验证生产制造工艺可行性 Qualifying the possibility ofmanufacturingprocess.
and re-used obsolete part
3.术语
3.1生产试运行(P T R) 3. T erm s
新零件或更改过的零件投入到制造系 3.1 Production Trial Run(PTR)
统前的受控的先期试生产。 A Production Trial Run is a controlled,advancedproduction tryout of any new or revised part/component
PTR小组为实施某一特定PTR而设立
的非常设机构。成员由车间质量产品工 3.2 PTR team and team leader
The Specs control engineer of PC&L takes theresponsibility of PTR team leader.
4.责任
4.1组长根据申请召集P T R小组会 与生产 4.Re sp on sibiliti e s
车间商定PTR时间 签发PTR通知单 采 4.1 The team leader is responsible for:calling a PTR购PTR零件对PTR有关文件进行编号管 team meeting;coordinating PTR timing with
in-house part to RDC;delivering the PTR material toline side at right time unless alternative arrangement
4.2生产车间负责在现场为PTR做准备工 are made.
作 为PTR提供设备和工艺的决策依据 配
4
公司机密密级C2 CONFIDENTIAL(LEVEL C2)
participating in evaluating the PTR result and signing
4.4工程组技术支持负责向PTR小组回答更改 of
的详细情况,P T R3天前提供临时技术文件 并
the implementation on floor relevant area;assessing
PPAP批准通知书 发放国产外购件PTR标
签 及时向PTR小组提供PPAP进度 向供 4.4 Product engineering is responsible for replying the应商反馈PTR结果。 details of change to PTR team,providing temporarytechnical documents 3 days before PTR and providing4
5.规定
系统时须实施PTR PRODUCTIONPARTAPPROVALSTATUSNOTICE
5.1.1新零件 因工程更改而引入生产的 of local out sourcing part;distributing PTR tag of local零件带新零件号 。 out sourcing part to supplier;monitoring the PPAPschedule and informing PTR team;feeding back the
5.1.2修正过的零件 因新供应商或供应 PTR result to supplier
商工艺更改等而须进行PPAP的零件
4.6 Production purchasing participates in the whole
5
following parts are introduced:
5.2 PTR程序的启动申请 5.1.1 New part/component: the part/component(with
5.2.1所有进口零件和自制件的PTR由工程组 new part number)which is released by engineering提出。 change.
5.2.2所有国产外购零件的PTR由供应商质
5.2.3所有过时零件的PTR由生产控制组提 process change etc.
5.3在PTR成功结束前 不能启动物料断 5.1.3 Obsolete part: the obsolete part which is reused to点流程以避免在PTR失败后无法采购到 normalproduction with authorization.
公司机密密级C2 CONFIDENTIAL(LEVEL C2)
化生产启动流程。 5.1.4 In principles,all PTR parts should be qualified byPPAP Non PPAPparts need PAA as the authorization
5.4 PTR标签
5.4.1国产外购PTR零件的标签由供应商质
5.4.2进口和自制件PTR零件的标签由生产 be initiated by PE
控制组物流管理于PTR两天前发放给LOC或
initiated by Supplier Quality
5.5 PTR实施时间及数量
launched before PTR successfully completed. This
5.5.2原则上PTR必需进行三轮具体轮数和数量 prevent will shortage of the old material if a PTR fails.由生产车间决定 The trial run of annual localization parts shall followannual localization launch process.
5.5.3 PTR只能开始于日班允许在夜班结束。
5.6在实施PTR前 PE必须根据EWO要求进行
.
5.4.2The PTR tag of import part and in-house part
5.8 PTR文件 should be distributed to LOC or workshop by PC&L
5.8.1申请人负责填写“PTR通知单”并负责获得 material management Two days prior to PTR“同意执行/不执行PTR”的所有签名。 同意不执 implementation.
行的PTR也需编号存档。 5.4.3Manufacturing shop is responsible for hangingPTR tag on in house part.
5.8.2“PTR通知单”上须申请部门区域经理或其授
所有部门需确定一名PTR协调员协调本部门 limited to 10,50,300.Body shop can have more.
公司机密密级C2 CONFIDENTIAL(LEVEL C2)
5.5.3 PTR only start at day shift,night shift canclose it.
7.存档文件
PTR通知单、 决策依据和报告由生产控 5.7 SQE,QE and PE shall be on sitefor PTR’sfirst制组归档保存 保存期5年。 ro u n d
8
附件四 PTR报告
.
5.8.3PTR report should be finished within one weekafter PTR vehicle off line.IfPTR fails, the reportshould befinished within two days
5.9PTR coordinator
All department shall determine a PTR coordinator tocoordinate all PTR issues related itself.
6.Other applicable Data/Remark
N/A
7. Stored document
PTR notification,decision criteria and report should bestored by PP&C for 5 years.
8.Attachment
Attachment 1: PTR process
Attachment 2: PTR notification
Attachment 3: PTR decision criteria
公司机密密级C2 CONFIDENTIAL(LEVEL C2)
PRO
9.Latest Change Summary
N/A
公司机密密级C2 CONFIDENTIAL(LEVEL C2)
ucloud6.18推出全球大促活动,针对新老用户(个人/企业)提供云服务器促销产品,其中最低配快杰云服务器月付5元起,中国香港快杰型云服务器月付13元起,最高可购3年,有AMD/Intel系列。当然这都是针对新用户的优惠。注意,UCloud全球有31个数据中心,29条专线,覆盖五大洲,基本上你想要的都能找到。注意:以上ucloud 618优惠都是新用户专享,老用户就随便看看!点击进入:uclou...
阿里云(aliyun)在这个月又推出了一个金秋上云季活动,到9月30日前,每天两场秒杀活动,包括轻量应用服务器、云服务器、云数据库、短信包、存储包、CDN流量包等等产品,其中Aliyun轻量云服务器最低60元/年起,还可以99元续费3次!活动针对新用户和没有购买过他们的产品的老用户均可参与,每人限购1件。关于阿里云不用多说了,国内首屈一指的云服务器商家,无论建站还是学习都是相当靠谱的。活动地址:h...
第一、香港服务器机房这里我们可以看到有提供四个大带宽方案,是全向带宽和国际带宽,前者适合除了中国大陆地区的全网地区用户可以用,后者国际带宽适合欧美地区业务。如果我们是需要大陆地区速度CN2优化的,那就需要选择常规的优化带宽方案,参考这里。CPU内存硬盘带宽流量价格选择E3-12308GB240GB SSD50M全向带宽不限999元/月方案选择E3-12308GB240GB SSD100M国际带宽不...