零件PTR-1205D-生产试运行流程

ptr  时间:2021-02-07  阅读:()

验证生产制造工艺可行性 Qualifying the possibility ofmanufacturingprocess.

and re-used obsolete part

3.术语

3.1生产试运行(P T R) 3. T erm s

新零件或更改过的零件投入到制造系 3.1 Production Trial Run(PTR)

统前的受控的先期试生产。 A Production Trial Run is a controlled,advancedproduction tryout of any new or revised part/component

PTR小组为实施某一特定PTR而设立

的非常设机构。成员由车间质量产品工 3.2 PTR team and team leader

The Specs control engineer of PC&L takes theresponsibility of PTR team leader.

4.责任

4.1组长根据申请召集P T R小组会 与生产 4.Re sp on sibiliti e s

车间商定PTR时间 签发PTR通知单 采 4.1 The team leader is responsible for:calling a PTR购PTR零件对PTR有关文件进行编号管 team meeting;coordinating PTR timing with

in-house part to RDC;delivering the PTR material toline side at right time unless alternative arrangement

4.2生产车间负责在现场为PTR做准备工 are made.

作 为PTR提供设备和工艺的决策依据 配

4

公司机密密级C2 CONFIDENTIAL(LEVEL C2)

participating in evaluating the PTR result and signing

4.4工程组技术支持负责向PTR小组回答更改 of

的详细情况,P T R3天前提供临时技术文件 并

the implementation on floor relevant area;assessing

PPAP批准通知书 发放国产外购件PTR标

签 及时向PTR小组提供PPAP进度 向供 4.4 Product engineering is responsible for replying the应商反馈PTR结果。 details of change to PTR team,providing temporarytechnical documents 3 days before PTR and providing4

5.规定

系统时须实施PTR PRODUCTIONPARTAPPROVALSTATUSNOTICE

5.1.1新零件 因工程更改而引入生产的 of local out sourcing part;distributing PTR tag of local零件带新零件号 。 out sourcing part to supplier;monitoring the PPAPschedule and informing PTR team;feeding back the

5.1.2修正过的零件 因新供应商或供应 PTR result to supplier

商工艺更改等而须进行PPAP的零件

4.6 Production purchasing participates in the whole

5

following parts are introduced:

5.2 PTR程序的启动申请 5.1.1 New part/component: the part/component(with

5.2.1所有进口零件和自制件的PTR由工程组 new part number)which is released by engineering提出。 change.

5.2.2所有国产外购零件的PTR由供应商质

5.2.3所有过时零件的PTR由生产控制组提 process change etc.

5.3在PTR成功结束前 不能启动物料断 5.1.3 Obsolete part: the obsolete part which is reused to点流程以避免在PTR失败后无法采购到 normalproduction with authorization.

公司机密密级C2 CONFIDENTIAL(LEVEL C2)

化生产启动流程。 5.1.4 In principles,all PTR parts should be qualified byPPAP Non PPAPparts need PAA as the authorization

5.4 PTR标签

5.4.1国产外购PTR零件的标签由供应商质

5.4.2进口和自制件PTR零件的标签由生产 be initiated by PE

控制组物流管理于PTR两天前发放给LOC或

initiated by Supplier Quality

5.5 PTR实施时间及数量

launched before PTR successfully completed. This

5.5.2原则上PTR必需进行三轮具体轮数和数量 prevent will shortage of the old material if a PTR fails.由生产车间决定 The trial run of annual localization parts shall followannual localization launch process.

5.5.3 PTR只能开始于日班允许在夜班结束。

5.6在实施PTR前 PE必须根据EWO要求进行

.

5.4.2The PTR tag of import part and in-house part

5.8 PTR文件 should be distributed to LOC or workshop by PC&L

5.8.1申请人负责填写“PTR通知单”并负责获得 material management Two days prior to PTR“同意执行/不执行PTR”的所有签名。 同意不执 implementation.

行的PTR也需编号存档。 5.4.3Manufacturing shop is responsible for hangingPTR tag on in house part.

5.8.2“PTR通知单”上须申请部门区域经理或其授

所有部门需确定一名PTR协调员协调本部门 limited to 10,50,300.Body shop can have more.

公司机密密级C2 CONFIDENTIAL(LEVEL C2)

5.5.3 PTR only start at day shift,night shift canclose it.

7.存档文件

PTR通知单、 决策依据和报告由生产控 5.7 SQE,QE and PE shall be on sitefor PTR’sfirst制组归档保存 保存期5年。 ro u n d

8

 附件四 PTR报告

.

5.8.3PTR report should be finished within one weekafter PTR vehicle off line.IfPTR fails, the reportshould befinished within two days

5.9PTR coordinator

All department shall determine a PTR coordinator tocoordinate all PTR issues related itself.

6.Other applicable Data/Remark

N/A

7. Stored document

PTR notification,decision criteria and report should bestored by PP&C for 5 years.

8.Attachment

 Attachment 1: PTR process

 Attachment 2: PTR notification

 Attachment 3: PTR decision criteria

公司机密密级C2 CONFIDENTIAL(LEVEL C2)

PRO

9.Latest Change Summary

N/A

公司机密密级C2 CONFIDENTIAL(LEVEL C2)

LOCVPS新上日本软银线路VPS,原生IP,8折优惠促销

LOCVPS在农历新年之后新上架了日本大阪机房软银线路VPS主机,基于KVM架构,配备原生IP,适用全场8折优惠码,最低2GB内存套餐优惠后每月仅76元起。LOCVPS是一家成立于2012年的国人VPS服务商,提供中国香港、韩国、美国、日本、新加坡、德国、荷兰、俄罗斯等地区VPS服务器,基于KVM或XEN架构(推荐选择KVM),线路方面均选择国内直连或优化方案,访问延迟低,适合建站或远程办公使用。...

IntoVPS:按小时计费KVM月费5美元起($0.0075/小时),6个机房可选

IntoVPS是成立于2004年的Hosterion SRL旗下于2009年推出的无管理型VPS主机品牌,商家提供基于OpenStack构建的VPS产品,支持小时计费是他的一大特色,VPS可选数据中心包括美国弗里蒙特、达拉斯、英国伦敦、荷兰和罗马尼亚等6个地区机房。商家VPS主机基于KVM架构,最低每小时0.0075美元起($5/月)。下面列出几款VPS主机配置信息。CPU:1core内存:2GB...

Letbox(35美元/年),美国洛杉矶VPS终身7折

Letbox 云服务商在前面的文章中其实也有多次介绍,这个服务商其实也算是比较老牌的海外服务商,几年前我也一直有使用过他们家的VPS主机,早年那时候低至年付15-35美元左右的VPS算式比较稀缺的。后来由于服务商确实比较多,而且也没有太多的网站需要用到,所以就没有续费,最近这个服务商好像有点活动就躁动的发布希望引起他人注意。这不有看到所谓的家中有喜事,应该是团队中有生宝宝了,所以也有借此来发布一些...

ptr为你推荐
暴风影音怎么截图如何在暴风影音中截图?spgnuxps = getCon().prepareStatement(sql);啥意思,求注释,要是不嫌麻烦帮我把下面的也给注释了公章制作如何用photoshop制作公章网站运营网络运营主管的主要工作职责是什么?今日热点怎么删除千牛里面的今日热点怎么取消_?安卓应用平台安卓系统支持的软件并不是那么多,为什么这么多人推崇?办公协同软件oa办公系统软件有哪些如何建立一个网站要建立一个网站怎么弄啊?畅想中国20年后中国会变成什么样?--畅想一下未来的中国!!迅雷云点播账号求一个迅雷云点播vip的账号,只是看的,绝不动任何手脚。
cm域名注册 网站域名备案 汉邦高科域名申请 谷歌域名邮箱 hawkhost 免备案cdn 免费个人博客 台湾谷歌地址 圣诞促销 赞助 阿里校园 河南移动m值兑换 如何用qq邮箱发邮件 新世界服务器 个人免费主页 网通服务器 www789 百度云加速 英雄联盟台服官网 国内域名 更多