零件PTR-1205D-生产试运行流程

ptr  时间:2021-02-07  阅读:()

验证生产制造工艺可行性 Qualifying the possibility ofmanufacturingprocess.

and re-used obsolete part

3.术语

3.1生产试运行(P T R) 3. T erm s

新零件或更改过的零件投入到制造系 3.1 Production Trial Run(PTR)

统前的受控的先期试生产。 A Production Trial Run is a controlled,advancedproduction tryout of any new or revised part/component

PTR小组为实施某一特定PTR而设立

的非常设机构。成员由车间质量产品工 3.2 PTR team and team leader

The Specs control engineer of PC&L takes theresponsibility of PTR team leader.

4.责任

4.1组长根据申请召集P T R小组会 与生产 4.Re sp on sibiliti e s

车间商定PTR时间 签发PTR通知单 采 4.1 The team leader is responsible for:calling a PTR购PTR零件对PTR有关文件进行编号管 team meeting;coordinating PTR timing with

in-house part to RDC;delivering the PTR material toline side at right time unless alternative arrangement

4.2生产车间负责在现场为PTR做准备工 are made.

作 为PTR提供设备和工艺的决策依据 配

4

公司机密密级C2 CONFIDENTIAL(LEVEL C2)

participating in evaluating the PTR result and signing

4.4工程组技术支持负责向PTR小组回答更改 of

的详细情况,P T R3天前提供临时技术文件 并

the implementation on floor relevant area;assessing

PPAP批准通知书 发放国产外购件PTR标

签 及时向PTR小组提供PPAP进度 向供 4.4 Product engineering is responsible for replying the应商反馈PTR结果。 details of change to PTR team,providing temporarytechnical documents 3 days before PTR and providing4

5.规定

系统时须实施PTR PRODUCTIONPARTAPPROVALSTATUSNOTICE

5.1.1新零件 因工程更改而引入生产的 of local out sourcing part;distributing PTR tag of local零件带新零件号 。 out sourcing part to supplier;monitoring the PPAPschedule and informing PTR team;feeding back the

5.1.2修正过的零件 因新供应商或供应 PTR result to supplier

商工艺更改等而须进行PPAP的零件

4.6 Production purchasing participates in the whole

5

following parts are introduced:

5.2 PTR程序的启动申请 5.1.1 New part/component: the part/component(with

5.2.1所有进口零件和自制件的PTR由工程组 new part number)which is released by engineering提出。 change.

5.2.2所有国产外购零件的PTR由供应商质

5.2.3所有过时零件的PTR由生产控制组提 process change etc.

5.3在PTR成功结束前 不能启动物料断 5.1.3 Obsolete part: the obsolete part which is reused to点流程以避免在PTR失败后无法采购到 normalproduction with authorization.

公司机密密级C2 CONFIDENTIAL(LEVEL C2)

化生产启动流程。 5.1.4 In principles,all PTR parts should be qualified byPPAP Non PPAPparts need PAA as the authorization

5.4 PTR标签

5.4.1国产外购PTR零件的标签由供应商质

5.4.2进口和自制件PTR零件的标签由生产 be initiated by PE

控制组物流管理于PTR两天前发放给LOC或

initiated by Supplier Quality

5.5 PTR实施时间及数量

launched before PTR successfully completed. This

5.5.2原则上PTR必需进行三轮具体轮数和数量 prevent will shortage of the old material if a PTR fails.由生产车间决定 The trial run of annual localization parts shall followannual localization launch process.

5.5.3 PTR只能开始于日班允许在夜班结束。

5.6在实施PTR前 PE必须根据EWO要求进行

.

5.4.2The PTR tag of import part and in-house part

5.8 PTR文件 should be distributed to LOC or workshop by PC&L

5.8.1申请人负责填写“PTR通知单”并负责获得 material management Two days prior to PTR“同意执行/不执行PTR”的所有签名。 同意不执 implementation.

行的PTR也需编号存档。 5.4.3Manufacturing shop is responsible for hangingPTR tag on in house part.

5.8.2“PTR通知单”上须申请部门区域经理或其授

所有部门需确定一名PTR协调员协调本部门 limited to 10,50,300.Body shop can have more.

公司机密密级C2 CONFIDENTIAL(LEVEL C2)

5.5.3 PTR only start at day shift,night shift canclose it.

7.存档文件

PTR通知单、 决策依据和报告由生产控 5.7 SQE,QE and PE shall be on sitefor PTR’sfirst制组归档保存 保存期5年。 ro u n d

8

 附件四 PTR报告

.

5.8.3PTR report should be finished within one weekafter PTR vehicle off line.IfPTR fails, the reportshould befinished within two days

5.9PTR coordinator

All department shall determine a PTR coordinator tocoordinate all PTR issues related itself.

6.Other applicable Data/Remark

N/A

7. Stored document

PTR notification,decision criteria and report should bestored by PP&C for 5 years.

8.Attachment

 Attachment 1: PTR process

 Attachment 2: PTR notification

 Attachment 3: PTR decision criteria

公司机密密级C2 CONFIDENTIAL(LEVEL C2)

PRO

9.Latest Change Summary

N/A

公司机密密级C2 CONFIDENTIAL(LEVEL C2)

VoLLcloud7折月付$3,香港CMI云服务器原生IP解锁,香港VoLLcloud

vollcloud怎么样?vollcloud LLC创立于2020年,是一家以互联网基础业务服务为主的 技术型企业,运营全球数据中心业务。VoLLcloud LLC针对新老用户推出全场年付产品7折促销优惠,共30个,机会难得,所有产品支持3日内无条件退款,同时提供产品免费体验。目前所有产品中,“镇店之宝”产品性价比高,适用大部分用户基础应用,卖的也是最好,同时,在这里感谢新老用户的支持和信任,我们...

香港服务器多少钱一个月?香港云服务器最便宜价格

香港服务器多少钱一个月?香港服务器租用配置价格一个月多少,现在很多中小型企业在建站时都会租用香港服务器,租用香港服务器可以使网站访问更流畅、稳定性更好,安全性会更高等等。香港服务器的租用和其他地区的服务器租用配置元素都是一样的,那么为什么香港服务器那么受欢迎呢,香港云服务器最便宜价格多少钱一个月呢?阿里云轻量应用服务器最便宜的是1核1G峰值带宽30Mbps,24元/月,288元/年。不过我们一般选...

Hostigger不限流量VPS年20美元

Hostigger 主机商在前面的文章中也有介绍过几次,这个商家运营时间是有一些年份,只不过在我们圈内好像之前出现的次数不多。最近这段时间商家有提供不限流量的VPS主机,逐渐的慢慢被人认识到。在前面的介绍到他们提供的机房还是比较多的,比如土耳其、美国等。今天看到Hostigger 商家居然改动挺大的,原来蛮好的域名居然这次连带官方域名都更换掉去掉一个G(Hostiger )。估摸着这个域名也是之前...

ptr为你推荐
解压程序手机怎么解压文件雅虎社区雅虎是中国的吗无线路由器限速设置无线路由器限速怎么设置!打开网页出现错误网页上有错误怎么解决?邮箱打不开怎么办我的邮箱打不开怎么办1433端口如何打开1433端口网站联盟网站联盟的运作流程不兼容软件和电脑不兼容会怎样?安卓应用平台安卓系统支持的软件并不是那么多,为什么这么多人推崇?神雕侠侣礼包大全神雕侠侣手游每天送的元宝买什么合适
美国免费虚拟主机 申请免费域名 亚洲大于500m fdcservers 私人服务器 腾讯云数据库 koss 20g硬盘 淘宝双十一2018 qq数据库 元旦促销 免费吧 厦门电信 web应用服务器 免费的域名 电信网络测速器 防cc攻击 tracker服务器 免费赚q币 hdchina 更多