FM ENV 016 Waste Management Environmental Management Procedure

Safety,Health&Environment Section

Environmental Management System(EMS)

FM/ENV/016

Waste Management

Environmental ManagementP roced u re

June2015

Version 3.0

Document review due:June 2016

Please Note:Prior to migration to SharePoint this document was on version 6.0.This is acontrol led document,please ensure you are using the most recent version avai lable on theUCLan intranet.

FM ENV 016 Waste Management Environmental Management ProcedureDocument History

References

FM ENV 016 Waste Management Environmental Management ProcedureDocument Control

FM ENV 016 Waste Management Environmental Management ProcedureC o n te n ts

1 Introduction

2 UCLan Waste Streams

3 Process Overview of Waste Management at UCLan

4 Non-Hazardous Waste Disposal

5 Waste Electrical and Electronic Equipment (WEEE)Disposal6 Hazardous Waste Disposal

7 Clinical Waste Disposal

8 Food Waste

9 Liquid Effluent

10 Flytipping

11 Radiological Waste Management

12 Contractor Management and Dutyof Care

13 Data Management

14 Legal or Other Requirements

15 Appendix A:Waste Management Definitions

16 Appendix B:Waste Management Hierarchy

17 Appendix C:Non-Hazardous Waste Codes

18 Appendix D:Categories of EEE covered bythe WEEE Regulations19 Appendix E:Hazard Properties&Risk Phrases

FM ENV 016 Waste Management Environmental Management Procedure

1 Introduction

1.1 Purpose

This procedure describes the approach UCLan wi l l take to manage and mitigate its‟wastemanagement as a category of significant environmental aspects (FMENV004),within theUniversity‟s Environmental Management System (EMS), to ensure the University‟soperations remain compl iant with relevant parts of its:

 Environmental Sustainabi l ity Pol icy;

“Use natural resources prudently and prevent pollution by identifying improvement targets,whilst adhering to the following key principles:

- Provide training and information to all staff and students to facilitate prudent use ofnatural resources;

- Champion the reduction of waste following the reduce, reuse, recycle hierarchy, toinclude the provision of suitable segregation and composting facilities;

- Address the root cause,rather than the symptoms,of resource wastage whereverpossible;”

 Environmental Management Plan 2013-2016

 Contribution to compl iance/maintenance of the University‟s position in relation towaste reduction and recycl ing as measured in initiatives l ike the People and Planet

Green League,HEFCE/HESAEstate Management Records

 Register of Legal Compl iance and Other Requirements (see Newground Business

Services).Contact Greenteam@uclan.ac.uk for log-in accesso Environmental Protection Act 1990o The Waste(England&Wales)Regulations 2011 amended 2012o Control led Waste(England&Wales)Regulations 2012o The Hazardous Waste(England and Wales)Regulations 2005 amended

2009o Landfi l l Tax(England&Wales)Regulations 1996,amended 2013o WEEE Regulations 2013o The Environmental Permitting(England and Wales)Regulations 2010amended 2014o List of Wastes(England)Regulations 2005o Site Waste Management Plans Regulations 2008o The Animal By-Products(Enforcement) (England)Regulations 2011o The Waste Batteries and Accumulators Regulations 2009

UCLan‟s Environmental Aspects Register (FMENV004) identifieswaste disposal as theaspect of University‟s waste management activities that hasthe most significant impact onthe environment.Waste disposal wi l l therefore be the focus of our mitigation andmanagement within the EMS. However, as a matter of good practice we wi l l also outl ineissues to be considered to improve reduction, re-use and recycl ing of waste throughout theUnivers ity.

Please note that site waste management plans for building contracts will only be touchedupon within this procedure,FM ENV 015 Land Development and Buildings will deal with thisarea of waste management in further detail.

FM ENV 016 Waste Management Environmental Management Procedure

1.2 Scope

This document appl ies to operations conducted from the University‟s Preston campusesincluding those of UCLan maintenance engineers.Contractors working on University sitesare required to manage and dispose of their own waste.

1.3 Responsibilities

This document appl ies to staff within the University who are responsible for elements of thewaste managementprocess l isted in section 1.1 . These general responsibi l ities aresummarized in the table below.

Further detai ls of specific role responsibi l ities can be accessed in EMS Manual (FMENV003).Within SHE Training Needs Analysis(FMENV018) the training and development required bythe responsible parties are outl ined to ensure adequate experience and competence.

FM ENV 016 Waste Management Environmental Management Procedure

1.4 Continual Improvement

The University wi l l monitor the implementation of the operational controls identified withinthis procedure using a combination of internal audits and targets.

These targets wi l l be part of a programme of improvement under an overal l continualimprovement objective for Waste in the Environmental Management Plan (FMENV020).Each significant type of waste management identified as having a significant impact wi l l havean associated target.

FM ENV 016 Waste Management Environmental Management Procedure

2 UCLanWasteStreams

Al l Schools and Services at UCLan wi l l generate office type waste;

General waste, paper, confidential waste, plastics, card, batteries, packaging, glass andcans as wel l as surplus furniture,stationery and smal l items of WEEE.

Additional waste streams generated as a result of University activities are detai led in Figure2.The principal dispos‟al route is via Faci l ities Management with the exception of Learning andInformation Service s special waste streams.

Figure 2-UCLan Waste Streams

Learning and Information Services (LIS)special waste disposal is bui lt into contracts

FM ENV 016 Waste Management Environmental Management Procedure3 Process Overview of Waste Management at UCLan

RAKsmart含站群服务器/10G带宽不限流量首月半价

RAKsmart 商家估摸着前段时间服务器囤货较多,这两个月的促销活动好像有点针对独立服务器。前面才整理到七月份的服务器活动在有一些配置上比上个月折扣力度是大很多,而且今天看到再来部分的服务器首月半价,一般这样的促销有可能是商家库存充裕。比如近期有一些服务商挖矿服务器销售不好,也都会采用这些策略,就好比电脑硬件最近也有下降。不管如何,我们选择服务器或者VPS主机要本着符合自己需求,如果业务不需要,...

hosthatch:14个数据中心15美元/年

hosthatch在做美国独立日促销,可能你会说这操作是不是晚了一个月?对,为了准备资源等,他们拖延到现在才有空,这次是针对自己全球14个数据中心的VPS。提前示警:各个数据中心的网络没有一个是针对中国直连的,都会绕道而且ping值比较高,想买的考虑清楚再说!官方网站:https://hosthatch.com所有VPS都基于KVM虚拟,支持PayPal在内的多种付款方式!芝加哥(大硬盘)VPS5...

Sharktech:美国/荷兰独立服务器,10Gbps端口/不限流量/免费DDoS防护60G,319美元/月起

sharktech怎么样?sharktech (鲨鱼机房)是一家成立于 2003 年的知名美国老牌主机商,又称鲨鱼机房或者SK 机房,一直主打高防系列产品,提供独立服务器租用业务和 VPS 主机,自营机房在美国洛杉矶、丹佛、芝加哥和荷兰阿姆斯特丹,所有产品均提供 DDoS 防护。此文只整理他们家10Gbps专用服务器,此外该系列所有服务器都受到高达 60Gbps(可升级到 100Gbps)的保护。...

unavailable为你推荐
绵阳电信绵阳电信营业厅哪家最大手机最全优酷路由宝怎么赚钱优酷路由宝整的可以赚钱吗?可以赚多少?万网核心代理在万网代理商购买万网产品,谁知道价格?知道的说下?伪静态伪静态和真静态哪种静态方式好xv播放器下载迅雷看看下载的XV格式的电影用什么播放器可以播放?(没有互联网的情况下)怎么点亮qq空间图标QQ空间图标怎么点亮?雅虎天盾有没有用用雅虎天盾的啊?发邮件怎么发怎样发送邮件freebsd安装最近安装了FreeBSD安装的时候没创建普通用户,然后用超级用户的身份进入系统,但是超级用户只有一个#提示符,怎么在超级用户下去创建一个普通的用户了?怎么在图片上写文字如何在图片上写文字
四川虚拟主机 最便宜的vps 漂亮qq空间 linode日本 hawkhost uk2 mediafire 视频存储服务器 阿里云代金券 彩虹ip 合肥鹏博士 ibox官网 789电视网 in域名 域名dns 跟踪路由命令 万网空间管理 独立主机 atom处理器 购买空间 更多