
9903125","166.
56015625","0""115","电动夯实机夯击能力20~62N.
m","台班","184.
553","27.
16001953125","5012.
4525","0""116","电动夯实机夯击能力20~62N.
m","台班","1090.
857","27.
16001953125","29627.
67","0""117","混凝土路面锯缝机不含刀片","台班","57.
1100390625","23.
04001953125","1315.
82125","0""118","自行式热熔划线车","台班","1.
375","216.
49015625","297.
72","0""119","热熔釜熔解车","台班","1.
375","462.
25","635.
69","0""120","手推式热熔底漆车","台班","1.
375","265.
64015625","365.
3103125","0""121","钢筋调直机直径40mm","台班","60.
768","28.
86001953125","1753.
77125","0""122","钢筋切断机直径40mm","台班","191.
299","39.
14001953125","7487.
43","0""123","钢筋弯曲机直径40mm","台班","423.
222","23.
86001953125","10098.
07","0""124","普通车床工件直径*工件长度400*1000mm","台班","0.
680000610351563","140.
290078125","95.
400078125","0""125","普通车床工件直径*工件长度400*2000mm","台班","1.
253","152.
710078125","191.
32015625","0""126","普通车床工件直径*工件长度630*2000mm","台班","6.
116","175.
46015625","1073.
030625","0""127","端部铣床","台班","1.
239","138.
460078125","171.
51015625","0""128","立式钻床钻孔直径25mm","台班","56.
436","6.
4900048828125","366.
2703125","0""129","立式钻床钻孔直径35mm","台班","2.
056","10.
380009765625","21.
35001953125","0""130","立式钻床钻孔直径50mm","台班","1.
40000122070312","19.
480009765625","27.
27001953125","0""131","台式钻床钻孔直径16mm","台班","140.
666","3.
99000244140625","561.
2603125","0""132","台式钻床钻孔直径35mm","台班","40.
912","9.
03","369.
4403125","0""133","摇臂钻床Z3050*16/1","台班","0.
485000305175781","134.
380078125","65.
24","0""134","数控平板钻床CDMP2012","台班","0.
485000305175781","306.
09","148.
600078125","0""135","数控转角带锯床SAW1260","台班","0.
485000305175781","235.
60015625","114.
380078125","0""136","剪板机厚度*宽度6.
3*2000mm","台班","7.
4900048828125","163.
98015625","1228.
16","0""137","剪板机厚度*宽度40*3100mm","台班","0.
873","546.
43","476.
8003125","0""138","卷板机厚度*宽度2*1600mm","台班","0.
074","156.
42","11.
560009765625","0""139","卷板机厚度*宽度20*2500mm","台班","0.
012","197.
15015625","2.
37000122070312","0""140","联合冲剪机板厚16mm","台班","0.
052","247.
48015625","12.
950009765625","0""141","折方机厚度*宽度4*2000mm","台班","7.
416","30.
80001953125","228.
41015625","0""142","扳边机厚度*宽度2*1500mm","台班","0.
0650000381469727","16.
460009765625","1.
08000061035156","0""143","刨边机加工长度12000mm","台班","1.
933","480.
5703125","929.
120625","0""144","管子切断机Φ60~150","台班","0.
577","25.
56001953125","14.
740009765625","0""145","管子切断机Φ60","台班","5.
3200048828125","15.
430009765625","82.
090078125","0""146","管子切断机Φ150","台班","142.
351","31.
61001953125","4499.
7125","0""147","螺栓套丝机Φ39","台班","1382.
52125","25.
12001953125","34728.
9","0""148","管子切断套丝机Φ159","台班","236.
063","20.
08","4740.
15","0""149","咬口机板厚1.
5mm","台班","7.
497","16.
040009765625","120.
25","0""150","弓锯床锯料直径250mm","台班","1.
032","22.
91001953125","23.
64001953125","0""151","法兰卷圆机L40*4","台班","1.
131","31.
72001953125","35.
88","0""人工、主要材料设备、施工机械价格表",,,,,,"",,,,,,"工程名称:新潭城市广场",,,,,"第5页共6页","序号","名称、规格、型号","单位","数量","基准单价","金额","风险承包幅度(%)""152","台式砂轮机Φ100","台班","2.
40000122070313","3.
32000244140625","7.
9700048828125","0""153","滚刮机","台班","5.
3100048828125","61.
4500390625","326.
28","0""154","滚槽机","台班","267.
147","61.
1100390625","16325.
35","0""155","液压矫正机YJZ-60B","台班","0.
690000610351562","376.
8403125","260.
19015625","0""156","管道切割坡口机ISD-300","台班","0.
068","73.
6","5","0""157","万能母线煨弯机","台班","15.
606","27.
10001953125","422.
9303125","0""158","液压断管机直径500mm","台班","0.
538","110.
400078125","59.
3500390625","0""159","混凝土切缝机功率7.
5kW","台班","2.
80000244140625","28.
48001953125","79.
74","0""160","后切式石料加工机","台班","41.
511","15.
360009765625","637.
6103125","0""161","电动揋弯机100以内","台班","5.
2050048828125","52.
7200390625","274.
42015625","0""162","电动揋弯机弯曲直径500~1800mm","台班","1.
22000061035156","84.
510078125","103.
080078125","0""163","木工圆锯机直径500mm","台班","249.
68015625","24.
13001953125","6024.
785","0""164","木工圆锯机直径500mm","台班","1.
433","24.
13001953125","34.
59","0""165","木工单面压刨床刨削宽度600mm","台班","0.
042","30.
61001953125","1.
28000122070313","0""166","半自动切割机厚度100mm","台班","6.
069","80.
6300390625","489.
3203125","0""167","砂轮切割机Φ400","台班","77.
832","5.
4600048828125","424.
9603125","0""168","砂轮切割机Φ500","台班","2.
466","6.
0200048828125","14.
840009765625","0""169","氧割设备","台班","10.
103","104.
830078125","1059.
12","0""170","电动打磨机","台班","80.
518","12.
670009765625","1020.
170625","0""171","等离子切割机400A","台班","0.
836","212.
40015625","177.
52015625","0""172","数控切割机CNC/GDZ-400","台班","2.
789","219.
68015625","612.
68","0""173","交流弧焊机容量21kVA","台班","480.
9403125","54.
7700390625","26341.
11","0""174","交流弧焊机容量30kVA","台班","7.
744","89.
460078125","692.
780625","0""175","交流弧焊机容量32kVA","台班","1.
514","80.
3000390625","121.
540078125","0""176","交流弧焊机容量32kVA","台班","15.
907","80.
3000390625","1277.
320625","0""177","直流弧焊机容量20kV·A","台班","1.
331","68.
5200390625","91.
170078125","0""178","直流弧焊机功率20kW","台班","3.
431","68.
5200390625","235.
07015625","0""179","直流弧焊机容量32kV·A","台班","123.
608","84.
530078125","10448.
585","0""180","直流弧焊机功率32kW","台班","610.
718","84.
530078125","51624.
01","0""181","对焊机容量75kVA","台班","149.
172","103.
610078125","15455.
73","0""182","氩弧焊机电流500A","台班","83.
513","88.
110078125","7358.
365","0""183","二氧化碳气体保护焊机电流500A","台班","10.
118","120.
440078125","1218.
64","0""184","二氧化碳气体保护焊机NB500","台班","191.
468","131.
33","25145.
51","0""185","电渣焊机电流1000A","台班","96.
403","153.
620078125","14809.
43","0""186","点焊机容量75kV·A","台班","23.
414","127.
540078125","2986.
1925","0""187","埋弧焊接机","台班","5.
884","279.
03","1641.
92125","0""188","埋弧气刨机ZX5-1000","台班","192.
353","111.
180078125","21385.
85","0""189","电焊机","台班","337.
192","60.
8400390625","20514.
74","0""190","电焊机21kVA","台班","1.
206","60.
8400390625","73.
4","0""191","交流电焊机容量21kVA","台班","200.
751","60.
8400390625","12213.
69","0""人工、主要材料设备、施工机械价格表",,,,,,"",,,,,,"工程名称:新潭城市广场",,,,,"第6页共6页","序号","名称、规格、型号","单位","数量","基准单价","金额","风险承包幅度(%)""192","交流电焊机容量21kVA","台班","6.
0900048828125","60.
8400390625","370.
5203125","0""193","交流电焊机容量21kVA","台班","0.
044","60.
8400390625","2.
71000244140625","0""194","交流电焊机容量30kVA","台班","8.
428","89.
460078125","753.
960625","0""195","热熔对接焊机160mm","台班","9.
411","15.
610009765625","146.
900078125","0""196","焊剂烘干机YJJ-A-300","台班","1.
618","38.
97001953125","63.
0600390625","0""197","百米钻机XY-100","台班","85.
154","262.
20015625","22327.
32","0""198","平台作业升降车提升高度9m","台班","1","288.
68015625","288.
68015625","0""199","试验变压器YDQ充气式","台班","10.
944","56.
5800390625","619.
2103125","0""200","电动空气压缩机排气量0.
3m3/min","台班","40.
85001953125","27.
98001953125","1142.
980625","0""201","电动空气压缩机排气量0.
6m3/min","台班","26.
767","34.
44001953125","921.
860625","0""202","电动空气压缩机排气量1m3/min","台班","243.
376","47.
2000390625","11487.
37","0""203","电动空气压缩机排气量6m3/min","台班","0.
059","200.
45015625","11.
910009765625","0""204","电动空气压缩机排气量10m3/min","台班","61.
5750390625","346.
3903125","21328.
93","0""205","千斤顶拔桩设备","台班","59.
887","416.
8303125","24962.
74","0""206","电动单级离心清水泵出口直径Φ50","台班","4800","25.
53001953125","122544","0""207","电动单级离心清水泵出口直径Φ100","台班","3.
5","31.
66001953125","110.
800078125","0""208","电动单级离心清水泵出口直径Φ200","台班","0.
052","81.
29","4.
26000244140625","0""209","电动多级离心清水泵出口直径Φ50","台班","50.
3250390625","47.
5700390625","2393.
96125","0""210","电动多级离心清水泵出口直径Φ100扬程120m以下","台班","28.
60001953125","146.
870078125","4200.
48","0""211","污水泵出口直径Φ50","台班","33","156.
400078125","5161.
2025","0""212","试压泵压力3MPa","台班","41.
839","16.
450009765625","688.
25","0""213","试压泵压力10MPa","台班","1.
95000122070312","19.
930009765625","38.
86001953125","0""214","试压泵压力30MPa","台班","0.
0100000095367432","21.
47001953125","0.
210000152587891","0""215","试压泵压力60MPa","台班","4.
922","22.
90001953125","112.
700078125","0""216","高压注浆泵XPB-90B","台班","5.
25","310","1627.
5","0""217","电动多级离心清水泵(停滞)φ50","台班","61","4.
33000244140625","264.
13015625","0""218","开孔机开孔直径200mm","台班","10.
924","189.
67015625","2071.
87125","0""219","电锤520W","台班","41.
807","6.
8600048828125","286.
80015625","0""220","冲击成孔机CZ-30","台班","0.
5","301.
36015625","150.
680078125","0""221","其他机械费","元","473.
183","1","473.
1803125","0""222","其他机械费","元","43006.
11","1","43006.
11","0""223","铭牌打印机","台班","1.
824","33.
38","60.
8900390625","0""224","恒温箱","台班","1.
618","59.
5600390625","96.
380078125","0""225","电焊条恒温箱","台班","9.
226","49","452.
0803125","0""226","电焊条烘干箱容积450*350*450","台班","67.
571","15.
780009765625","1066.
270625","0""227","电焊条烘干箱容积600*500*750","台班","9.
779","25","244.
48015625","0"

福州云服务器 1核 2G 2M 12元/月(买5个月) 萤光云

厦门靠谱云股份有限公司 双十一到了,站长我就给介绍一家折扣力度名列前茅的云厂商——萤光云。1H2G2M的高防50G云服务器,依照他们的规则叠加优惠,可以做到12元/月。更大配置和带宽的价格,也在一般云厂商中脱颖而出,性价比超高。官网:www.lightnode.cn叠加优惠:全区季付55折+满100-50各个配置价格表:地域配置双十一优惠价说明福州(带50G防御)/上海/北京1H2G2M12元/月...

SugarHosts糖果主机,(67元/年)云服务器/虚拟主机低至半价

SugarHosts 糖果主机商也算是比较老牌的主机商,从2009年开始推出虚拟主机以来,目前当然还是以虚拟主机为主,也有新增云服务器和独立服务器。早年很多网友也比较争议他们家是不是国人商家,其实这些不是特别重要,我们很多国人商家或者国外商家主要还是看重的是品质和服务。一晃十二年过去,有看到SugarHosts糖果主机商12周年的促销活动。如果我们有需要香港、美国、德国虚拟主机的可以选择,他们家的...

老薛主机VPS年付345元,活动进行时。

老薛主机,虽然是第一次分享这个商家的信息,但是这个商家实际上也有存在有一些年头。看到商家有在进行夏季促销,比如我们很多网友可能有需要的香港VPS主机季度及以上可以半价优惠,如果有在选择不同主机商的香港机房的可以看看老薛主机商家的香港VPS。如果没有记错的话,早年这个商家是主营个人网站虚拟主机业务的,还算不错在异常激烈的市场中生存到现在,应该算是在众多商家中早期积累到一定的用户群的,主打小众个人网站...

怎样关闭445端口为你推荐
nested苹果5adbandroid支持ipad支持ipad支持ipad支持ipadfusionchartsfusioncharts怎么生成图片至excelcanvas2动漫cv井口裕香,都有哪些作品?iphonewifi苹果wifi版和4G版是什么意思,有什么区别吗google中国地图求教谷歌中国地图~手机如何使用?
asp网站空间 国外域名 网址域名注册 个人域名注册 日本软银 edgecast dns是什么 la域名 idc测评网 wdcp lamp配置 个人免费空间 phpmyadmin配置 1g空间 贵阳电信 ssl加速 七十九刀 windowsserver2012r2 删除域名 nic 更多