A map of construction drawings
June 08, 2009 04:51
A map of construction drawings
I. structure design description
1. Main design basis. Expound the approval of the higherauthority (the government) , the national standards, norms andso on.
2. Natural conditions and usage requirements. Geologicalexploration data, seismic fortification cracking, snow loadand special requirements for structure from use.
3. Construction requirements
4. Quality requirements for materials.
Structure layout plan
1. Basic layout plan and basic details.
2. Layout plan and node details of floor structure.
3. Layout plan and node details of stage top structure.
3. Detail drawings of components
1. Detailed drawings of beam column and other components.
2. Detailed diagram of stair structure.
3. Detailed drawings of other components.
Iv. Basic chart reading
Find out whether the plane layout of the foundation wall isconsistent with the first floor plan of the construction plan.2, combined with layout and detail of reading, clearly thelocation of wall and axis, axis symmetric axis or partial, ifpartial axis, the note which side wide, narrow, which side sizei s how much.
3. Identify the dimensions of each part and the elevation ofthe main parts in the basic details.
4. Find out the location, size and specific practice of thetrench.
5. Identification of various materials and requirements formaterials.
5. Main contents of the layout plan of prefabricated assemblybuildings
1. Axis.
2. Walls and columns.
3. Beam and beam mat. When the beam is suspended on a brick orzhuan column, a reinforced concrete beam mat is required toavoid the wall or column being crushed. LD.
4. Precast floor.
5. Overbeam and canopy.
6.
Read the diagram and the steps
1. Find out the meanings of various words, letters and symbols.To understand the meaning of various symbols, you must firstunderstand the common building codes, the combination of thepictures and the words.
2. Find out the space position of various components. If thefloor is on the first floor, which room will be decorated witha few varieties of components, the number of each variety ofcomponents and so on.
3. The layout of the building is combined with the statisticaltable of the components to find out the number of variouscomponents in the building, and the location of the drawing setand detailed drawing.
4. Understand the interconnection and construction practicesof various components. In order to strengthen the whole bodyof prefabricated assembly building and improve earthquakeresistance, it is necessary to place steel bar inside theprefabricated slab and sew with C20 fine stone concrete.Read the instructions and understand the design intention andconstruction requirements. The text description is placed inthe structure layout and some in the structure design.
6. Now water the whole building to try the method
1. Find out the section size, external shape and location ofthe member.
2. The diagram shows the shape, quantity and position of varioussteel bars.
3. Check whether the quantity required in the chart isconsistent.
4. Understand the level of reinforcement, grade of concretestrength and requirements of construction and components.
5. Specify the location of the embedded iron and reservedholes.
A map of architecture
1. Read the general plan
1
This is the basic knowledge that the general plan should have.
2. Understand the engineering nature and surroundingenvironment
The purpose of the building of the engineering properties.
3. View the elevation and terrain
The elevation and topographic map can be used to construct theoriginal landform of the pre-building area.
4. Find the location basis
Determining the location of the building is the main functionof the overall plan.
5. Roads and greening
Road and greening are the supporting projects of main project.
2. Reading the floor plan
(1) reading the method of floor plan
1. Check the orientation, shape, layout and interrelation ofthe building.
The size of each part of the composite building.
3. Refer to the building materials used in the building wall(column) . May be choreographed in the design of the totalstatement, also may be choreographed in the structure designspecification.
4. Check the elevation of each part. The main reference is theroom, toilet, stair and outdoor floor elevation.
5. Check the size and number of doors and Windows. The checkmethod is to check whether the actual number in the chart isconsistent with the number of the Windows and doors.
6. Check the plane location of the ancillary facilities. Be liketoilet wash trough, toilet room of squat and urine the planeposition of urine trough etc.
7. Refer to the text description and consult the requirementson construction and materials. To combine architectural designinstructions with this question.
(2) reading the notes of other floor plans
1. Find out whether the layout of each room is the same as thefloor plan. There will be great changes in the layout of thebuildings along the street.
2. Find out if thewall thickness is the sameas thebottomplan.
3. Whether the doors and Windows are the same as the floor plan.In the civil building middle wall window generally should addsecurity measure. Like a window fence.
4. Whether the building materials used are the same as the floorplan. In architecture, the height of the house is different,and the quality of building materials is different.
(3) reading the main points of the floor plan
1. Drainage direction of roof, drainage slope and drainagearea.
2. Combine the details of the reading, to find out thewater-proof and water-repellent ways of the split joint, thepanshui, and the roof.
3. Read the elevation plan
1. To read the plan, check the relationship between theelevation drawing and the plan, so that the three-dimensionalsense can be established, and the understanding of the plan andelevation drawing is deepened.
2. Understand the external shape of the building.
3. Refer to the elevation and corresponding dimensions of eachpart of the building.
4. Inspect the decorationpractices of the various parts of thebuilding. Such as porch, window sill, window eaves, rain shed,le foot.
5. Others. According to the related drawings, consult theexternal wall, the doors and Windows. Glass and otherconstruction requirements.
Iv. Reading methods and procedures for external walls
1. Grasp the scope of the wall body section.
2. Master the hierarchical representation method in the graph,
3. Master the relationship between building and wall. Therelation between floor board and wall is two kinds that relyon wall and wall commonly.
4. In combination with the architectural design description ormaterial practice reading, master the construction practice ofthe details.
Notes:
1. Based on the wall of + -0, 00 or below moisture proof, theconstruction practice should be based on the basic picture. In+ - 0, 00 or above the wall of moisture-proof layer above, theconstruction method is based on the building drawing, and payattention to the connection relation and the method ofmoisture-proof layer.
2. Floor, floor, roof, loose water, leproe, women' s wall,gutter and other details combined with architectural designinstructions or materials.
3. Pay attention to the difference between building elevationand structure elevation.
5. Reading methods and steps of stair detail
Find out the axis number and understand the position anddirection of the stair in the building.
2. Find out the dimensions of the staircase. It includes thesize of the stairway, the size of the staircase, the width ofthe tread, the plane size of the rest platform, etc.
3. According to the cutting position and projection directionof the mark on the plane graph, the height of each part of thestaircase is read by the section. Include floor, rest platform,floor elevation and kick, stair door and window entrance, rail,handrail height, etc.
4. Find out the construction materials and connection methodsused for handrails.
5. Combine the architectural designdescription to find out theway to decorate the steps (floor) , railings and handrails. Thecontents include the specific practice of stepping, railing,handrail (metal, wood etc. ) and paint color and paintingprocess etc.
puaex怎么样?puaex是一家去年成立的国人商家,本站也分享过几次,他家主要销售香港商宽的套餐,给的全部为G口带宽,而且是不限流量的,目前有WTT和HKBN两种线路的方面,虽然商家的价格比较贵,但是每次补一些货,就会被抢空,之前一直都是断货的状态,目前商家进行了补货,有需要这种类型机器的朋友可以入手。点击进入:puaex商家官方网站Puaex香港vds套餐:全部为KVM虚拟架构,G口的带宽,可...
最近我们是不是在讨论较多的是关于K12教育的问题,培训机构由于资本的介入确实让家长更为焦虑,对于这样的整改我们还是很支持的。实际上,在云服务器市场中,我们也看到内卷和资本的力量,各大云服务商竞争也是相当激烈,更不用说个人和小公司服务商日子确实不好过。今天有看到UCloud发布的夏季促销活动,直接提前和双十一保价挂钩。这就是说,人家直接在暑假的时候就上线双十一的活动。早年的双十一活动会提前一周到十天...
Cloudxtiny是一家来自英国的主机商,提供VPS和独立服务器租用,在英国肯特自营数据中心,自己的硬件和网络(AS207059)。商家VPS主机基于KVM架构,开设在英国肯特机房,为了庆祝2021年欧洲杯决赛英格兰对意大利,商家为全场VPS主机提供50%的折扣直到7月31日,优惠后最低套餐每月1.5英镑起。我们对这场比赛有点偏见,但希望这是一场史诗般的决赛!下面列出几款主机套餐配置信息。CPU...