零件PTR-1205D-生产试运行流程

ptr  时间:2021-02-07  阅读:()

验证生产制造工艺可行性 Qualifying the possibility ofmanufacturingprocess.

and re-used obsolete part

3.术语

3.1生产试运行(P T R) 3. T erm s

新零件或更改过的零件投入到制造系 3.1 Production Trial Run(PTR)

统前的受控的先期试生产。 A Production Trial Run is a controlled,advancedproduction tryout of any new or revised part/component

PTR小组为实施某一特定PTR而设立

的非常设机构。成员由车间质量产品工 3.2 PTR team and team leader

The Specs control engineer of PC&L takes theresponsibility of PTR team leader.

4.责任

4.1组长根据申请召集P T R小组会 与生产 4.Re sp on sibiliti e s

车间商定PTR时间 签发PTR通知单 采 4.1 The team leader is responsible for:calling a PTR购PTR零件对PTR有关文件进行编号管 team meeting;coordinating PTR timing with

in-house part to RDC;delivering the PTR material toline side at right time unless alternative arrangement

4.2生产车间负责在现场为PTR做准备工 are made.

作 为PTR提供设备和工艺的决策依据 配

4

公司机密密级C2 CONFIDENTIAL(LEVEL C2)

participating in evaluating the PTR result and signing

4.4工程组技术支持负责向PTR小组回答更改 of

的详细情况,P T R3天前提供临时技术文件 并

the implementation on floor relevant area;assessing

PPAP批准通知书 发放国产外购件PTR标

签 及时向PTR小组提供PPAP进度 向供 4.4 Product engineering is responsible for replying the应商反馈PTR结果。 details of change to PTR team,providing temporarytechnical documents 3 days before PTR and providing4

5.规定

系统时须实施PTR PRODUCTIONPARTAPPROVALSTATUSNOTICE

5.1.1新零件 因工程更改而引入生产的 of local out sourcing part;distributing PTR tag of local零件带新零件号 。 out sourcing part to supplier;monitoring the PPAPschedule and informing PTR team;feeding back the

5.1.2修正过的零件 因新供应商或供应 PTR result to supplier

商工艺更改等而须进行PPAP的零件

4.6 Production purchasing participates in the whole

5

following parts are introduced:

5.2 PTR程序的启动申请 5.1.1 New part/component: the part/component(with

5.2.1所有进口零件和自制件的PTR由工程组 new part number)which is released by engineering提出。 change.

5.2.2所有国产外购零件的PTR由供应商质

5.2.3所有过时零件的PTR由生产控制组提 process change etc.

5.3在PTR成功结束前 不能启动物料断 5.1.3 Obsolete part: the obsolete part which is reused to点流程以避免在PTR失败后无法采购到 normalproduction with authorization.

公司机密密级C2 CONFIDENTIAL(LEVEL C2)

化生产启动流程。 5.1.4 In principles,all PTR parts should be qualified byPPAP Non PPAPparts need PAA as the authorization

5.4 PTR标签

5.4.1国产外购PTR零件的标签由供应商质

5.4.2进口和自制件PTR零件的标签由生产 be initiated by PE

控制组物流管理于PTR两天前发放给LOC或

initiated by Supplier Quality

5.5 PTR实施时间及数量

launched before PTR successfully completed. This

5.5.2原则上PTR必需进行三轮具体轮数和数量 prevent will shortage of the old material if a PTR fails.由生产车间决定 The trial run of annual localization parts shall followannual localization launch process.

5.5.3 PTR只能开始于日班允许在夜班结束。

5.6在实施PTR前 PE必须根据EWO要求进行

.

5.4.2The PTR tag of import part and in-house part

5.8 PTR文件 should be distributed to LOC or workshop by PC&L

5.8.1申请人负责填写“PTR通知单”并负责获得 material management Two days prior to PTR“同意执行/不执行PTR”的所有签名。 同意不执 implementation.

行的PTR也需编号存档。 5.4.3Manufacturing shop is responsible for hangingPTR tag on in house part.

5.8.2“PTR通知单”上须申请部门区域经理或其授

所有部门需确定一名PTR协调员协调本部门 limited to 10,50,300.Body shop can have more.

公司机密密级C2 CONFIDENTIAL(LEVEL C2)

5.5.3 PTR only start at day shift,night shift canclose it.

7.存档文件

PTR通知单、 决策依据和报告由生产控 5.7 SQE,QE and PE shall be on sitefor PTR’sfirst制组归档保存 保存期5年。 ro u n d

8

 附件四 PTR报告

.

5.8.3PTR report should be finished within one weekafter PTR vehicle off line.IfPTR fails, the reportshould befinished within two days

5.9PTR coordinator

All department shall determine a PTR coordinator tocoordinate all PTR issues related itself.

6.Other applicable Data/Remark

N/A

7. Stored document

PTR notification,decision criteria and report should bestored by PP&C for 5 years.

8.Attachment

 Attachment 1: PTR process

 Attachment 2: PTR notification

 Attachment 3: PTR decision criteria

公司机密密级C2 CONFIDENTIAL(LEVEL C2)

PRO

9.Latest Change Summary

N/A

公司机密密级C2 CONFIDENTIAL(LEVEL C2)

DiyVM(50元起)老牌商家,香港沙田CN2直连vps/不限流量/五折终身优惠

diyvm怎么样?diyvm是一家国内成立时间比较久的主机商家了,大约在6年前站长曾经用过他家的美国机房的套餐,非常稳定,适合做站,目前商家正在针对香港沙田机房的VPS进行促销,给的是五折优惠,续费同价,香港沙田机房走的是CN2直连的线路,到大陆地区的速度非常好,DiyVM商家采用小带宽不限流量的形式,带宽2Mbps起步,做站完全够用,有需要的朋友可以入手。diyvm优惠码:五折优惠码:OFF50...

CloudCone(1.99美元),可以额外选择Voxility高防IP

CloudCone 商家也是比较有特点的,和我们熟悉的DO、Vultr、Linode商家均是可以随时删除机器开通的小时计费模式。这个对于有需要短租服务器的来说是比较有性价比的。但是,他们还有一个缺点就是机房比较少,不同于上面几个小时计费服务商可以有多机房可选,如果有这个多机房方案的话,应该更有特点。这次我们可以看到CloudCone闪购活动提供洛杉矶三个促销方案,低至月付1.99美元。商家也可以随...

RAKsmart美国洛杉矶独立服务器 E3-1230 16GB内存 限时促销月$76

RAKsmart 商家我们应该较多的熟悉的,主营独立服务器和站群服务器业务。从去年开始有陆续的新增多个机房,包含韩国、日本、中国香港等。虽然他们家也有VPS主机,但是好像不是特别的重视,价格上特价的时候也是比较便宜的1.99美元月付(年中活动有促销)。不过他们的重点还是独立服务器,毕竟在这个产业中利润率较大。正如上面的Megalayer商家的美国服务器活动,这个同学有需要独立服务器,这里我一并整理...

ptr为你推荐
暴风影音怎么截图暴风影音怎么截屏啊?公章制作word里如何制作公章?伪静态静态与伪静态的区别?安卓应用平台现在android平台的手机都有哪些?中小企业信息化小企业需要信息化吗?需要的话要怎么实现信息化呢?ios7固件下载ios7发布当天是否有固件下载qq空间打扮QQ空间打扮宽带接入服务器网络已连接,可无法连接到服务器为什么?网络已连接,可无法连接到服务如何清理ie缓存怎么清理IE的缓存网站营运网站运营要学些什么?
linuxapache虚拟主机 怎样申请域名 免费顶级域名 google镜像 enom linode日本 网站保姆 directadmin ixwebhosting 网站被封 cdn联盟 双线主机 双11秒杀 华为云盘 稳定空间 中国电信宽带测速 双11促销 nano 极域网 电脑主机声音大 更多