零件PTR-1205D-生产试运行流程

ptr  时间:2021-02-07  阅读:()

验证生产制造工艺可行性 Qualifying the possibility ofmanufacturingprocess.

and re-used obsolete part

3.术语

3.1生产试运行(P T R) 3. T erm s

新零件或更改过的零件投入到制造系 3.1 Production Trial Run(PTR)

统前的受控的先期试生产。 A Production Trial Run is a controlled,advancedproduction tryout of any new or revised part/component

PTR小组为实施某一特定PTR而设立

的非常设机构。成员由车间质量产品工 3.2 PTR team and team leader

The Specs control engineer of PC&L takes theresponsibility of PTR team leader.

4.责任

4.1组长根据申请召集P T R小组会 与生产 4.Re sp on sibiliti e s

车间商定PTR时间 签发PTR通知单 采 4.1 The team leader is responsible for:calling a PTR购PTR零件对PTR有关文件进行编号管 team meeting;coordinating PTR timing with

in-house part to RDC;delivering the PTR material toline side at right time unless alternative arrangement

4.2生产车间负责在现场为PTR做准备工 are made.

作 为PTR提供设备和工艺的决策依据 配

4

公司机密密级C2 CONFIDENTIAL(LEVEL C2)

participating in evaluating the PTR result and signing

4.4工程组技术支持负责向PTR小组回答更改 of

的详细情况,P T R3天前提供临时技术文件 并

the implementation on floor relevant area;assessing

PPAP批准通知书 发放国产外购件PTR标

签 及时向PTR小组提供PPAP进度 向供 4.4 Product engineering is responsible for replying the应商反馈PTR结果。 details of change to PTR team,providing temporarytechnical documents 3 days before PTR and providing4

5.规定

系统时须实施PTR PRODUCTIONPARTAPPROVALSTATUSNOTICE

5.1.1新零件 因工程更改而引入生产的 of local out sourcing part;distributing PTR tag of local零件带新零件号 。 out sourcing part to supplier;monitoring the PPAPschedule and informing PTR team;feeding back the

5.1.2修正过的零件 因新供应商或供应 PTR result to supplier

商工艺更改等而须进行PPAP的零件

4.6 Production purchasing participates in the whole

5

following parts are introduced:

5.2 PTR程序的启动申请 5.1.1 New part/component: the part/component(with

5.2.1所有进口零件和自制件的PTR由工程组 new part number)which is released by engineering提出。 change.

5.2.2所有国产外购零件的PTR由供应商质

5.2.3所有过时零件的PTR由生产控制组提 process change etc.

5.3在PTR成功结束前 不能启动物料断 5.1.3 Obsolete part: the obsolete part which is reused to点流程以避免在PTR失败后无法采购到 normalproduction with authorization.

公司机密密级C2 CONFIDENTIAL(LEVEL C2)

化生产启动流程。 5.1.4 In principles,all PTR parts should be qualified byPPAP Non PPAPparts need PAA as the authorization

5.4 PTR标签

5.4.1国产外购PTR零件的标签由供应商质

5.4.2进口和自制件PTR零件的标签由生产 be initiated by PE

控制组物流管理于PTR两天前发放给LOC或

initiated by Supplier Quality

5.5 PTR实施时间及数量

launched before PTR successfully completed. This

5.5.2原则上PTR必需进行三轮具体轮数和数量 prevent will shortage of the old material if a PTR fails.由生产车间决定 The trial run of annual localization parts shall followannual localization launch process.

5.5.3 PTR只能开始于日班允许在夜班结束。

5.6在实施PTR前 PE必须根据EWO要求进行

.

5.4.2The PTR tag of import part and in-house part

5.8 PTR文件 should be distributed to LOC or workshop by PC&L

5.8.1申请人负责填写“PTR通知单”并负责获得 material management Two days prior to PTR“同意执行/不执行PTR”的所有签名。 同意不执 implementation.

行的PTR也需编号存档。 5.4.3Manufacturing shop is responsible for hangingPTR tag on in house part.

5.8.2“PTR通知单”上须申请部门区域经理或其授

所有部门需确定一名PTR协调员协调本部门 limited to 10,50,300.Body shop can have more.

公司机密密级C2 CONFIDENTIAL(LEVEL C2)

5.5.3 PTR only start at day shift,night shift canclose it.

7.存档文件

PTR通知单、 决策依据和报告由生产控 5.7 SQE,QE and PE shall be on sitefor PTR’sfirst制组归档保存 保存期5年。 ro u n d

8

 附件四 PTR报告

.

5.8.3PTR report should be finished within one weekafter PTR vehicle off line.IfPTR fails, the reportshould befinished within two days

5.9PTR coordinator

All department shall determine a PTR coordinator tocoordinate all PTR issues related itself.

6.Other applicable Data/Remark

N/A

7. Stored document

PTR notification,decision criteria and report should bestored by PP&C for 5 years.

8.Attachment

 Attachment 1: PTR process

 Attachment 2: PTR notification

 Attachment 3: PTR decision criteria

公司机密密级C2 CONFIDENTIAL(LEVEL C2)

PRO

9.Latest Change Summary

N/A

公司机密密级C2 CONFIDENTIAL(LEVEL C2)

IMIDC(rainbow cloud):香港/台湾/日本/莫斯科独立服务器特价,闪购大促销,最低30usd/月起

imidc怎么样?imidc彩虹网路,rainbow cloud知名服务器提供商。自营多地区数据中心,是 Apnic RIPE Afrinic Arin 认证服务商。拥有丰富的网路资源。 在2021年 6.18 开启了输血大促销,促销区域包括 香港 台湾 日本 莫斯科 等地促销机型为 E3係,参与促销地区有 香港 日本 台湾 莫斯科 等地, 限量50台,售罄为止,先到先得。所有服务器配置 CPU ...

41云,服务器8折优惠券,200G TCP防御

41云怎么样?41云是国人主机品牌,目前经营产品有国内外云服务器、CDN(高防CDN)和物理机,其中国内外云服务器又细分小类有香港限流量VPS、香港大带宽VPS、香港弹性自选VPS、香港不限流VPS、香港BGP线路VPS、香港Cera+大带宽机器、美国超防VPS、韩国原生VPS、仁川原生VPS、日本CN2 VPS、枣庄高防VPS和金华高防VPS;物理机有美国Cera服务器、香港单程CN2服务器、香...

TNAHosting($5/月)4核/12GB/500GB/15TB/芝加哥机房

TNAHosting是一家成立于2012年的国外主机商,提供VPS主机及独立服务器租用等业务,其中VPS主机基于OpenVZ和KVM架构,数据中心在美国芝加哥机房。目前,商家在LET推出芝加哥机房大硬盘高配VPS套餐,再次刷新了价格底线,基于OpenVZ架构,12GB内存,500GB大硬盘,支持月付仅5美元起。下面列出这款VPS主机配置信息。CPU:4 cores内存:12GB硬盘:500GB月流...

ptr为你推荐
行业关键词为什么有些行业关键词竟价出价很低有些行业很高pwpw域名的技巧1433端口1433端口怎么打开办公协同软件免费的多人协同办公软件哪些,我了解的有钉钉、企业微信,其他的还有么?网易公开课怎么下载网易公开课的视频该如何下载?硬盘人电脑对人有多大辐射?ios7固件下载iOS7如何升级固件?xv播放器下载xv播放器怎么下载?xv播放器下载求手机可以看xv格式的视频播放器畅想中国淄博畅想中国消费怎么样
tk域名注册 如何查询ip地址 息壤备案 linode代购 BWH 北京双线机房 bgp双线 服务器维护方案 服务器是干什么的 qq对话框 cdn加速是什么 metalink 国外视频网站有哪些 免费mysql数据库 360云服务 网通服务器 atom处理器 买空间网 cpu使用率过高怎么办 在线tracert 更多