pollutionWaste Management - Intranet Site Unavailable

unavailable  时间:2021-02-28  阅读:()

FM ENV 016 Waste Management Environmental Management Procedure

Safety,Health&Environment Section

Environmental Management System(EMS)

FM/ENV/016

Waste Management

Environmental ManagementP roced u re

June2015

Version 3.0

Document review due:June 2016

Please Note:Prior to migration to SharePoint this document was on version 6.0.This is acontrol led document,please ensure you are using the most recent version avai lable on theUCLan intranet.

FM ENV 016 Waste Management Environmental Management ProcedureDocument History

References

FM ENV 016 Waste Management Environmental Management ProcedureDocument Control

FM ENV 016 Waste Management Environmental Management ProcedureC o n te n ts

1 Introduction

2 UCLan Waste Streams

3 Process Overview of Waste Management at UCLan

4 Non-Hazardous Waste Disposal

5 Waste Electrical and Electronic Equipment (WEEE)Disposal6 Hazardous Waste Disposal

7 Clinical Waste Disposal

8 Food Waste

9 Liquid Effluent

10 Flytipping

11 Radiological Waste Management

12 Contractor Management and Dutyof Care

13 Data Management

14 Legal or Other Requirements

15 Appendix A:Waste Management Definitions

16 Appendix B:Waste Management Hierarchy

17 Appendix C:Non-Hazardous Waste Codes

18 Appendix D:Categories of EEE covered bythe WEEE Regulations19 Appendix E:Hazard Properties&Risk Phrases

FM ENV 016 Waste Management Environmental Management Procedure

1 Introduction

1.1 Purpose

This procedure describes the approach UCLan wi l l take to manage and mitigate its‟wastemanagement as a category of significant environmental aspects (FMENV004),within theUniversity‟s Environmental Management System (EMS), to ensure the University‟soperations remain compl iant with relevant parts of its:

 Environmental Sustainabi l ity Pol icy;

“Use natural resources prudently and prevent pollution by identifying improvement targets,whilst adhering to the following key principles:

- Provide training and information to all staff and students to facilitate prudent use ofnatural resources;

- Champion the reduction of waste following the reduce, reuse, recycle hierarchy, toinclude the provision of suitable segregation and composting facilities;

- Address the root cause,rather than the symptoms,of resource wastage whereverpossible;”

 Environmental Management Plan 2013-2016

 Contribution to compl iance/maintenance of the University‟s position in relation towaste reduction and recycl ing as measured in initiatives l ike the People and Planet

Green League,HEFCE/HESAEstate Management Records

 Register of Legal Compl iance and Other Requirements (see Newground Business

Services).Contact Greenteam@uclan.ac.uk for log-in accesso Environmental Protection Act 1990o The Waste(England&Wales)Regulations 2011 amended 2012o Control led Waste(England&Wales)Regulations 2012o The Hazardous Waste(England and Wales)Regulations 2005 amended

2009o Landfi l l Tax(England&Wales)Regulations 1996,amended 2013o WEEE Regulations 2013o The Environmental Permitting(England and Wales)Regulations 2010amended 2014o List of Wastes(England)Regulations 2005o Site Waste Management Plans Regulations 2008o The Animal By-Products(Enforcement) (England)Regulations 2011o The Waste Batteries and Accumulators Regulations 2009

UCLan‟s Environmental Aspects Register (FMENV004) identifieswaste disposal as theaspect of University‟s waste management activities that hasthe most significant impact onthe environment.Waste disposal wi l l therefore be the focus of our mitigation andmanagement within the EMS. However, as a matter of good practice we wi l l also outl ineissues to be considered to improve reduction, re-use and recycl ing of waste throughout theUnivers ity.

Please note that site waste management plans for building contracts will only be touchedupon within this procedure,FM ENV 015 Land Development and Buildings will deal with thisarea of waste management in further detail.

FM ENV 016 Waste Management Environmental Management Procedure

1.2 Scope

This document appl ies to operations conducted from the University‟s Preston campusesincluding those of UCLan maintenance engineers.Contractors working on University sitesare required to manage and dispose of their own waste.

1.3 Responsibilities

This document appl ies to staff within the University who are responsible for elements of thewaste managementprocess l isted in section 1.1 . These general responsibi l ities aresummarized in the table below.

Further detai ls of specific role responsibi l ities can be accessed in EMS Manual (FMENV003).Within SHE Training Needs Analysis(FMENV018) the training and development required bythe responsible parties are outl ined to ensure adequate experience and competence.

FM ENV 016 Waste Management Environmental Management Procedure

1.4 Continual Improvement

The University wi l l monitor the implementation of the operational controls identified withinthis procedure using a combination of internal audits and targets.

These targets wi l l be part of a programme of improvement under an overal l continualimprovement objective for Waste in the Environmental Management Plan (FMENV020).Each significant type of waste management identified as having a significant impact wi l l havean associated target.

FM ENV 016 Waste Management Environmental Management Procedure

2 UCLanWasteStreams

Al l Schools and Services at UCLan wi l l generate office type waste;

General waste, paper, confidential waste, plastics, card, batteries, packaging, glass andcans as wel l as surplus furniture,stationery and smal l items of WEEE.

Additional waste streams generated as a result of University activities are detai led in Figure2.The principal dispos‟al route is via Faci l ities Management with the exception of Learning andInformation Service s special waste streams.

Figure 2-UCLan Waste Streams

Learning and Information Services (LIS)special waste disposal is bui lt into contracts

FM ENV 016 Waste Management Environmental Management Procedure3 Process Overview of Waste Management at UCLan

HostKvm(4.25美)香港和俄罗斯高防机房云服务器

HostKvm 商家我们算是比较熟悉的国内商家,商家主要还是提供以亚洲数据中心,以及直连海外线路的服务商。这次商家有新增香港和俄罗斯两个机房的高防服务器方案。默认提供30GB防御,且目前半价优惠至4.25美元起步,其他方案的VPS主机还是正常的八折优惠。我们看看优惠活动。香港和俄罗斯半价优惠:2021fall,限购100台。通用优惠码:2021 ,八折优惠全部VPS。我们看看具体的套餐。1、香港高...

VirtVPS抗投诉瑞士VPS上线10美元/月

专心做抗投诉服务器的VirtVPS上线瑞士机房,看中的就是瑞士对隐私的保护,有需要欧洲抗投诉VPS的朋友不要错过了。VirtVPS这次上新的瑞士服务器采用E-2276G处理器,Windows/Linux操作系统可选。VirtVPS成立于2018年,主营荷兰、芬兰、德国、英国机房的离岸虚拟主机托管、VPS、独立服务器、游戏服务器和外汇服务器业务。VirtVPS 提供世界上最全面的安全、完全受保护和私...

iON Cloud:七月活动,洛杉矶CN2 GIA线路85折优惠中,价格偏高/机器稳定/更新优惠码

iON Cloud怎么样?iON Cloud是Krypt旗下的云服务器品牌,成立于2019年,是美国老牌机房(1998~)krypt旗下的VPS云服务器品牌,主打国外VPS云服务器业务,均采用KVM架构,整体性能配置较高,云服务器产品质量靠谱,在线率高,国内直连线路,适合建站等用途,支付宝、微信付款购买。支持Windows server 2012、2016、2019中英文版本以及主流Linux发行...

unavailable为你推荐
办公协同软件协同企业办公的软件有哪些?滚动代码来回滚动代码硬盘人移动硬盘的优缺点开机滚动条电脑开机滚动条要走好几次ios7固件下载ios7发布当天是否有固件下载mate8价格华为麦特八多少价格如何快速收录如何做到让百度快速收录网络广告投放网络广告的投放目的是什么?系统分析员系统分析师是什么职业?主要做什么工作?网管工具网管软件好用吗?什么样的网管软件好呢?我想管理二十台电脑,让其中的四五台可以上网,其它的只能上局域网,谁能推荐一款软件吗?如果出钱买也可以!谢谢了!
最新代理服务器ip 2019年感恩节 openv webhosting 外国服务器 themeforest cdn服务器 好玩的桌面 中国特价网 500m空间 200g硬盘 t云 in域名 空间租赁 lamp架构 websitepanel 电信测速器在线测网速 screen neicun qq部落24-5 更多